Loading...
HomeMy WebLinkAboutS-1301-I ApplicationPage 1 of 1 I3vC3fi MAIL Classic FW: final plat lot 20 col, glenn centre From: "Jim Boyd" <jim.boyd@lrwu.com> To: "'James, Donna"' <DJames@littlerock.org> Cc: "'MCGETRICK MCGETRICK"' <mcgetrick2@sbcglobal.net> 1 File (5826KB) Tuesday, June 8, 2010 1:51 PM Sewer is available to this property and no further easements are required. LRW has no objection to the filing of this plat. James Boyd, P.E. Engineering Supervisor Little Rock Wastewater # 1 1 Clearwater Drive Little Rock, AR 72204 Office 501-688-1414 Mobile 501-352-0390 email jim.boyd@lrwu.com Irwu.com From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Monday, June 07, 2010 12:27 PM To: Jim Boyd Cc: tthomp1@entergy.com; joni bates; blake weindorf; ck0826@sbc.com Subject: final plat lot 20 col. glenn centre Please review final plat and return approval letter if it meets with your approval. Pat Page 1 of 1 N-AII00T. MAIL Classic RE: final plat lot 20 col. glenn centre Wednesday, June 9, 2010 11:05 AM From: "Bates, Joni B." <joni.bates@centerpointenergy.com> To: "MCGETRICK MCGETRICK" <mcgetrick2@sbcglobal.net> Approved From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Tuesday, June 08, 2010 9:23 AM To: Chris Keithley; Bates, Joni B. Subject: Fw: final plat lot 20 col. glenn centre --- On Mon, 6/7/10, MCGETRICK MCGETRICK <mcgetrick2@sbcglobal.net> wrote: From: MCGETRICK MCGETRICK <mcgetrick2@sbcglobal.net> Subject: final plat lot 20 col. glenn centre To: "Jim Boyd" <jim.boyd@lrwu.com> Cc: tthompl@entergy.com, "joni bates" <joni.bates@centerpointentergy.com>, "blake weindorf' <blake.weindorf@carkw.com>, ck0826@sbc.com Date: Monday, June 7, 2010, 12:26 PM Please review final plat and return approval letter if it meets with your approval Pat Page 1 of 1 YA1IoC)r,, MAIL Classic Re: final plat lot 20 col. glenn centre Monday, June 7, 2010 1:26 PM From: "Blake.Weindorf@CArkW.com" <Blake.Weindorf@CArkW.com> To: "MCGETRICK MCGETRICK" <mcgetrick2@sbcglobal.net> No Objections to the attached final plat. Please let me know if I may be of further assistance. Thanks, Blake F. Weindorf, P.E. Senior Engineer Central Arkansas Water 501.377.1224 501.210.4980 (fax) blake.weindorf@carkw.com From: MCGETRICK MCGETRICK <mcgetrick2@sbcglobal.net> To: Jim Boyd <jim.boyd@Irwu.com> Cc: tthomp1 @entergy.com, joni bates <joni.bates@centerpointentergy.com>, blake weindorf <blake.weindorf@carkw.com>, ck0826@sbc.com Date: 06/07/2010 12:36 PM Subject: final plat lot 20 col. glenn centre Please review final plat and return approval letter if it meets with your approval. Pat [attachment "finalplatlot20boen.dwg" deleted by Blake Weindorf/CAWj Before you print this email think about the environment. Page 1 of 1 MAIL Classic RE: col. glenn drainage Wednesday, June 9, 2010 9:11 AM From: "Charles, Nathan" <ncharles@littlerock.org> To: "MCGETRICK MCGETRICK" <mcgetrick2@sbcglobal.net> Thanks Pat, They want drainage way labeled on the plat as a "Private Easement not to be maintained by the City of Little Rock " From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Tuesday, June 08, 2010 1:29 PM To: Charles, Nathan Subject: col. glenn drainage Nate Here is the drawing you requested. I hope Pat C� E- 0 3r . Z v� Q U � �� ow Cal zF � Is m- {Y/,1.� �6 io Fit�Org PF 0 E- O ~ I —I a= n3g �N�ZS �i Ogg ��8 s j 3 m i J= 7.�mm Page 1 of 2 N-AH00T. MAIL Classic RE: final plat lot 20 col, glen addition From: "KEATHLEY, CHRIS (ATTSWBT)" <ck0826@att.com> To: "MCGETRICK MCGETRICK" <mcgetrick2@sbcgloba1.net> Pat, AT&T approves the final plat of lot 20 in the Colonel Glenn Addition. Thanx Chris Chris Keathley Manager O5P Ping & Eng bsgn 501.373.6594 0 501.615.5823 C From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Thursday, June 17, 2010 8:36 AM To: KEATHLEY, CHRIS (ATTSWBT) Subject: RE: final plat lot 20 col. glen addition Chris Here is an overall layout of the entire area Thanks Pat --- On Wed, 6/16/10, KEATHLEY, CHRIS (ATTSWBT) <ck0826@af .com> wrote: From: KEATHLEY, CHRIS (ATTSWBT) <ck0826@att.com> Subject: RE: final plat lot 20 col. glen addition To: "MCGETRICK MCGETRICK" <mcgetrick2@sbcglobal.net> Date: Wednesday, June 16, 2010, 2:33 PM Monday, June 21, 2010 10:59 AM I'm sorry Pat.....1 thought I had responded. I can't tell where this is. Can you send me an overall? CK Chris Keathley Manager O5P Ping & Eng bsgn 501.373.6594 0 501.615.5823 C From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Wednesday, June 16, 2010 8:39 AM To: KEATHLEY, CHRIS (ATTSWBT) Subject: final plat lot 20 col. gleen addition Chris I was checking to see if you could get me an approval note on the above final plat. I believe the plat was e-mailed a week ago. Let us know if you did not get it or if you any revisions. Pat CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME —Colonel Glenn Centre Lot 20 INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: �o f 7 /AQ ADDRESSING SPECIALIST'S REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. V-,�c. Addressing Specialist Date: 7 4/0 TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. -f Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. fir} a-- J Civil Engineer I/II Date: `f ' 7 & SURVEYOR'S REPORT I have reviewed the plat and find that: All re oirements for final plat approval have been satisfied. Surveyor Date: 6[6=2,r_} 7 MANAGER AP OVAL All Civil Engineering requirements For Fling this final plat have been satisfied. Vt-�ic..� Date: 011110 De ign Review Engineer/Civil Engineering Manager June 16, 2010