HomeMy WebLinkAboutS-1300-A Staff AnalysisMarch 30, 2006
ITEM NO.: 4 FILE NO.: S-1300-A
NAME: Coburn Addition Preliminary Plat
LOCATION: Located South of the intersection of Sibley Hole Road and Meadow Lane
DEVELOPER:
Coburn Service Company, Inc.
9300 Mabelvale Pike
Little Rock, AR 72103
ENGINEER:
Marlar Engineering Company, Inc.
5318 JFL Boulevard
North Little Rock, AR 72116
AREA: 7.91 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT:
UMBER OF LOTS: 2
1-2, Light Industrial District
15 — Geyer Springs West
41.03
VARIANCES/WAIVERS REQUESTED:
FT. NEW STREET: 0 LF
1. A variance request from the Subdivision Ordinance (Section 31-313(a)) to allow a
reduced lot width for Tracts A and B.
2. A variance request from the Subdivision Ordinance (Section 31-313(b)) to allow
an increased lot depth to width ratio and to allow the creation of a pipe stem lot.
3. A variance request to allow a reduced front building line for Tract 1.
BACKGROUND:
The Commission at their January 25, 2001, Public Hearing reviewed the property at
10625 Sibley Hole Road for a subdivision site plan review. The site was zoned 1-2 and
being used as a heavy equipment/machinery sales and service. A business of this type
had been operated on the site and adjacent property (west) for a number of years.
Based on the fact that multiple buildings were proposed, the site plan required review
and approval by the Planning Commission.
March 30, 2006
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1300 A
The proposal included a two-phase development plan for the property. Phase I
included construction of a 7,000 square foot building just south of the existing one-story
brick office structure. A ground -mounted sign location and dumpster were also
indicated in Phase I. Phase II included the construction of two (2) 7,000 square foot
buildings within the southern portion of the property. The buildings were to be used to
perform certain service work (mechanical and cosmetic work) on heavy equipment. The
Phase I building has been constructed.
The majority of the property was gravel -covered and has been used for heavy
equipment and truck storage and maintenance for a number of years. The applicant
proposed to continue the use of the existing gravel area. The applicant also indicated
intentions of working with Public Works to improve access to the property from Sibley
Hole Road.
On January 29, 2004, the Commission denied a request to rezone the property from 1-2
to PD-I to allow the use of the site for outdoor sandblasting. The area designated for
sandblasting was located along the southeastern property line. The applicant was
utilizing the eastern portion of the site for the sandblasting and the site was under
enforcement for a zoning violation.
A. PROPOSAUREQUEST:
The applicant is now proposing the subdivision of the site to allow for the sale of
one acre and the existing building. The remaining property will be held for future
sale. A 40-foot building line has been indicated on Tract 1 and a building .line
located outside the pipe stem has been indicated for Tract 2.
There are variances being requested from the Subdivision Ordinance to allow the
split as proposed to occur. A variance request from the Subdivision Ordinance
(Section 31-313(a)) to allow a reduced lot width for Tracts 1 and 2 and a variance
request from the Subdivision Ordinance (Section 31-313(b)) to allow an
increased lot depth to width ratio and to allow the creation of a pipe stem lot. A
variance is also being requested to allow a reduced building line on Tract 1.
B. EXISTING CONDITIONS:
There are two single -story structures and an asphalt parking area within the north
portion of the property. The remainder of the property is being used as a
contractor's staging area and storage of fill material for a company doing work on
the 1-30 upgrades.
There is a mixture of industrial uses (including heavy equipment sales and
service) to the west and north along 1-30. There is undeveloped POD zoned
property to the south, with a church and single-family residence to the east and
southwest.
March 30, 2006
SUBDIVISION
ITEM NO.: 4(Cont.)FILE NO.: S-1300-A
C. NEIGHBORHOOD COMMENTS:
The Pinedale, Mavis Circle, and Southwest Little Rock United for Progress
Neighborhood Associations were notified of the Public Hearing along with all
abutting property owners. As of this writing staff has received several
informational phone calls from area resident.
D. ENGINEERING COMMENTS:
Public Works Conditions:
1. The floodplain cannot be used as a storage area for fill material.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Paint -Energy: No comment received.
SBC: Approved as submitted.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. A Capital Investment
Charge based on the size of the meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all meter connections including
any metered connections off the private fire system. This development will have
minor impact on the existing water distribution system. Proposed water facilities
will be sized to provide adequate pressure and fire protection. Contact Central
Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
3
March 30, 2006
SUBDIVISION
ITEM NO_: 4 Cont. FILE NO.: S-1300-A
F. ISSU ESITECH NICAUDESIGN:
Planninq Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (March 8, 2006)
Mr. David Jones of Marlar Engineering Company was present representing the
request. Staff presented an overview of the proposed development .indicating
there were few outstanding issues associated with the proposed request. Staff
requested the applicant verify the general notes section of the :proposed
preliminary plat. Staff also requested the applicant provide the zoning
classification of the proposed plat area and of abutting properties. Staff stated
the proposed subdivision would require variances from the Subdivision
Ordinance to allow the development as proposed. Staff also requested the
applicant provide a building line outside the pipe stem of proposed Tract 2.
Public Works comments were addressed. Staff stated the floodplain could not be
used as a storage area for fill material. Staff also stated any curb gutter and/or
sidewalk would require repair prior to occupancy.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plat drawing addressing most of the issues
raised at the March 8, 2006, Subdivision Committee meeting. The applicant has
indicated a building line outside the pipe stem of proposed Tract 2, corrected the
notes in the general notes section and indicated the zoning within the plat
boundary and of abutting properties.
There are variances being requested from the Subdivision Ordinance to allow the
split as proposed to occur. Variances are requested from Section 31-313(a) to
allow a reduced lot width for Tracts 1 and 2 and from Section 31-313(b) to allow
an increased lot depth to width ratio and to allow the creation of a pipe stem lot.
The site is zoned 1-2, Light Industrial District which typically requires a minimum
lot width of 100-feet and a lot area of 14,000 square feet. The lots are indicated
with a minimum width of 86.5 feet for Tract 1 and 60-feet for Tract 2. Tract 2 has
been indicated with a lot depth of 963-feet.
4
March 30, 2006
SUBDIVISION
ITEM NO.: 4 Cont. FILE NO.: S-1300-A
A 40-foot building line has been indicated on Tract 1 and a building line located
outside the pipe stem has been indicated for Tract 2. Tract 1 will require a
variance to allow a reduced building line. The ordinance typically requires the
placement of a 50-foot building line on properties zoned 1-2, Light Industrial
District.
Staff is supportive of the applicant's request and the requested variances. Staff
feels the applicant has done an adequate job in addressing concerns and has
proposed the subdivision of the property, which will limit the impact on the
adjoining properties and developments. To staffs knowledge there are no
outstanding issues associated with the proposed request.
STAFF RECOMMENDATION:
Staff recommends approval of the requested preliminary plat subject to
compliance with the comments and conditions as outlined in paragraphs D, E
and F of the above agenda staff report.
Staff recommends approval of the requested variance from the Subdivision
Ordinance (Section 31-313(a)) to allow a reduced lot width for Tracts A and B.
Staff recommends approval of the requested variance from the Subdivision
Ordinance (Section 31-313(b)) to allow an increased lot depth to width ratio and
to allow the creation of a pipe stem lot.
Staff recommends approval of the variance request to allow a reduced front
building line for Tract 1.
PLANNING COMMISSION ACTION: (MARCH 30, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval subject
to compliance with the comments and conditions as outlined in paragraphs D, E and F
of the agenda staff report. Staff also presented recommendations of approval of the
requested variances from the Subdivision Ordinance (Section 31-313(a)) to allow a
reduced lot width for Tracts A and B, from the Subdivision Ordinance (Section
31-313(b)) to allow an increased lot depth to width ratio and to allow the creation of a
pipe stem lot and the variance request to allow a reduced front building line for Tract 1.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 abstaining (Pam Adcock).
S-1300-A
NAME: Coburn Addition Preliminary Plat
LOCATION: located South of the intersection of Sibley Hole Road and Meadow Lane
Planning Staff Comments:
1. Provide notification of abutting property owners of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing. The
notice must be mailed no later than March 15, 2006. The Office of Planning and
Development must receive the proof of notice no later than March 24, 2006.
2. Provide the source of title of the landowner in the general notes section of the
proposed preliminary plat.
3. Provide the average size of the lots in the general notes section of the proposed
preliminary plat.
4. Provide the total number of lots in the general notes section of the proposed
preliminary plat.
5. Provide the means of wastewater disposal and the source of water supply in the
general notes section of the proposed preliminary plat.
6. A 50 foot front building line is typically required for 1-2 zoned property. Provide a
building line outside the pipe stem for proposed Tract 2.
7. Provide the zoning classification of the proposed plat area and of abutting
properties.
8. Verify the General Notes indicated on the proposed preliminary plat drawing.
9. The request includes a variance to allow a reduced lot width for each of the indicated
Tracts. The ordinance typically requires the placement of a 100-foot lot width
(Section 31-313(a)).
10.A variance request is being sought to allow an increased Lot Depth to Width Ratio
and a variance to allow the creation of a pipe stem lot (Section 31-313(b)) should be
indicated in the general notes section of the proposed preliminary plat.
Variance/Waivers:
1. A variance request from the Subdivision Ordinance (Section 31-313(a)) to allow a
reduced lot width for Tracts A and B.
2. A variance request from the Subdivision Ordinance (Section 31-313(b)) to allow
an increased lot depth to width ratio and to allow the creation of a pipe stem lot.
Public Works Conditions:
1. The floodplain cannot be used as a storage area for fill material.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
Item # 4
Utilities and Fire Department/County, Planning:
Wastewater: Sewer available, not adversely affected.
Entergy:
Center -Point Energy:
SBC:
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. The Little Rock Fire Department needs to
evaluate this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. A Capital Investment Charge based on the size of the meter
connection(s) will apply to this project in addition to normal charges. This fee will apply
to all meter connections including any metered connections off the private fire system.
This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire protection.
Contact Central Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Planning Division: No comment.
Landscape: No comment.
Revised plq_Vplan- Submit four (4) copies of a revised preliminary plat (to include the
additional information as noted above) to staff on Wednesday, March 15, 2006.
Item # 4
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision
DATE: February 22, 2006
ENTERGY (2)
ARKLA
Southwestern Bell Telephone (2)
Central Arkansas Water
Little Rock Wastewater
Pulaski County Planning
Little Rock Fire Department
Public Works: Engineering, Traffic (2)
NAME: Coburn Addition Preliminary Plat
TYPE OF ISSUE: 2 Lots zoned I-2
FILE NUMBER: S-1300-A
LOCATION: South of the intersection of Sibley Hole Road
and Meadow Lane
Parks and Recreation Department
Planning and Development — Site Plan Review
Planning and Development Graphics
CATA
TO WHO IT MAY CONCERN:
On March 30, 2006 the Little Rock Planning Commission will consider the above referenced issue.
NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on March 3, 2006.
NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on March 8, 2006.
A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or
recommendations will be appreciated.
Sincerely,
Donna mes
Subdivision Administrator
(Please respond below and return this letter with your comments for our records.)
Approved as Submitted. PLEASE RETURN COMMENTS BY March 6, 2006.
_Easement (s) required (See attached plat or description.)
*To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the
easement or the request will not be included in the Planning Commission agenda.
Comments:
:s
FILE NO_: S-1300-A
NAME: Coburn Addition Preliminary Plat
LOCATION: Located South of the intersection of Sibley Hole Road and Meadow Lane
DEVELOPER:
Coburn Service Company, Inc.
9300 Mabelvale Pike
Little Rock, AR 72103
ENGINEER
Marlar Engineering Company, Inc.
5318 JFL Boulevard
North Little Rock, AR 72116
AREA: 7.91 acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
CURRENT ZONING: 1-2, Light Industrial District
PLANNING DISTRICT: 15 — Geyer Springs West
CENSUS TRACT: 41.03
VARIANCESM/AIVERS REQUESTED:
1. A variance request from the Subdivision Ordinance (Section 31-313(a)) to allow a
reduced lot width for Tracts A and B.
2. A variance request from the Subdivision Ordinance (Section 31-313(b)) to allow
an increased lot depth to width ratio and to allow the creation of a pipe stem lot.
3. A variance request to allow a reduced front building line for Tract 1.
BACKGROUND:
The Commission at their January 25, 2001, Public Hearing reviewed the property at
10625 Sibley Hole Road for a subdivision site plan review. The site was zoned 1-2 and
being used as a heavy equipment/machinery sales and service. A business of this type
had been operated on the site and adjacent property (west) for a number of years.
Based on the fact that multiple buildings were proposed, the site plan required review
and approval by the Planning Commission.
FILE NO.: S-1300-A (Cont.
The proposal included a two-phase development plan for the property. Phase
included construction of a 7,000 square foot building just south of the existing one-story
brick office structure. A ground -mounted sign location and dumpster were also
indicated in Phase I. Phase II included the construction of two (2) 7,000 square foot
buildings within the southern portion of the property. The buildings were to be used to
perform certain service work (mechanical and cosmetic work) on heavy equipment. The
Phase I building has been constructed.
The majority of the property was gravel -covered and has been used for heavy
equipment and truck storage and maintenance for a number of years. The applicant
proposed to continue the use of the existing gravel area. The applicant also indicated
intentions of working with Public Works to improve access to the property from Sibley
Hole Road.
On January 29, 2004, the Commission denied a request to rezone the property from 1-2
to PD-I to allow the use of the site for outdoor sandblasting. The area designated for
sandblasting was located along the southeastern property line. The applicant was
utilizing the eastern portion of the site for the sandblasting and the site was under
enforcement for a zoning violation.
W
PROPOSAUREQUEST:
The applicant is now proposing the subdivision of the site to allow for the sale of
one acre and the existing building. The remaining property will be held for future
sale. A 40-foot building line has been indicated on Tract 1 and a building line
located outside the pipe stem has been indicated for Tract 2.
There are variances being requested from the Subdivision Ordinance to allow the
split as proposed to occur. A variance request from the Subdivision Ordinance
(Section 31-313(a)) to allow a reduced lot width for Tracts 1 and 2 and a variance
request from the Subdivision Ordinance (Section 31-313(b)) to allow an
increased lot depth to width ratio and to allow the creation of a pipe stem lot. A
variance is also being requested to allow a reduced building line on Tract 1.
EXISTING CONDITIONS:
There are two single -story structures and an asphalt parking area within the north
portion of the property. The remainder of the property is being used as a
contractor's staging area and storage of fill material for a company doing work on
the 1-30 upgrades.
There is a mixture of industrial uses (including heavy equipment sales and
service) to the west and north along 1-30. There is undeveloped POD zoned
property to the south, with a church and single-family residence to the east and
southwest.
6
FILE NO.: S-1300-A
C
C
F
NEIGHBORHOOD COMMENTS:
The Pinedale, Mavis Circle, and Southwest Little Rock United for Progress
Neighborhood Associations were notified of the Public Hearing along with all
abutting property owners. As of this writing staff has received several
informational phone calls from area resident.
ENGINEERING COMMENTS:
Public Works Conditions:
1. The floodplain cannot be used as a storage area for fill material.
2. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC:.Approved as submitted.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. The Little Rock Fire
Department needs to evaluate this site to determine whether additional public
and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are
required, they will be installed at the Developer's expense. A Capital Investment
Charge based on the size of the meter connection(s) will apply to this project in
addition to normal charges. This fee will apply to all meter connections including
any metered connections off the private fire system. This development will have
minor impact on the existing water distribution system. Proposed water facilities
will be sized to provide adequate pressure and fire protection. Contact Central
Arkansas Water at 377-1225 for additional information.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3700 for additional information.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
ISSUES/TECHNICAL/DESIGN:
Planning Dim: No comment.
3
FILE NO.: S-1300-A(Cont.)
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (March 8, 2006)
Mr. David Jones of Marlar Engineering Company was present representing the
request. Staff presented an overview of the proposed development indicating
there were few outstanding issues associated with the proposed request. Staff
requested the applicant verify the general notes section of the proposed
preliminary plat. Staff also requested the applicant provide the zoning
classification of the proposed plat area and of abutting properties. Staff stated
the proposed subdivision would require variances from the Subdivision
Ordinance to allow the development as proposed. Staff also requested the
applicant provide a building line outside the pipe stem of proposed Tract 2.
Public Works comments were addressed. Staff stated the floodplain could not be
used as a storage area for fill material. Staff also stated any curb gutter and/or
sidewalk would require repair prior to occupancy.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plat drawing addressing most of the issues
raised at the March 8, 2006, Subdivision Committee meeting. The applicant has
indicated a building -line outside the pipe stem of proposed Tract 2, corrected the
notes in the general notes section and indicated the zoning within the plat
boundary and of abutting properties.
There are variances being requested from the Subdivision Ordinance to allow the
split as proposed to occur. Variances are requested from Section 31-313(a) to
allow a reduced lot width for Tracts 1 and 2 and from Section 31-313(b) to allow
an increased lot depth to width ratio and to allow the creation of a pipe stem lot.
The site is zoned 1-2, Light Industrial District which typically requires a minimum
lot width of 100-feet and a lot area of 14,000 square feet. The lots are indicated
with a minimum width of 86.5 feet for Tract 1 and 60-feet for Tract 2. Tract 2 has
been indicated with a lot depth of 963-feet.
A 40-foot building line has been indicated on Tract 1 and a building line located
outside the pipe stem has been indicated for Tract 2. Tract 1 will require a
variance to allow a reduced building line. The ordinance typically requires the
placement of a 50-foot building line on properties zoned 1-2, Light Industrial
District.
Staff is supportive of the applicant's request and the requested variances. Staff
feels the applicant has done an adequate job in addressing concerns and has
0
FILE NO.. S-1300-A (Cont.)
proposed the subdivision of the property, which will limit the impact on the
adjoining properties and developments. To staffs knowledge there are no
outstanding issues associated with the proposed request.
STAFF RECOMMENDATION:
Staff recommends approval of the requested preliminary plat subject to
compliance with the comments and conditions as outlined in paragraphs D, E
and F of the above agenda staff report.
Staff recommends approval of the requested variance from the Subdivision
Ordinance (Section 31-313(a)) to allow a reduced lot width for Tracts A and B.
Staff recommends approval of the requested variance from the Subdivision
Ordinance (Section 31-313(b)) to allow an increased lot depth to width ratio and
to allow the creation of a pipe stem lot.
Staff recommends approval of the variance request to allow a reduced front
building line for Tract 1.
PLANNING COMMISSION ACTION: (MARCH 30, 2006)
The applicant was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval subject
to compliance with the comments and conditions as outlined in paragraphs D, E and F
of the agenda staff report. Staff also presented recommendations of approval of the
requested variances from the Subdivision Ordinance (Section 31-313(a)) to allow a
reduced lot width for Tracts A and B, from the Subdivision Ordinance (Section
31-313(b)) to allow an increased lot depth to width ratio and to allow the creation of a
pipe stem lot and the variance request to allow a reduced front building line for Tract 1.
There was no further discussion of the item. The chair entertained a motion for
placement of the item on the Consent Agenda for Approval. The motion carried by a
vote of 9 ayes, 0 noes, 1 absent and 1 abstaining (Pam Adcock).
:i