Loading...
HomeMy WebLinkAboutS-1277-D Staff AnalysisITEM NO.: 1. NAME: Riverside Properties Preliminary Plat LOCATION: located at 16100 Chenal Parkway S-1277-D ITEM NO.: 13. Z-6720-A NAME: Riverside Properties PCD Revocation and Rezoning to C-3, General Commercial District Planning Staff Comments: 1. Provide notification of the property owners located within 200-feet of the development including the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than March 23, 2016. The Office of Planning and Development must receive the proof of notice no later than April 1, 2016. 2. Establish building lines for Lots 1 C and 3 along the fronts of the lots. 3. The drive on the western perimeter currently is being used by the bank and the dentist office with drives accessing the driveway. The area should be labeled as an access easement. 4. The access easement along the western boundary does not appear to align with the proposed new access easement. Correct the easement locations or provide details of how the easements will connect and function. 5. The width of the access easement should be 60-feet in all locations to comply with the Subdivision and Master Street Plan ordinances. 6. The signs located on Lots 1 C and 3 will not require a variance. The lots will be allowed as per Section 36-557 (a). 7. Provide the source of title of the landowner and the owner's certification on the proposed plat. 8. Provide the names of owners of property abutting the proposed plat area. 9. Provide the zoning classification of the property abutting the proposed plat area. 10. Provide the limits of the floodplain and the floodway. 11. Provide the names of recorded subdivisions abutting the plat area. 12. Provide the names of owners of all abutting lands. 13. Provide the names of all owner of any landlocked parcels within or abutting the plat area. 14. Provide the proposed phasing plan. 15. Provide a draft bill of assurance for the proposed subdivision. 16. Provide information concern any existing covenants and the proposed covenants on the land. VarianceMaivers: Section 36-301 (d) to allow building height in excess of 35-feet Section 31-207 (b) to allow private commercial drive to serve Lots 1C and 3 i1 S-1277-D Section 31-231 to allow the creation of lots without public street frontage Public Works Conditions: 1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 2. The 60 foot access easement should extend along the east and north sides of Lot 3. 3. The proposed access easement does not follow the existing street. 4. Private access is proposed for these lots. In accordance with Section 31-207, private streets must be designed to the same standards as public streets. A minimum access easement width of 60-feet is required and street width of 31- feet from back of curb to back of curb. 5. Sidewalks with appropriate handicap ramps are required on both sides of the private street in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 6. Sidewalks with appropriate handicap ramps are required adjacent to Chenal Parkway in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 7. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 8. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 9. Show the proposed driveway locations. 10. Stormwater detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. Maintenance of the detention pond and all private drainage improvements is the responsibility of the developer and/or local property owners association. 11.If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 12.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering, 501.379.1813, Greg Simmons, gsimmons(a-),Iittlerock.org for more information. 13. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. Utilities and Fire Department/County Planning: Wastewater: Sewer available to this site. A sewer main extension may be required to serve the newly created lots. Contact Little Rock Wastewater Utility for additional information. ITEM NO.: 1. S-1277-D Entergy: The Distribution part of Entergy does not object to this proposal. Service is already provided to structures on Lots 1A and 1 B of the revised plat, but will eventually need to be extended to lots 1 C, 2A, 2B and 3. An overhead distribution line exists on the west side of Kirk Road and on the north side of this platted property. Contact Entergy in advance regarding future service requirements to the development and future facilities locations as this project proceeds. Also, please note that there is a transmission line extending across the northern edge of this property and there are very stringent requirements about what can be done around and under a transmission line. This proposal and drawings have been forwarded to our transmission group so they can take a look at it as well. Centerpoint Energy: No comment received. AT & T: No comment received. Central Arkansas Water: 1. Central Arkansas Water objects to the subdividing of Lots 1A and 1 B. Private fire services shall not cross property lines. 2. All Central Arkansas Water requirements in effect at the time of request for water service must be met. 3. A water main extension will be needed to provide water service to this property. 4. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. 5. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. 6. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. 7. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's materials and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of a Customer Owned Line Agreement is required. 8. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives area used, a reduced pressure zone back flow preventer shall be required. Fire Department: No comment. Parks and Recreation: No comment received. ITEM NO.: 1. S-1277-D County Planning: No comment. Rock Region Metro: Location is currently not served by METRO however it is part of our future West Little Rock express service. No objections to the plan as shown. Building Code: No comment. Planning Division:. No comment. Landscape: No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, March 23, 2016. May 19, 2016 U: ,i1►[0me] NAME: Riverside Properties Revised Preliminary Plat LOCATION: Located at 16100 Chenal Parkway DEVELOPER: Riverside Properties, LLC P.O. Box 3157 Little Rock, AR 72203 SURVEYOR: White-Daters and Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 9.74 acres FILE NO 1277-D NUMBER OF LOTS: 6 FT. NEW STREET: 0 LF CURRENT ZONING: C-3 & PD-C — Request as a separate item a revocation of the PD-C zoning and a Rezoning to C-3, General Commercial District WARD: 5 PLANNING DISTRICT: 19 - Chenal CENSUS TRACT: 42.18 VARIANCEM/AIVERS: 1. A variance from Section 36-301 (d) to allow building height in excess of 35-feet. 2. A variance from Section 31-207 (b) to allow a private commercial drive to serve Lots 1Cand 3. 3. A variance from Section 31-231 to allow the creation of lots without public street frontage. A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT: A preliminary plat was approved for a five (5) lot subdivision in April 2000. Lots 1, 4 and 5 were final platted between April 2000 and July 2001. The area proposed as Lots 2 and 3 was not final platted. The applicant is requesting a replat of Lot 1 and a revision to the preliminary plat for Lots 2 and 3. The applicant has indicated each of the areas will be platted into three (3) lots each. Lot 1 is proposed as Lots 1A, 1 B and 1 C. Lots 2 and 3 are proposed as Lots 2A and 2B and Lot 3. Lots 1 C and 3 are indicated as lots without public street frontage; a variance from Section 31-231, of the Little Rock Code of Ordinances. May 19, 2016 SUBDIVISION ITEM NO.: D (Cont. FILE NO.: S-1277-D A 60-foot cross access easement was previously platted from Chenal Parkway extending north 261-feet. This access easement will be extended north to connect with an east/west cross access easement which is proposed across the rear of proposed Lot 3. The easement will then connect to a previously platted cross access easement which allows a driveway connection to Kirk Road. All easements, cross access easements and cross parking agreements will be recorded with the final platting of the lots and the development of the lots to ensure proper placement of any and all easements. This request includes a variance from Section 31-207 (b) to allow private commercial drive to serve Lots 1 C and 3. The request includes a variance from the zoning ordinance to allow the maximum building height on Lots 1 C and 3 to exceed the 35-foot typical building height allowed within the C-3, General Commercial Zoning District. The building is proposed as a three (3) story building with parking under a portion of the structure. It is anticipated the building height will be near 55-feet. To allow the increased height requires a variance from Section 36-301 (d). As a separate item on this agenda the applicant is requesting a revocation of the existing PD-C zoning and the rezoning of the site to C-3, General Commercial District (Z-6720-A). The applicant is also seeking an amendment to the City's Future Land Use Plan for this site to remove a special conditions previously imposed on this site (LU19-16-01). The current Future Land Use Plan requires all rezoning requests to be filed as a Planned Zoning Development. B. EXISTING CONDITIONS: The site is the former Riverside Motors which has recently moved to the Colonel Glenn Road area. There are several buildings located on the site which were used for sales and service of the Riverside Motors vehicle brands. North of the site is an Entergy Transmission line which is located within a 100-foot easement. South of the Entergy easement there is a 50-foot Central Arkansas Water easement. East of the site is a wooded property owned by the Highland Valley United Methodist Church. The church campus is located to the east of the wooded property. West of the site is Kirk Road which has developed with a branch bank, a dentist office and a convenience store with gas pumps. South of the site, across Chenal Parkway, is the Kroger Shopping Center. There are a number of uses located in the center including restaurants, fitness center, retail shopping and a Kroger Super Store. Chenal Parkway is a divided roadway along the frontage of this proposed plat area. There is not a median break located along the frontage of this plat area. There is sidewalk in place along the lot frontages which were previously platted. May 19, 2016 UBDIVISION ITEM NO.: D (Cont.) C. NEIGHBORHOOD COMMENTS: FILE NO.: S-1277-D As of this writing, staff has received an informational phone call from an area property owner. All abutting property owners of the site along with the Parkway Place Property Owners Association were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS.- 1 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 2. The 60 foot access easement should extend along the east and north sides of Lot 3. 3. The proposed access easement does not follow the existing street. 4. Private access is proposed for these lots. In accordance with Section 31-207, private streets must be designed to the same standards as public streets. A minimum access easement width of 60-feet is required and street width of 31-feet from back of curb to back of curb. 5. Sidewalks with appropriate handicap ramps are required on both sides of the private street in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 6. Sidewalks with appropriate handicap ramps are required adjacent to Chenal Parkway in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. 7. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 8. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 9. Show the proposed driveway locations. 10. Stormwater detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. Maintenance of the detention pond and all private drainage improvements is the responsibility of the developer and/or local property owners association. 11. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the start of construction. 3 May 19, 2016 SUBDIVISION ITEM NO.: D (Cont. FILE NO.: S-1277-D 12. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering, 501.379.1813, Greg Simmons, .q_simmons(QJtt1erock.org for more information. 13. Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available to this site. A sewer main extension may be required to serve the newly created lots. Contact Little Rock Wastewater Utility for additional information. Entergy: The Distribution part of Entergy does not object to this proposal. Service is already provided to structures on Lots 1A and 1B of the revised plat, but will eventually need to be extended to lots 1 C, 2A, 2B and 3. An overhead distribution line exists on the west side of Kirk Road and on the north side of this platted property. Contact Entergy in advance regarding future service requirements to the development and future facilities locations as this project proceeds. Also, please note that there is a transmission line extending across the northern edge of this property and there are very stringent requirements about what can be done around and under a transmission line. This proposal and drawings have been forwarded to our transmission group so they can take a look at it as well. CenteMoint Energy: No comment received. AT & T: No comment received. Central Arkansas Water: 1. Central Arkansas Water objects to the subdividing of Lots 1A and 1 B. Private fire services shall not cross property lines. 2. All Central Arkansas Water requirements in effect at the time of request for water service must be met. 3. A water main extension will be needed to provide water service to this property. 4. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional 0 May 19, 2016 SUBDIVISION ITEM NO.: D (Cont.) FILE NO.: S-1277-D F XV review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and the Little Rock Fire Department is required. 5. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. 6. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. 7. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's materials and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of a Customer Owned Line Agreement is required. 8. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives area used, a reduced pressure zone back flow preventer shall be required. Fire Department: No comment. Parks and Recreation: No comment received. Counly Planning: No comment. Rock Region Metro: Location is currently not served by METRO however it is part of our future West Little Rock express service. No objections to the plan as shown. ISSUES/TECHNICAUDESIGN: Building Code Planning Division No comment. No comment. Landscape: No comment. SUBDIVISION COMMITTEE COMMENT: (March 16, 2016) Mr. Tim Daters, the applicant, was present representing the request. Staff presented an overview of the item stating there were three (3) items associated with the request. Staff stated the applicant was seeking a replat and a revision to a previously approved preliminary plat, a revocation of a PCD zoning and a k May 19, 2016 SUBDIVISION NO.: D (Cont.) FILE NO.: S-1277-D rezoning to C-3, General Commercial District zoning and an amendment to the City's Future Land Use Plan. Staff stated the current land use plan required applications for rezoning be approved as a planned zoning development. Staff stated the applicant was requesting to remove that requirement. Staff stated there were few outstanding technical issues associated with the request. Public Works comments were addressed. Staff stated a 60-foot access and utility easement through the site was required to connect Chenal Parkway to Kirk Road. Staff stated the plat indicated a 60-foot easement extending from Chenal into the site but at the common lot line of Lots 1 C and 3 the easement reduced to 30-feet. Mr. Daters stated the easement would be increased to 60-foot in all areas the easement was proposed. Staff requested the applicant provide the location of the proposed driveways. Staff also stated streetlights were required prior to the issuance of final plat approval. Staff noted the comments from the various other departments and agencies. Staff suggested the applicant contact the departments or agencies directly with any questions or concerns. There were no more issues for discussion. The Committee then forwarded the item to the full Commission for final action. H. ANALYSIS: The applicant provided a revised preliminary plat to staff addressing a number of the issues raised at the March 16, 2016, Subdivision Committee meeting. The revised plat has included the access easement as requested by staff. The revised plan has also indicated the placement of the driveways proposed to serve the new lots. The request is to revise a preliminary plat which was approved for a five (5) lot subdivision in April 2000. Of the approved preliminary plat Lots 1, 4 and 5 were final platted between April 2000 and July 2001. The area proposed as Lots 2 and 3 was not final platted and remains in a metes and bounds legal description. The applicant is requesting a replat of Lot 1 and a revision to the preliminary plat for Lots 2 and 3. The applicant has indicated each of the areas will be platted into three (3) lots. Lot 1 is proposed as Lots 1A, 1 B and 1 C. Lots 2 and 3 are proposed as Lots 2A, 2B and Lot 3. Lots 1 C and 3 are indicated as lots without public street frontage, which requires a variance from Section 31-231, of the Little Rock Code of Ordinances. Lots 1C and 3 will be served by the common drive between Lots 1 B and 2A. The common drive will be 31-feet wide, sidewalks constructed on each side and be centered in a 60-foot wide public access easement. The common drive will terminate at the south line of Lots 1 C and 3. Beyond the south line of these two (2) lots and across the site in general, as the properties develop additional 0 May 19, 2016 SUBDIVISION ITEM NO.: D (Cont.) FILE NO.: S-1277-D cross access easement and cross parking easements will be provided. The applicant has not addressed how access to Lot 1A will be achieved. Staff feels a proper access drive and easement should be provided to access this lot. Staff does not feel access to the lot should be through the parking lot of Lot 1 B and the applicant should provide an access easement designed per the typical standards of City code which includes eliminating the backing of cars into the access easement. The request includes a variance from the zoning ordinance to allow the maximum building height on Lots 1 C and 3 to exceed the 35-foot typical building height allowed within the C-3, General Commercial Zoning District (Section 36-301(d)). The building is proposed as a three (3) story building with parking under a portion of the structure. It is anticipated the building height will be near 55-feet. The applicant is seeking approval with the subdivision plat to allow the height variance. The applicant is also seeking the allowance of signage on Lots 1 C and 3 as per Section 36-557(a) to allow signs on the south side of the buildings of Lots 1 C and 3 without public street frontage. The ordinance states all on -premises wall signs must face required street frontage except in complexes where a sign without street frontage would be the only means of identification for a tenant. The signage as proposed is within the limits allowed per the zoning ordinance. As separate items on this agenda the applicant is requesting a revocation of the existing PD-C zoning and the rezoning of the site to C-3, General Commercial District (Z-6720-A) and an amendment to the City's Future Land Use Plan for this site to remove a special condition previously imposed on this site that all rezoning requests be filed as a Planned Zoning Development (LU19-16-01). Staff is supportive of the applicant's request. Staff feels the preliminary plat approval to allow the creation of the six (6) lots as proposed is appropriate for this site. The average lot size proposed is 1.6-acres with the minimum lot size being 0.90-acres. To staff's knowledge there are no remaining outstanding technical issues associated with the request. STAFF RECOMMENDATION: Staff recommends approval of the requests subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff recommends approval of the variance request from Section 36-301(d) to allow building height in excess of 35-feet. N May 19, 2016 SUBDIVISION ITEM NO.: D (Cont. FILE NO.: S-1277-D Staff recommends approval of the variance request from Section 31-207(b) to allow a private commercial drive to serve Lots 1 C and 3. Staff recommends approval of the variance request from Section 31-231 to allow the creation of lots without public street frontage. Staff recommends the applicant provide proper access for Lot 1A designed per the typical standards of City code. PLANNING COMMISSION ACTION: (APRIL 7, 2016) The applicant was present. There was one registered objector present. Staff presented the item with a recommendation of deferral. Staff stated the applicant had requested a deferral on April 6, 2016, which would require a waiver of the Commission's By-laws with regard to the late deferral request. A motion as made to approve the By-law waiver with regard to the late deferral request. The motion carried by a vote of 8 ayes, 0 noes and 3 absent. The item was placed on the consent agenda and approved as recommended by staff by a vote of 8 ayes, 0 noes and 3 absent. rfIF-Al aIIIIIJ1»•I_11921 The applicant submitted a revised site plan to staff indicating access to Lot 1A is via a right in right out driveway onto Chenal Parkway. The request for the driveway will require a variance from Sections 30-43 and 31-210 to allow the drive as proposed. Staff is supportive of the variance request. To staff's knowledge there are no remaining outstanding technical issues associated with the request. Staff feels the applicant has done an adequate job in addressing their concerns. Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff recommends approval of the variance request from Section 36-301(d) to allow building height in excess of 35-feet. Staff recommends approval of the variance request from Section 31-207(b) to allow a private commercial drive to serve Lots 1 C and 3. Staff recommends approval of the variance request from Section 31-231 to allow the creation of lots without public street frontage. 0 May 19, 2016 SUBDIVISION ITEM NO.: D (Cont. FILE NO.: S-1277-D PLANNING COMMISSION ACTION: (MAY 19, 2016) The applicant was present. There was one registered objector present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff presented a recommendation of approval of the variance request from Section 36-301(d) to allow building heights in excess of 35-feet. Staff presented a recommendation of approval of the variance request from Section 31-207(b) to allow a private commercial drive to serve Lots 1 C and 3. Staff presented a recommendation of approval of the variance request from Section 31-231 to allow the creation of lots without public street frontage. Mr. Tim Daters of White Daters and Associates addressed the Commission. He stated the request was for preliminary plat approval of a site containing 9.7-acres and allowing the creation of six (6) lots. He stated the site was formerly used as automobile sales. He stated the owners had marketed the site with the current building but had been unsuccessful in selling the site with the current buildings and lot configuration. He stated the site was being redeveloped with potentially a multi -story office building. He stated the height of the office building was generating the need for a building height variance. Dr. Lee Wyant addressed the Commission in opposition of rezoning the site. He stated his office was located just to the west of proposed Lot 2B. He stated he did not desire a fast food restaurant adjacent to his office. Staff stated the current request was for preliminary plat approval. Staff stated the property was zoned C-3, General Commercial District which would allow a fast food restaurant. Staff stated the item on the Commission's April meeting was for revocation of a PD-C zoning but it did not include the area adjacent to his office. Staff stated the area adjacent to his office had been zoned C-3, General Commercial District for a number of years. Mr. Wyant questioned if conditions could be placed on the request. Staff stated the request was not for approval of zoning. Staff stated there could not be conditions placed on the plat with regard to use. There was no further discussion. The chair entertained a motion for approval of the item. The item was approved as recommended by staff by a vote of 10 ayes, 0 noes, 0 absent and 1 recusal (Commissioner Alan Bubbus). 9