HomeMy WebLinkAboutS-1308 Staff AnalysisMay 3, 2001
ITEM NO.: A
NAME: Rocky - Replat
FILE NO.: S-1308
LOCATION: Southeast corner of Baseline Road and Chicot Road
LMT.T/-TT.TW%-M .
Yelenich Family Revocable Living Trust Laha Engineers, Inc.
5706 Partridge Lane P. O. Box 190251
No. Little Rock, AR 72118 Little Rock, AR 72219
AREA: approximately 3.23 acres
FT. NEW STREET: 0
ZONING: C-3
PLANNING DISTRICT: 15
CENSUS TRACT: 41.06
NUMBER OF LOTS: 3
VARIANCES/WAIVERS REQUESTED:
1. A variance to allow reduced rear platted building lines
(Lots 1 and 2).
2_ A waiver of right-of-way dedication for Baseline and Chicot
Roads.
3. A waiver of street improvements for Baseline and Chicot
Roads.
A. PROPOSAL:
The applicant proposes to replat the two (2) existing lots
at the southeast corner of Baseline and Chicot Roads into
three (3) lots. The applicant proposes to construct an auto
parts store on the newly created lot (Lot 1). Lot 2 as
shown on the proposed replat contains a service station,
May 3, 2001
ITEM NO.: A (Cont.) FILE NO.: S-1308
which will be removed in the future with development of a
new convenience store. The south and east lot lines of this
existing lot are proposed to be slightly adjusted, with Lot
2 being enlarged. Lot 3 contains an existing commercial
building, formerly a Fred's Store.
The applicant is requesting a variance for reduced rear
platted building setbacks for Lots 1 and 2. A 5-foot rear
platted building line is proposed for each of these lots.
The applicant is requesting a waiver of additional required
right-of-way dedication for Baseline and Chicot Roads. The
applicant is also requesting a waiver of additional street
improvements for Baseline and Chicot Roads.
B. EXISTING CONDITIONS:
There is a vacant commercial building (old Fred's Store) on
Lot 3 of the proposed replat, with a service station on Lot
2. The area proposed for Lot 1 is asphalt parking area for
the existing commercial building.
There is a mixture of commercial uses to the east and to the
north across Baseline Road. There is a church across Chicot
Road to the west. There is an Entergy sub -station
immediately south of this site, with commercial uses further
south.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received no comment from the
neighborhood. The Chicot, Cloverdale, West Baseline and
SWLR UP Neighborhood Associations were notified of the
public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1.South edge of property is in floodplain.
2. Baseline and Chicot Roads are classified as principal
arterials on the Master Street Plan. A dedication of
right-of-way to 45 feet from centerlines is required.
3.A Grading Permit for Special Flood Hazard Area, per Sec.
8-283 will be required.
4.A development permit for Flood Hazard, per Sec. 8-283
will be required.
2
May 3, 2001
ITEM NO.: A (Cont.)
FILE NO.: S-1308
5. Provide design of streets conforming to Master Street
Plan. Construct right turn lane from Chicot Road onto
Baseline Road.
6.Driveway locations shall conform to Ordinance 18,031.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comment.
ARKIA: No Comment received.
Southwestern Bell: No Comment received.
Water: An acreage charge of $150 per acre applies in
addition to normal fees in this area.
Fire Department: No Comment.
County Planning: No Comment received.
CATA: Project site is located on bus routes 17 and 17A,
but has no effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
No Comment.
Landscape Issues:
No Comment.
G. SUBDIVISION COMMITTEE COMMENT:
(MARCH 29, 2001)
Rocky Yelenich and Troy Laha were present, representing the
application. Staff briefly described the proposed replat
and noted several items which needed to be shown on the
replat drawing.
The Public Works requirements were discussed at length,
primarily right-of-way dedication. Cross -access and
parking easements were briefly discussed. Mr. Yelenich
noted that the existing drive near the east property line of
Lot 1 would be closed, with shared access from Baseline Road
between Lots 1 and 2.
3
May 3, 2001
ITEM NO.: A (Cont.) FILE NO.: 5-1308
Staff noted that based on the C-3 zoning of the property,
the front platted building lines could be reduced to 25
feet. The front building lines were originally platted at
40 feet. Staff noted that the reduction of the front
building lines was based on the required right-of-way being
dedicated. This issue was discussed.
After the discussion, the Committee forwarded the replat to
the full Commission for resolution.
H. ANALYSIS:
The applicant submitted a revised replat drawing to staff on
April 4, 2001. The revised replat addresses some of the
issues as raised by staff and the Subdivision Committee.
Street centerlines, descriptions of monuments and the
required legal description have been noted.
The applicant has also submitted a parking plan for Lot 3.
The plan shows that there will be 90 parking spaces
remaining on Lot 3 to serve the existing commercial
building. The ordinance requires a minimum of 64 spaces for
the existing building. Therefore, the creation of Lot 1
does not encroach into the required parking for the existing
commercial building.
As noted in paragraph A., the applicant is requesting
waivers of the Master Street Plan right-of-way dedication
and street improvements to Baseline and Chicot Roads. The
required right-of-way for both streets is 45 feet from
existing street centerlines. This would mean an additional
five (5) feet of dedication along Baseline Road and an extra
width varying from five (5) feet to ten (10) feet along the
Chicot Road frontage. The revised replat submitted shows an
additional five (5) feet of dedication along a portion of
Baseline Road, which would bring the overall right-of-way on
this street to 40 feet from centerline. The applicant is
also requesting a waiver of street improvements to these
streets, which would include construction of a right turn
lane from Chicot Road onto Baseline Road. Public Works
recommends denial of the waivers as requested.
As noted in paragraph G., the C-3 zoning of the property
allows a 25 foot front platted building line. The front
platted building lines on this property were platted at 40
feet years ago. The revised replat submitted shows 25 foot
4
May 3, 2001
ITEM NO.: A (Cont.)
FILE NO.: S-1308
platted building lines for the proposed lots,.but the 25
foot measurement was made from the existing front property
lines. Staff feels that if the original 40 foot front
platted building lines are reduced to 25 feet, the 25 foot
measurement should be taken from the required Master Street
Plan right-of-way line.
Also, the applicant is requesting a reduced rear yard
setback line for Lots 1 and 2. The required rear yard
setback in C-3 zoning is 25 feet. The applicant is
requesting a five (5) foot rear yard setback for these two
lots. Staff will only support the rear yard setback
variance if the required Master Street Plan right-of-way is
dedicated. Without the required right-of-way dedication,
staff feels that there is no hardship nor justification for
the setback variance.
Although staff has no objection to the concept of a replat
to create Lot 1 and adjust the south and east property lines
for Lot 2, staff cannot fully support the replat until the
outstanding issues mentioned in this paragraph are resolved.
I. STAFF RECOMMENDATIONS:
Staff recommends approval of the proposed replat subject to
the following conditions:
1.Compliance with the requirements as noted in paragraphs D
and E of this report.
2. Staff recommends that the front 25 foot platted building
line be measured from the required Master Street Plan
right-of-way line.
3. Staff recommends denial of the rear yard setback variance
if the required right-of-way is not dedicated.
4. Staff recommends denial of the waivers of right-of-way
dedication and street improvements.
PLANNING COMMISSION ACTION:
(APRIL 19, 2001)
Rocky Yelenich and Troy Laha were present, representing the
application. Staff briefly described the replat and noted that
the Commission needed to address a bylaw waiver for the
notification before hearing the item. There were no objectors
present.
5
May 3, 2001
ITEM NO.: A (Cont.)
FILE NO.: S-1308
Rocky Yelenich explained that he did not obtain an abstract list
of adjacent property owners, but researched the county records
and created his own property owner list. He stated that he hand -
delivered a notice to each of these owners and obtained their
signatures. The Commission reviewed the notice and signatures as
presented by Mr. Yelenich.
Commissioner Adcock noted that the neighborhood associations in
the area knew about the proposed development and supported the
development.
Commissioner Faust noted that two (2) neighborhood associations
submitted letters supporting the plat.
Commissioner Rahman stated that he was concerned with setting
precedence in waiving the bylaws.
Mr. Yelenich noted that the developers of Lot 1 were ready to
proceed with development of this lot.
Staff expressed concern that an abstract list was not used to
notify adjacent property owners. There was a general discussion
of a possible bylaw waiver and the required notice procedure.
There was a motion to defer the application to the May 3, 2001
Planning Commission agenda. The motion was discussed. The
Commission noted that the applicant needed to obtain an abstract
list and verify that he notified all of the required adjacent
property owners. If any of the property owners were not
notified, the Commission instructed the applicant to do so as
soon as possible. The staff was to review the abstract list
and parties given notice and report to the Commission on
May 3, 2001. The motion passed by a vote of 7 ayes, 0 nays and
4 absent.
PLANNING COMMISSION ACTION:
(MAY 30, 2001)
Troy Laha and Rocky Yelenich were present, representing the
application. Staff briefly described the proposed replat. Staff
noted that the front platted building lines along Baseline and
Chicot Roads had been revised to 40 feet. With this being done,
staff noted support of the variance for reduced rear yard setback
for Lots 1 and 2. Staff noted a recommendation of denial of the
requested waivers for right-of-way dedication for Baseline and
Chicot Roads and right turn lane construction on Chicot Road.
May 3, 2001
ITEM NO.: A (Cont.)
FILE NO.: 5-1308
Staff noted that the applicant mailed the required certified mail
notices as per an abstract list on April 20, 2001. Staff
informed the Commission that a waiver of the bylaws was in order
to approve the notices being two (2) days late. There was a
motion to approve the bylaw waiver and accept the notification as
completed by the applicant. The motion passed by a vote of 10
ayes, 0 nays and 1 absent.
Troy Laha addressed the Commission in support of the replat. He
noted that the applicant requested a waiver of the right-of-way
dedication for Baseline and Chicot Roads and a waiver of the
required street improvements (right turn lane) on Chicot Road.
He discussed the reasons for the waiver requests. He noted that
three (3) existing driveways along the property frontage would be
eliminated and replaced with curb and gutter. He noted that the
property was not in the floodplain.
Norm Floyd, with SWLR UP and West Baseline Neighborhood
Associations, noted that both groups supported the project. He
noted a desire to have opaque screening along the south side of
the property.
Mr. Laha noted that the applicant agreed to the opaque fencing.
He noted that this would be done to deter parking on this
property for the fireworks display/sales on the south property.
He also noted that there would be no pay phones on this property
and no parking of vehicles overnight.
Bob Turner, Director of Public Works, discussed the required
right-of-way dedication and street improvements. He noted that
Public Works supported the driveway locations with the removal of
three existing drives. Mr. Turner recommended that the right
turn lane on Chicot Road be constructed.
Commissioner Adcock asked if the right turn lane was warranted.
Mr. Turner noted that it was and explained.
Commissioner Nunnley asked if there was a right turn lane on
Baseline Road north. Mr. Turner commented that there was not.
There was a discussion of when the State Highway Department made
the improvements to Baseline and Chicot Roads. Mr. Turner and
Mr. Laha indicated that the Baseline improvements were done
within the last 10 years and the Chicot improvements were done
around 1985. There was additional discussion of this issue.
7
May 3, 2001
ITEM NO.: A (Cont.) FILE NO.: S-1308
Commissioner Rahman asked about the length of the required turn
lane. Mr. Turner noted that it needed to be 200 feet with a 50
foot taper. There was additional discussion of the Public Works
issues.
Mr. Laha noted that the State had no plans to widen Chicot Road
and needed no additional right-of-way.
Commissioner Nunnley asked about the impact should the Planning
Commission approve the right-of-way waiver. Mr. Turner indicated
that there would be no significant impact on Baseline and
discussed.
Commissioner Nunnley asked about traffic signals at the
intersection. Mr. Turner noted that there was standard
signalization at the intersection.
Commissioner Adcock expressed concern about the accident rate at
this intersection. This issue was briefly discussed.
There was a main motion to approve the replat subject to the
conditions as noted by staff, to include approval of the variance
for reduced rear yard setback for Lots 1 and 2 and denial of the
waiver requests for right-of-way dedication for Baseline and
Chicot Roads and improvements to Chicot Road.
There was a discussion of the right-of-way requirement and a past
issue at West Markham Street and Mississippi Avenue. Mr. Turner
explained the issue.
There was a motion to amend the main motion and approve the
waiver request for right-of-way dedication for Baseline Road.
The motion failed by a vote of 2 ayes, 8 nays and 1 absent.
There was a second motion to amend the main motion and approve
the waiver request for right-of-way dedication for Chicot Road.
The motion failed by a vote of 1 ayes, 9 ayes and 1 absent.
Commissioner Faust asked if an in -lieu contribution could be made
for the street improvements. Mr. Lowery stated that in -lieu
could be made for the improvements and explained.
There was a third motion to amend the main motion and approve the
waiver request for right turn lane construction on Chicot Road.
The motion failed by a vote of 2 ayes, 8 nays and 1 absent.
8
May 3, 2001
ITEM NO.: A (Cont.)
FILE NO.: 5-1308
Chairman Downing called for a vote on the main motion. The main
motion passed by a vote of 10 ayes, 0 nays and 1 absent.
E