HomeMy WebLinkAboutS-1301-D Application/11 -EM
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: C o Lo NE,
INSPECTOR REPORT
EN 2 e Zo / /2
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed
and in conformance with City requirements/standards.
Certain Improvements remain uncompleted as follows::
Engineering Specialist
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the pro er type and amount.
Financial assurance or the co plete i provements listed above has been received.
/7,11, / 7� V,13
�
All other re uwrements for final plat approval have been satisfied.
Civil Engineer I/II
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requirements for final plat approval have been satisfied.
)., ; I - Surveyor
f
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
0-4Z6:-'� Design Review Engineer/Civil Engineering
Manager
October 2004
City of Little Rock
Planning and Development
Filing Fees Date: 041 , 20 a
Annexation
$
Board of Adjustment
$
Cond. Use Permit/T.U.P.
$
Final Plat
$ L r\'�
Planned Unit Dev.
$
Preliminary Plat
$
Special Use Permit
$
Rezoning
$
Site Plans
$-
Street Name Change
$
Street Name Signs
Number - - at ea.
$—
Public Hearing Signs
Number at ea.
$
Total
$ 7DI - �
File No. v l �—
Location
Applicant c=
By -�-