Loading...
HomeMy WebLinkAboutS-1240-J Map 2j 005 fence along line �o \ ` \ \ EXIS R � \ \ \ \ 00 L '\ DEALER IP \NGo o \ \ G \ f } 9 i \ `- G PA NG L �� \ \ \ LOT 23 \ \ FUTURE \ USED CA .0 ` \ ACILITY \ Rio -o !o \ rpy / • oil 104 i /\ \96jpZa�pp�K Nw-41-1 Y / 9 0 9 i li I I z I!� REMAINDER OF PROPERTY NOT DEVELOPED NO WORK 0 I� I — — — — — - — — — PROPERTY LINE SITE 1 " = 70'-0" PLAN NO, S RFCFTVFD [J AUG to 3 2005 BY. NEW PARKING LOT DESIGN 1. THE TWO EXISTING CAR DEALERSHIP PARKING LOTS (LOTS 22,23) AND THE ONE PARTIALLY DEVELOPED PARKING LOT ON THE NEWLY DEVELOPED LOT (LOT 24) ARE TO BE MADE ONE LOT BY A REPLAT SUBMITTED ON BEHALF OF THE OWNER BY THOMAS ENGINEERING. A. NEW PARKING LOT AREA: 40,896 SQUARE FEET PARKING LOT INTERIOR LANDSCAPE AREA: 8%OF DEVELOPMENT REQUIRED 3,272 SQUARE FEET REQUIRED 3,558 SQUARE FEET PROVIDED B. PERIMETER PLANTING: 1 TREE FOR EVERY 750 S.F. LANDSCAPE OR BUFFER AREA AND 3 SHRUBS FOR EVERY 30 L.F. AT PERIMETER 3,272 S.F. LANDSCAPE AREA REQUIRED, 126'LF. PERIMETER 5 TREES REQUIRED,13 SHRUBS REQUIRED 5 TREES AT PERIMETER PROVIDED,13 SHRUBS PROVIDED C. TREE PLANTING: 1 TREE FOR EVERY 12 PARKING SPACES 135 PARKING SPACES 12 TREES REQUIRED 12 TREES AT INTERIOR LANDSCAPE AREAS PROVIDED 2. NEW LANDSCAPE PLANTINGS SHALL BE IRRIGATED USING THE EXISTING IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE EXTENSIONS FROM EXISTING SYSTEM AND DESIGN FOR NEW LANDSCAPE AREAS. 3. FINAL LANDSCAPE DESIGN AND PLANTING SELECTIONS SHALL BE SUBMITTED BY LANDSCAPE ARCHITECT. s BUILDING AND/OR SITE SIGNAGE IS UNKNOWN AT THIS TIME. THE DEVELOPER WILL INCLUDE ANY SIGNAGE TO BE PERMITTED IN THE FUTURE SITE AND BUILDING PERMITTING PROCESS. 5FUTURE SITE LIGHTING WILL COMPLYWITH ALL CITY REQUIREMENTS AND SHALL BE SUBMITTED FOR REVIEW AT FUTURE PERMITTING. 6. THE TYPICAL PARKING STALL DIMENSION SHALL BE 9'-0• X 18'-0° 7. FUTURE BUILDING PLANS AND PERMITTING SHALL ADDRESS THE STORM WATER DETENTION REQUIREMENTS OF THE CITY. 4500 Burrow Drive North Little Rock, AR 72116 Phone- 501-758-7443 Fax 501-753-7309 www.taggarch.com NORTH POINT NISSAN NEW PRE OWNED BUILDING EXISTING FACILITY RENOVATION PROJECT NAME SEAL REVISIONS REVISION NUMBER _ REVISION NUMBER REVISION NUMBER REVISION NUMBER REVISION NUMBER 3 AUO W 20M DATE PROJECT NUMBER 34W4 DRAWING NUMBER