HomeMy WebLinkAboutold PlanSD
è
è
è
è
è
è
è
è
è
è
è
SDSDSDSDSDSDFOPFOP FOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOP FOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPFOPWL WL WL WL WL
D
D
D
D
D
D
D
D
EE
E
E
E
E
E
E
FO
FO
FO
DMH NO.:4
DMH NO.:5
DMH NO.:6
DMH NO.:7
DMH NO.:8
36" RCP:
FL: 561.1'
DMH NO.:9
DMH NO.:10
DMH NO.:11
UGE
UGE UGE
UGE
UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE
GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS
WL
WL WL WL
WL WL WL WL WL WL
WL
WL
WL
WL
WL
WL
WL WL WL WL WL
WLUGESDSDèèèèèèèèèèèèèèèèèèèèèèèèèèS
SMH NO.:1
RIM ELEVATION: 628.70'
INVERT SE (6" PVC): 621.7'
INVERT S (6" PVC): 621.6'S07°08'59"W311.3'±SD
SD
SDSDT161
T160
T159
T158
T157
T156T155T154
T152
T151
T139
T138
T137
T136
T135
T131
T108
T107
T87
T86
T85
T84
T83
T82
T81
T80
T79
T78
T77
T76
T75
T74
T73
T72
T70T69
T68
T67
T66
T59
T51
T44
T43
T42
T41
T40
T39
T38
T37
T36
T35
T34
T32
T31
T30
T29
T28
T27
T26
T25
T24
T23
T22
T21
T20
T19
T18
T17T16
T15
T14
T13
T12
T11
T10
T9
T8T7
T6
T5
T4
T3
T2
T1
T
H DY
HDYHDY
W W
contents.
design.
date.
project.
5432
B
C
D
1
A
issue for review:
issue for pricing:
revisions:
issue for construction:
ALL SUBCONTRACTORS ARE RESPONSIBLE FOR
REVIEWING ALL CONTRACT DOCUMENTS
(INCLUDING SHEETS, DRAWINGS, GENERAL
NOTES, SPECIFICATIONS, ETC.) AS PROVIDED BY
THE ARCHITECT OR ANY OTHER CONSULTANT.
REFER TO SHEETS G0.00 - G0.03 FOR ALL
GENERAL NOTES RELATIVE TO THE SCOPE OF
WORK AND TYPES OF DRAWINGS, ELEMENTS,
AND INSTRUCTIONS FOUND ON THIS SHEET.CHRIST COMMUNITY CHURCHTRACT 17, CHENAL VALLEYLITTLE ROCK, AR 72223C3
2023.12.22
PERMIT SET
L I T T L E R O C K | R O G E R S | W Y N N E
w w w .e c o l o g i c a l d g .c o m
p h o n e : 5 0 1 3 7 8 0 2 0 0
E :G
E cological :ei ign G h okp" I nc
2023.12.22
2023.12.22
1 SCALE: 1" = 50'-0"
100'
0'
200'OVERALL UTILITY PLAN
50'NORTH
C2.00
OVERALL UTILITY PLAN
C2.01
C2.02
C2.03
C2.04
SQ.FT.
N/F
C/L
R/W
(M)
(R)
N/G
CONC.
P.O.B.
P.O.C.
BOC:
FL:
TA:
TC:
CR:
NG:
BB:
EA:
TB:
EC:
è è
EXISTING LEGEND
FOUND MONUMENT
AS-NOTED
SET MONUMENT
AS-NOTED
TEMPORARY
BENCHMARK (TBM)
SANITARY SEWER
MANHOLE (SMH)
STORM SEWER
MANHOLE (DMH)
CURB INLET (CI)
DRAINAGE OUTLET
AS-NOTED
ELECTRICAL VAULT
LIGHT POLE
CROSSWALK SIGNAL
POST
TRAFFIC SIGNAL POST
FIBER OPTIC
UTILITY MARKER
FIBER OPTIC VAULT
MEASURED/CALCULATED
DIMENSION
RECORD DIMENSION
CENTERLINE
RIGHT-OF-WAY
NOW OR FORMERLY
NATURAL GROUND
CONCRETE
POINT OF COMMENCEMENT
POINT OF BEGINNING
SQUARE FEET
BACK OF CURB
FLOW LINE
TOP OF ASPHALT
TOP OF CONCRETE
NATURAL GROUND
CROWN OF ROAD
EDGE OF ASPHALT
EDGE OF CONCRETE
TOP OF BANK
BOTTOM OF BANK
PROPERTY LINE
CENTERLINE RIGHT-
OF-WAY
RIGHT-OF-WAY
UNDERGROUND
GAS LINE
UNDERGROUND
SANITARY SEWER LINE
UNDERGROUND
ELECTRICAL LINE
UNDERGROUND FIBER
OPTIC LINE
UNDERGROUND
WATER LINE
UNDERGROUND
STORM SEWER LINE
MAJOR CONTOUR
MINOR CONTOUR
FLOW LINE
DRIP LINE
PROPOSED UTILITY LEGEND
WATER LINE
WATER METER
SANITARY SEWER
UNDERGROUND
ELECTRIC LINES/CONDUIT
TRANSFORMER AND
CONCRETE PADT
GAS LINE
G GAS METER
W
OVERHEAD ELECTRIC
FIBER LINE
COMMUNICATION LINEHDY
FDC
FIRE HYDRANT
WATER VALVE