HomeMy WebLinkAboutS-1288 Staff AnalysisSeptember 14, 2000 ITEM NO.: 3 FILE NO.: S-1288 NAME: Baseline Commercial Park - Preliminary Plat LOCATION: South side of the 10,600 block of Baseline Road DEVELOPER_ F.Nr TNF:ER Irwin and Saviers/Ron Tabor White-Daters and Associates 1701 Centerview Dr., Ste. 201 401 S. Victory Street Little Rock, AR 72211 Little Rock, AR 72201 AREA: 19.9 acres NUMBER OF LOTS: 7 FT. NEW STREET: 650 if ZONING: R-2 PLANNING DISTRICT: 16 CENSUS TRACT: 41.03 VARIANCES/WAIVERS REQUESTED: 1. Deferral of street improvements (except left turn lane) to Baseline Road A. PROPOSAL: The applicant proposes to subdivide 19.9 acres along the south side of Baseline Road (east of Sibley Hole Road) into seven (7) lots for a future industrial park development. The applicant proposes a 650 foot cul-de-sac from Baseline Road to serve the development. The applicant has noted that the lots will be final platted one at a time as they are sold. The applicant is requesting a deferral of street improvements to Baseline Road for five (5) years, until development of Lots 1 and 4, or until adjacent development, whichever occurs first. The applicant has also noted that September 14, 2000 SUBDIVISION ITEM NO.: 3 (Cont.) FILE NO.: S-1288 the floodway along the eastern property line will be dedicated to the City. The applicant is also requesting a rezoning (R-2 to I-1) and a Land Use Plan Amendment for the property (Items 3.1 and 3.2 on this agenda). B. EXISTING CONDITIONS: The site is undeveloped and heavily wooded. There is an auto salvage yard and undeveloped property to the north across Baseline Road. There is also what appears to be a single family residence immediately west of the auto salvage yard, sitting several hundred feet north of Baseline Road. There are church developments east and west of the site, with a mixture of office and commercial zoned property to the south. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received no comment from the neighborhood. The SWLR United for Progress and Town and Country Neighborhood Associations were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. West Baseline Road is listed on the Master Street Plan as a principal arterial, dedication of right-of-way to 55 feet from centerline is required. 2. Driveways shall conform to Sec. 31-210 or Ordinance 18,031 Show driveway locations on the plat. 3. Provide design of streets conforming to "MSP" (Master Street Plan). Construct one-half street improvements to these streets including 5-foot sidewalks with planned development. 4. Plans of all work in right-of-way shall be submitted for approval prior to start of work. 5. Stormwater detention ordinance applies to this property. 6. Easements for proposed stormwater detention facilities are required. 7. Easements shown for proposed storm drainage are required. S. Prepare a letter of pending development addressing streetlights as required by Section 31-403 of the Little Rock Code. All requests should be forwarded to Traffic Engineering. 2 September 14, 2000 SUBDIVISION ITEM NO.: 3 (Cont.) FILE NO.: 5-1288 9. Baseline Road has a 1998 average daily traffic count of 5,600. 10. Dedicate regulatory floodway easement to the City of Little Rock. 11. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements to serve property. AP&L: No Comments received. ARKLA: No Comments received. Southwestern Bell: No Comments. Water: A water main extension will be required. Fire Department: Place fire hydrants per city code. Contact Dennis Free at 918-3752 for details. County Planning: No Comments received. CATA: Site is not on a dedicated bus route and has no effect on bus radius, turnout and route. F. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comment. Landscape Issues: No Comment. G. SUBDIVISION COMMITTEE COMMENT: (AUGUST 24, 2000) Joe White was present, representing the application. Staff briefly described the preliminary plat. Mr. White noted that he had no issues with the Planning Staff Comments. The Public Works requirements were discussed. Bob Turner, Director of Public Works, stated that driveway locations needed to be shown on the plat. 3 September 14, 2000 SUBDIVISION ITEM NO.: 3 (Cont.) FILE NO.: 5-1288 The requested deferral of street improvements to Baseline Road was briefly discussed. Mr. Turner noted that if the applicant constructed a left turn lane to the property, Public Works would support a deferral of the rest of the improvements. Mr. White asked if the section of Baseline Road adjacent to the floodway dedication would have to be improved by the developers. Mr. Turner stated that the developer would be responsible for the improvements, as the floodway area would be dedicated as an easement. After the discussion, the Committee forwarded the preliminary plat to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised preliminary plat to staff on August 30, 2000. The revised plat addresses the issues as raised by staff and the Subdivision Committee. The revised plat shows the driveway locations as required. Public Works supports the driveway locations as shown. The revised plat also shows the lot dimensions and 70 foot building lines as required. The applicant is requesting a deferral of street improvement to Baseline Road for five (5) years, until development of Lots 1 and 4, or until adjacent development, whichever occurs first. The applicant notes that the left turn lane in Baseline Road will be constructed as requested by Public Worker. Public Works supports the deferral as requested. Otherwise, to staff's knowledge, there are no outstanding issues associated with the preliminary plat. The plat should have no adverse effect on the general area. I. STAFF RECOMMENDATIONS: Staff recommends approval of the preliminary plat subject to the following conditions: 1. Compliance with the requirements as noted in paragraphs D and E of this report. 4 September 14, 2000 SUBDIVISION ITEM NO.: 3 (Cont.) FILE NO.: 5-1288 2. Staff supports the deferral of street improvements (except the left turn lane) to Baseline Road for five (5) years, until development of Lots 1 and 4, or until adjacent development, whichever occurs first. 3. The floodway along the east property line must be dedicated as an easement to the City. PLANNING COMMISSION ACTION: (SEPTEMBER 14, 2000) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairperson placed the item before the Commission for inclusion within the Consent Agenda for approval as recommended by staff. A motion to that effect was made. The motion passed by a vote of 11 ayes and 0 nays. 5