HomeMy WebLinkAboutS-1263 Staff AnalysisSeptember 30, 1999
ITEM NO.: 4
FILE NO.: 5-1263
NAME: Charnley Conway Addition - Preliminary Plat
LOCATION: West side of Green Mountain Drive, at Ethan Allen
JJrive
DEVELOPER: ENGINEER:
Charnley Conway White-Daters and Associates
8 Lorian Drive 401 S. Victory Street
Little Rock, AR 72212 Little Rock, AR 72201
AREA: 0.50 acre NUMBER OF LOTS: 10 FT. NEW STREET: 0
ZONING: PD-R
PLANNING DISTRICT: 2
CENSUS TRACT: 22.05
VARIANCES/WAIVERS REQUESTED: None requested.
A. PROPOSAL:
On December 5, 1995, the Board of Directors passed
Ordinance No. 17,044 which rezoned this property to PD-R.
The approved site plan included 10 single-family
residential units in four (4) buildings. A single access
point from Green Mountain Drive with a shared drive and
parking area were also part of the approved plan.
Firewalls were constructed between the adjoining units and
separate water meters were provided with the idea that
subdividing would at some point be desirable.
The applicant is now proposing to subdivide the property
into ten (10) lots to allow the sale of the individual
units. There will continue to be a single access point
September 30, 1999
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1263
from Green Mountain Drive, with an access and utility
easement across the front of the property to serve all of
the proposed lots. There will also be a no vehicle access
easement along the balance of the property frontage to
prohibit any future curb cuts. The applicant will final
plat all of the lots at the same time.
B. EXISTING CONDITIONS:
There is currently a 10-unit multifamily development on
this property (zoned PD-R). This development consists of
four (4) buildings; two (2) three -unit buildings and two
(2) two -unit buildings.
There are single-family residences to the north, west and
northeast. Existing multifamily developments are located
to the south and southeast.
C. NEIGHBORHOOD COMMENTS:
The Walnut Valley and Beverly Hills Neighborhood
Associations were notified of the public hearing. As of
this writing, staff has received no comment from the
neighborhood.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Property frontage needs to have the sidewalks and ramps
brought up to the current ADA standards.
2. Repair or replace any curb and gutter or sidewalk that
is damaged in the public right-of-way prior to
occupancy.
3. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
4. Stormwater detention ordinance applies to this property.
5. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
6. Existing topographic information at maximum five foot
contour interval base flood elevation is required.
7. A Sketch Grading and Drainage Plan per Sec. 29-186(e) is
required.
2
September 30, 1999
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: S-1263
8. All lots must have internal access from Green Mountain
Drive. Restrict access by platting " no access
easement."
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements
to serve property.
AP&L: No Comment received.
Arkla: No Comment.
Southwestern Bell: No Comment received.
Water: No Comment.
Fire Department: Place fire hydrants to code.
County Plannin : No Comment received.
CATA: No Comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division:
No Comment.
Landscape Issues:
No Comment.
G. ANALYSIS:
The applicant submitted a revised preliminary plat to staff
on September 14, 1999. Most of the issues as raised by
staff and the Subdivision Committee have been addressed.
The revised plat shows the driveway location and "no
vehicular access" easement as requested. The front
building line also been removed from the plat.
A revised plat needs to be submitted to staff with the
following notations:
1. Access and utility easement along the front of the
property should include "parking" and be explained in
the Bill of Assurance.
2. Maintenance easements should be provided between the
existing buildings and explained in the Bill of
Assurance.
3
September 30, 1999
SUBDIVISION
ITEM NO.: 4 (Cont.) FILE NO.: 5-1263
3. Sources of title for abutting recorded subdivisions
should be noted.
4. A preliminary Bill of Assurance should also be
submitted.
The only remaining issue relates to the required sidewalk
construction along Green Mountain Drive. The applicant
notes in a letter submitted with the revised plat that the
existing sidewalk along Green Mountain Drive stops short of
this development. The applicant notes that the sidewalk
could be constructed on the east side of Green Mountain
Drive or an in -lieu contribution could be provided for
future construction. Staff will attempt to have this issue
resolved prior to the public hearing.
Otherwise, to staff's knowledge there are no outstanding
issues associated with the preliminary plat. This
preliminary plat in conjunction with the previously
approved PD-R for this property should have no adverse
effects on the surrounding property.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat subject
to the following conditions:
1. Compliance with the requirements as noted in paragraphs
D and E of this report.
2. A revised plat must be submitted to staff with the
additional notations as outlined in paragraphs G. of
this report.
3. The issue relating to sidewalk construction needs to be
resolved.
SUBDIVISION COMMITTEE COMMENT:
(SEPTEMBER 9, 1999)
Joe White was present, representing the application. Staff gave
a brief description of the proposed plat. Staff noted that the
existing driveway location should be shown on the plat and a "no
vehicle access" easement should be platted along the remaining
property frontage. Staff also noted that the "vehicle and
access" easement along the front portion of the property should
include "parking". Staff also noted that maintenance easements
should be platted between the existing buildings and explained
in the Bill of Assurance.
4
September 30, 1999
SUBDIVISION
ITEM NO.: 4 (Cont.
FILE NO.: S-1263
The Public Works requirements were briefly discussed. It was
thought that a sidewalk existed along the east side of Green
Mountain Drive, and if so, no sidewalk would be required on the
west side. The sidewalk requirement was briefly discussed.
There being no further issues for discussion, the plat was
forwarded to the full Commission for final action.
PLANNING COMMISSION ACTION:
(SEPTEMBER 30, 1999)
The staff presented a positive recommendation on this
application, as there were no further issues for resolution.
There were no objectors to this matter.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for approval as recommended by staff.
A motion to that effect was made. The motion passed by a vote
of 11 ayes and 0 nays.
5