HomeMy WebLinkAboutS-1300 Staff AnalysisJanuary 25, 2001
ITEM NO.: 4
FILE NO.: 5-1300
NAME: Coburn Service Company, Inc. - Subdivision Site Plan Review
LOCATION: 10625 Sibley'Hole Road
DEVELOPER: ENGINEER:
Coburn Service Co., Inc. McGetrick and McGetrick
10601 I-30 319 East Markham St., Ste. 202
Little Rock, AR 72209 Little Rock, AR 72201
AREA: 6.42 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0
ZONING: I-2 ALLOWED USES: Industrial
PROPOSED USE: Industrial
VARIANCES/WAIVERS REQUESTED: None requested.
BACKGROUND:
The property at 10625 Sibley Hole Road is zoned I-2 and the
applicant is proposing an industrial development (heavy
equipment/machinery sales and service). A business of this type
has been operated on this site and adjacent property (west) for
a number of years. Based on the fact that multiple buildings
are proposed, the site plan must be reviewed and approved by the
Planning Commission.
A. PROPOSAL/REQUEST:
The applicant is proposing a two-phase development plan for
the property. Phase I includes construction of a 7,000
square foot building just south of the existing one-story
brick office structure. A ground -mounted sign location and
dumpster area have also been shown in Phase I. Phase II
includes construction of two (2) 7,000 square foot
buildings within the southern portion of the property. The
buildings will be used to perform certain service work
January 25, 2001
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: 5-1300
(mechanical and cosmetic work) on heavy equipment.
The majority of this property is gravel -covered and has
been used for heavy equipment and truck storage and
maintenance for a number of years. The applicant proposes
to continue the use of this existing gravel area. The
applicant plans to work with Public Works on an improved
access to the property from Sibley Hole Road.
Please see the attached site plan for existing and proposed
improvements to the property.
B. EXISTING CONDITIONS:
There is an existing one-story brick structure and an
asphalt parking area within the north portion of this
property. The remainder of the property is gravel -covered
and has been used for heavy equipment and truck storage in
the past.
There is a mixture of industrial uses (including heavy
equipment sales and service) to the west and north along
I-30. There is undeveloped 0-3 zoned property to the
south, with a church and single-family residences to the
east and southeast.
C. NEIGHBORHOOD COMMENTS:
The Pinedale, Mavis Circle and Southwest Little Rock United
for Progress Neighborhood Associations were notified of the
public hearing. As of this writing, staff has received no
comment from the neighborhood.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Sibley Hole Road is classified on the Master Street Plan
as a collector street. Dedicate right-of-way to 30 feet
from centerline.
2. Provide design of street conforming to "MSP" (Master
Street Plan). Construct one-half street improvement to
these streets including 5-foot sidewalks with planned
development.
3. Appropriate handicap ramps will be required per current
ADA standards.
4. All driveways shall be concrete aprons per City
Ordinance.
5. Plans of all work in right-of-way shall be submitted for
E
January 25, 2001
SUBDIVISION
ITEM NO.: 4 (Cont.)
FILE NO.: S-1300
approval prior to start of work.
6. A grading permit and development permit for special
flood hazard area is required prior to construction.
7. The minimum Finish Floor elevation of 291 feet is
required to be shown on plat and grading plans.
8. Stormwater detention ordinance applies to this property.
9. Easements for proposed stormwater detention facilities
_are required.
10. Easements shown for proposed storm drainage are
required.
11. Direction of flow for water courses leaving the
property.
12. Dedicate floodway easement to the City.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No Comment received.
ARKLA: No Comment received.
Southwestern Bell: No Comment received.
Water: No objection, an acreage charge of $150/acre applies
in addition to the normal connection charge for this parcel.
On -site fire protection, at the expense of the developer, may
be required.
Fire Department: Place fire hydrants per code. Contact
Dennis Free at 918-3752 for details.
County Planning: No Comment.
CATA: Site is not on a dedicated bus route and has no
effect on bus radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
No Comment.
3
January 25, 2001
SUBDIVISION
ITEM NO.: 4 (Cont.)
Landscape Issues:
FILE NO.: 5-1300
A six foot high opaque barrier, either a wooden fence with
its face directed outward or dense evergreen plantings, is
required along the eastern and southern perimeters and that
portion of the western perimeter abutting residential
property. In addition to the screening, trees and shrubs
are required within the land use buffers. The land use
buffer width required along the eastern and western
perimeters adjacent to residential property is 17 feet.
The southern land use buffer width required is 26 feet.
A landscaping upgrade of the existing vehicular use area
toward compliance with the Landscape Ordinance will be
required.
Landscape areas are required to be irrigated.
Prior to a building permit being issued, the Landscape Plan
must be stamped by a registered Landscape Architect.
Since this is an existing development some flexibility with
the landscaping requirements is allowed.
Building Codes:
The proposed and future buildings will require fire rated
walls with limited window openings along exterior walls
where they are in close proximity to the various property
lines. Details on the type and method of construction
would be worked out later, there was not enough detail to
make specific comments.
Contact Mark Whitaker at 371-4839 for details.
G. SUBDIVISION COMMITTEE COMMENT:
(JANUARY 4, 2001)
R. C. Coburn and James Luchsinger were present,
representing the application. Staff briefly described the
proposed site plan, noting that several additional items
(building height, sign location and dumpster location)
needed to be shown on the site plan.
The Public Works requirements were briefly discussed.
Mr. Coburn noted that the required right-of-way would be
N
January 25, 2001
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1300
dedicated and that some improvements for access would be
made along Sibley Hole Road. The Public Works
representatives noted that the new buildings would have to
meet a minimum finished floor elevation.
The landscape requirements were also discussed. Bob Brown,
of the Planning Staff, noted that an upgrade in landscaping
would be required. Mr. Coburn noted that evergreen
screening would be provided as required with each phase.
After the discussion, the Committee forwarded the site plan
to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff on
January 9, 2001. The revised plan addresses the issues as
raised by staff and the Subdivision Committee. The
additional notations required have been shown on the plan.
The applicant has noted that the maximum building height
will be 20 feet. The maximum building height allowed in
I-2 zoning is 45 feet. The applicant has also noted that
evergreen screening will be provided (with each phase)
along the property lines as required.
As noted earlier, a large portion of this property is
currently gravel -covered and has been used for a number of
years for heavy equipment and truck storage and
maintenance. Staff supports the continuing use of the
gravel area for the storage/maintenance of heavy equipment,
given the property's industrial zoning and the surrounding
industrial uses.
The applicant has noted that the required right-of-way for
Sibley Hole Road will be dedicated. The applicant plans to
work with the Public Works Department on an improved access
area along Sibley Hole Road.
Otherwise, there should be nc
with the proposed site plan.
conform to the City's Zoning
building setbacks and height,
impact on the general area.
outstanding issues associated
The proposed buildings
Ordinance with respect to
and should have no adverse
5
January 25, 2001
SUBDIVISION
ITEM NO.: 4 (Cont.)
I. STAFF RECOMMENDATIONS:
FILE NO.: 5-1300
Staff recommends approval of the site plan subject to the
following conditions:
1. Compliance with the requirements as noted in paragraphs
D, E and F of this report.
2. The proposed ground -mounted sign must conform to
ordinance standards for industrial zoning (maximum area -
72 square feet, maximum height - 30 feet).
3. Any site lighting must be low-level and directed away
from adjacent residential property.
4. The dumpster area must be screened on three (3) sides
with an eight (8) foot high opaque fence or wall.
PLANNING COMMISSION ACTION:
(JANUARY 25, 2001)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 10 ayes, 0 nays and 1 absent.
0