Loading...
HomeMy WebLinkAboutS-1301-D Application/11 -EM CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: C o Lo NE, INSPECTOR REPORT EN 2 e Zo / /2 I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted as follows:: Engineering Specialist I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the pro er type and amount. Financial assurance or the co plete i provements listed above has been received. /7,11, / 7� V,13 � All other re uwrements for final plat approval have been satisfied. Civil Engineer I/II SURVEYOR'S REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. )., ; I - Surveyor f MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. 0-4Z6:-'� Design Review Engineer/Civil Engineering Manager October 2004 City of Little Rock Planning and Development Filing Fees Date: 041 , 20 a Annexation $ Board of Adjustment $ Cond. Use Permit/T.U.P. $ Final Plat $ L r\'� Planned Unit Dev. $ Preliminary Plat $ Special Use Permit $ Rezoning $ Site Plans $- Street Name Change $ Street Name Signs Number - - at ea. $— Public Hearing Signs Number at ea. $ Total $ 7DI - � File No. v l �— Location Applicant c= By -�-