Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S-1301-K Applicaion
CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME —Colonel Glenn Centre Lot 2 INSPECTOR REPORT 1 have made a final inspection of the improvements and find that: Ap 19,044r +r OLIk s All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain ncompleted and a punch list has been prepared and sent. 6- gy Engineering Specialist Date: —Z 3 ADDRESSING SPECIALIST'S REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: L/ All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the nYnnber of street signs ordered for this plat for billing to developer '_ ain improvements remain uncompleted and a punch list has been prepared and sent. ���• K S��M w f Traffic Engineer Date:y1�� CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. AJO 5-.LV6r",.o-'A4.R1 V �►t, eD� q Civil Engineer I/II Date: 8 /2 r 11 3 SURVEYOR'S REPORT I have reviewed the plat and find that: I requirements for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. Date: 2311 Design Review Engineer/Civil Engineering Manager August 20, 2013 Date:(? —7,69 —(,3 Print Page 1 of 2 Subject: FW: 4- final plats From: Zinser, Brandon M (Brandon.Zinser@centerpointenergy.com) To: mcgetrick2@sbcglobal.net; Cc: joni.bates@centerpointenergy.com; andrew.townsend@centerpointenergy.com; Date: Monday, August 12, 2013 2:15 PM Pat, CenterPoint Energy has no objection to the plats as attached. Thanks, Brandon M. Zinser, P.E. Engineer III Southern Gas Operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Direct:501-377-4930 1 Fax:501-377-4733 1 Mobile:501-425-2289 CenterPoint Energy From: Bates, Joni B. Sent: Friday, July 05, 2013 12:10 PM To: Zinser, Brandon M Subject: Fwd: 4- final plats Will you please take care of these for Pat. Thanks, Joni http://us-mg205.mail.yahoo.com/neo/launch?.partner=sbc&.rand=4Oj9o7vfdu32v 9/11/2013 Print Page 2 of 2 Sent from my Whone Begin forwarded message: From: MCGETRICK MCGETRICK cmc9etrick2@sbcglobal.net> Date: July 5, 2013, 10:37:46 AM CDT To: Jim Boyd c'im.bo d 1rwu.com> Cc: "tthomp 1 cr entergy.com" <tthomp 1(c�r�entergy.com>, 'Bates, Joni B." <joni.batesfc� ,centerpointenergY comma, blake weindorf <blake.weindorf@carkw.com>, daniel tull <daniel,tullAcarkw.com>, "an0142katt.com" <an0142 a att.com> Subject: 4- final plats Reply -To: MCGETRICK MCGETRICK <mcgetrick2nsbcglobal.net> I have attached 4 final plats for your sign -off. If you have any questions please contact us. Thanks, Pat http://us-mg205.mail.yahoo.com/neo/launch?.partner=sbc&.rand=4Oj 9o7vfdu32v 9/ 11 /2013 a o ti �Zs'3ppis In 0 �49 9O� �1 a n, Iail s cn 4Q Ropju z 0 �p j x 0 rO 3 y z r �r 00 z a z-%.0 z r �0�y 51-9 = �a Z3 ed O,Taty, av S r1 pJ W lA = eD m m �" °' , r C.ID Q e (D eD M 0 e s 0 Z Ismemmummmi m N p iS N Dg' 292.43' N 0138'35' F_ 00+Lf7AFlipN. 69.39' ;TRE DR iPPoVATE) I� 1 +l yb s I ci O r O rN r _ f zl Z 0 ROD> S 0153'18" W 277.90' a$ rn COLONEL GLENN CENTRE DR. (PRIVATE) O wi W ACCESS EASEMENT Q UXITY EASEMENT V 118A a p I pyr N y �Q]SQ Y 66 'oil °a a 1y Print Page 1 of 1 Subject: RE: FINAL PLAT SIGN OFF KANIS BUSINESS PARK From: THOMPSON, THEODIS (TTHOMP1@entergy.com) To: mcgetrick2@sbcglobal.net; Date: Tuesday, August 13, 2013 10:59 AM Pat, Looks ok if all easements are retained. If existing power line need to be relocated it will be at owner's expense. Theodis Thompson From: MCGETRICK MCGETRICK[mailto:mcgetrick2@sbcglobal.net] Sent: Monday, August 12, 2013 10:02 AM To: Jim Boyd Cc: THOMPSON, THEODIS; Joni Bates; daniel tull; an0142@att.com Subject: FINAL PLAT SIGN OFF KANIS BUSINESS PARK I would like your review of the final plat for Kanis Businee Park. I have shown the existing sewer and power that cross the site. The site is to be used as a parking lot. Please let me know if it is ok. Thanks, Pat http://us-mg205.mail.yahoo.com/neo/launch?.partner=sbc&.rand=40j 9o7vfdu32v 9/11 /2013 veoeeee©se Qc�zXNp Noon g� jai i8 X�d ��1; 8ad >»� gmg;'; �R �_ wq 0 Q 'D �^ m O 2n�ZpQ f=f u5i fn Ki � O Z A 0 QaQ�sQ� �y >e gp jV p"�•s�� 4P p� � 2XI ` 12p�9 I5 z 0 � �'s g • o o�Al�€i >Q N Z �A aFc� py p Z K $P$ moFEp�! �S$Np o S N e yni"3 a m Z m J m w V e yr N u m m �' y�_ N► D� n N n N 083829" E 292.43' N 01'38'35" I CuECI � R '�• CENM 69.30' J E 00' (PRIVATE) D "`NWT y4 � C J4 ly IW l�� O lm n O y •� _ m G r O 'a 5N• , l V o v m N � x m a f S 5 01'S3'18" W 277.90' l•J COLONEL GLENN CENTRE DR, (PRIVATE) O I r.i 50' KCE55 EASEIffNT h UT41TY EASEMENT N� loll I 1 evil &3 I `e 18i Ali 9= Print Page 1 of 1 Subject: RE: 4- final plats From: Daniel Tull (Daniel.Tull@carkw.com) To: mcgetdck2@sbcglobal.net; Date: Monday, July 8, 2013 5:02 PM Bentley Court PH IV - CAW approved with no comment Colonel Glenn Centre Lot 2 — CAW approved with no comment Christopher Addition Lot 1 — CAW approved with the following comment: Easement not required for water, main is private. Sims Addition — CAW approved with no comment. Thank You Central Arkansas Water Daniel Tull, Engineering Technician daniel.tull(i�carkw.com 501-377-1245 From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Friday, July 05, 2013 10:38 AM To: Jim Boyd Cc: tthompl@entergy.com; Joni Bates; Blake Weindorf; Daniel Tull; an0142@att.com Subject: 4- final plats I have attached 4 final plats for your sign -off. If you have any questions please contact us. Thanks, Pat http://us-mg205.mail.yahoo.com/neo/launch?.partner=sbc&.rand=4Oj 9o7vfdu32v 9/11 /2013 Print http: //us-mg2O5.mail.yahoo.com/neo/launch?.partner=sbc&.rand=c3ticuc.. Subject: [No Subject] From: NAJI, ALLISON V (an0142@att.com) To: mcgetrick2@sbcglobal.net; Date: Thursday, August 15, 2013 3:46 PM AT&T approves of this plat as of 8/15/13. If any facilities are found to be in conflict it will be a MOT and there will be charges associated with that. Thanks, Allison Naji AMM-Arkansas Mgr. OSP Planning & Engineering Design 1111 W. Capitol, Room 465 Little Rock, AR 72201 (501)373-1168 1 of 1 9/ 11 /2013 9:41 AA