HomeMy WebLinkAboutS-1304 Map 5co
O
H
0
N
O
O
O
Woodrow & Barbra McLamore Jerry & Carylon Turley
Existing R-2 Existing R-2
300
Proposed PAGIS monument N 89030 ' O'9`�' ' ' W 1306.601
dedicated
access
CERTIFICATE OF PRELIMINARY SURVEYING ACCURACY easement
REPRESENTS A BOUNDARY SURVEY MADE OR VERIFIED BY ME THAT ALL SURVEYING RE-
ROBERT C. LOWS,
I, [ic,e<s.iU CERTIFY THAT THIS PLAT CORRECTLY
QUIREMENTS OF THE STATE OF ARKAN2AS AND THE CITY OF LITTLE ROCK SUBDIVISION
RULES AND REGULATIONS HAVE BEEN COMPLIED WITH AND A COPY OF SAID BOUNDARY
HAS BEEN DULY FILED FOR THE RECORD OFFICES OF THE STATE SURVEYOR AND THE
PULA.SKI COUNTY CIRCUIT CLERK ON _ , 19,
IN PLAT BOOK RXIE
11/9/00
DATE OF EXECUTION
6,P tf,Jv
NAME, REGISTERED LAND SURVEYOR
NO. ARKANSAS
CERTIFICATE OF PRELIMINARY ENGINEERING ACCURACY
I, PATRICK M. MCGE`I'MCERTIFY THAT THIS PLAT
CORRECTLY REPRESENTS A PLAT MADE BY ME, AND THAT ENGINEERING REQUIREMENTS
OF THE LITTLE ROCK SUBDIVISION RULES AND REY,ULATIONS HAVE BEEN CC14PLIED
WITH.
-1 1/911nn
DATE OF EXECUTION
SIGNED
NAME, REGISTERED ENGINEER
NO. ARYANSAS
cRTIFICATE OF PRELIMINARY PLAT APPROVAL
ALL REQUIREMENTS OF THE LITTLE ROCK SUBDIVISION RULES AND REGUALTIONS
RELATIVE TO THE PREPARATION AND SUBMITTAL OF A PRELIMINARY PLAT HAVING -
BEEN FULFILLED, APPROVAL OF THIS PLAT IS HEREBY GRANTED, S 8JEXCT TO
FURTHER PROVISIONS OF SAID RULES AND REGULAITONS. THIS CERTIFICATE
SHALL EXPIRE
DATE
DATE OF EXECUTION
GENERAL NOTES
1. ALL BUILDING LINES ARE AS SHOWN
NAME
LITTLE ROCK PLANNING COMMISSION
2. ALL DISTANCES ON CURVED BOUNDARIES ARE CHORD DISTANCES
3. ALL CORNER RADII ARE 25', UNLESS OTHERWISE MOPED.
4. ALL STREET R-O-W AND CUL-DE-9AC RADII ARE 50', UNLESS
OTHERWISE NOTED
5. ALL EASEMENTS SHORT ARE 10' IN WIDTU. UNLESS OTHERWISE NOTED
6. ALL EASEMENTS ON COMMON LOT LINES ARE 10' IN WIDTH, 5' EITHER
SIDE, UNLESS OTHERWISE NOTED
7. ALL EASEMENTS ARE TO BE USED FOR UTILITIES AND/OR DRAINAGE
PROPERTY DESCRIPTION
PART OF THE N 1/2 OF THE NE 1./4 OF FRACTIONAL SECTION 5, T-1-S, R-13-W, PULASKI
COUNTY, ARKANSA.S, BEING WEST OF STAGECOACH ROAD (ARKANSAS STATE HIGHWAY 5);
BEGINNING AT A POINT IN THE CENTER OF SAID HIGHWAY WHICH IS S 21"45' W 300.96'
FROM THE POINT OF INTERSECTION OF THE NORTH LINE OF THE NE 1/4 OF SECTION 5 WITH
THE CENTERLINE OF SAID HIGHWAY, THENCE N 89°30' W 1306.6' TO A POINT 346.5' EAST
OF THE WEST LINE OF THE NE 1/4 OF SECTION 5; THENCE S 01°20' E 348.0.; THENCE
S 89°25' E 1158.3' IT THE CENTER OF SAID HIGITWAY; THENCE N 01°56' E ALONG
CENTER OF SAID HIGHWAY 375.5' TO THE POINT OF BEGINNING. WITH THE EASTERLY 30.0'
SUBJECT TO A RIGHT OF WAY FOR STAGECOACH ROAD (ARKANSA.S' STATE HIGHWAY #5).
CONTAINING 9.87 ACRES, MORE OR LESS.
AR FIOODPLATN
LITTLE ROCK PLANNING COMMISSION
APPR V D, SUBJECT TO THE CONDITIONS
AS NOTED IN THE PLANNING
1 Q10
MINUTE R C TE
BY:
DATE:
S,-/?0�/
�A
iP
d!
W
r+i
r
V
it d
L.
d d
L
;07
d
n
DATE: 18 June 01
SHEET:
Of 1
8. CURRENT ZONING IS R-2.