HomeMy WebLinkAboutS-1200 Staff AnalysisJuly 23, 1998
ITEM NO.• D FILE NO. S-1200
NAME: Davis Office Park - Preliminary Plat
LOCATION: End of Talley Road; south of Colonel Glenn Road and
immediately east of Interstate 430
DEVELOPER•
ENGINEER•
Max Davis• McGetrick Engineering
319 East Markham St. 319 East Markham Street
Little Rock, AR 72201 Little Rock, AR 72201
AREA: 12.96 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 480
ZONING: R-2
PLANNING DISTRICT: 12
CENSUS TRACT: 24.05
VARIANCES WAIVERS REQUESTED: None requested.
A. PROPOSAL:
The applicant proposes to plat the 12.96 acres into a single
lot. The property will be accessed from Talley Road, with
the property owner constructing half -street improvements to
Talley Road with a cul-de-sac at the end.
The applicant is also proposing to rezone the property to
POD for development of an office park (Item #13 on this
agenda).
B. EXISTING CONDITIONS:
The property is currently vacant and heavily wooded. The
highest point of the property is near the center of the
tract, falling over 100 feet to the north and approximately
90 feet to the south.
There are two single-family residences located to the south,
across Talley Road, with vacant R-2 zoned property to the
east. Interstate 430 is located immediately to the west.
July 23, 1998
SUBDIVISION
ITEM NO.: D (Cont.) FILE NO • S-1200
C. NEIGHBORHOOD COMMENTS:
Staff has received no neighborhood comment as of this
writing. The John Barrow, Westwood and Pecan Lake
Neighborhood Associations were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Talley Road is 20 feet wide, dedication of right-of-way
to 30 feet from centerline for this commercial street
will be required.
2. Provide design of streets conforming to "MSP" (Master
Street Plan). Construct one-half street improvements to
these streets including 5 foot sidewalks with planned
development. Improve Talley Road from Colonel Glenn
Road to 27 feet wide for commercial access to property.
3. Plans of all work in right-of-way shall be submitted for
approval prior to start of work.
4. Stormwater detention Ordinance applies to this property.
5. Easements for proposed stormwater detention facilities
are required.
6. A sketch grading and drainage plan, a special flood
hazard permit, and a special grading permit for flood
hazard areas are required. Arkansas Department of
Pollution Control and Ecology (ADPCE) and NPDES permit
are also required.
7. Cul-de-sac length exceeds 300 feet limitation a waiver
of commercial cul-de-sac length is required.
8. On site striping and signage plans should be forwarded
to Public Works, Traffic Engineering for approval with
the site development package.
9. Obtain permits (barricade/street cut) for improvements
within proposed or existing right-of-way from Traffic
Engineering prior to construction in right-of-way.
10. Prepare a letter of pending development addressing
street lights as required by Section 31-403 of the
Little Rock Code. All requests should be forwarded to
Traffic Engineering.
11. Obtain permits for improvements within State Highway
right-of-way from AHTD, District VI.
12. Utility excavation within proposed rights -of -way shall
be per Article V of Sec. 30.
E. UTILITIES AND FIRE DEPARTMENT COUNTY PLANNING:
Wastewater: Sewer main located on -property. Show
easements if applicable.
K
July 23, 1998
SUBDIVISION
ITEM NO.: D (Cont.) FILE NO.: S-1200
AP&L: Easement requested along both sides of Talley Road
and the 50 foot access easement. Contact utility for
details.
ARKLA: No Comment.
Southwestern Bell: A 10 foot easement is requested along
the east and west property lines and across the north end
of the property.
Water: Water main extension and on -site fire protection
will be required.
Fire Department: No Comment.
County Planning: No Comment received.
CATA: CATA does not currently serve the area. See no
implications for future service.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No Comment.
Landscape Issues: No Comment.
G. ANALYSIS•
The applicant submitted a revised preliminary plat to staff
on May 28, 1998. The plat needs to show the following
additional details:
1. Name and address of property owner/subdivider and source
of title
2. Stormwater.drainage analysis
3. Names of abutting property owners
4. Zoning within plat boundary
A preliminary bill of assurance must also be submitted.
Otherwise there are no outstanding issues related to the
preliminary plat.
H. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat subject to
the following conditions:
3
July 23, 1998
SUBDIVISION
ITEM NO.: D (Cont.) 'FILE NO.: S-1200
1. Compliance with the requirements noted in paragraphs D
and E of this report.
2. The applicant must submit 4 copies of a revised
preliminary plat showing the additional details noted in
paragraph G of this report.
3. A preliminary bill of assurance must be submitted to
staff.
However, if item #13 (POD application for the property) is
deferred, this item should also be deferred.
SUBDIVISION COMMITTEE COMMENT: (MAY 21, 1998)
Pat McGetrick was present, representing the application. Staff
gave a brief description of the proposed plat.
Staff noted several minor details which need to be shown on the
plat.
The Public works requirements were reviewed with the Committee.
Bob Turner, of .Public Works, noted that Talley Road from Colonel
Glenn Road to this site would need to be improved to provide
commercial access to the property.
After further discussion relating to right-of-way issues, the
Committee forwarded the plat to the full Commission for final
action.
PLANNING COMMISSION ACTION: (JUKE 11, 1998)
Staff informed the Commission that the applicant had submitted a
letter requesting that the item be deferred to the July 23, 1998
agenda. Staff noted that the letter was received less than five
(5) business days prior to the public hearing, and therefore, a
waiver of the bylaws was in order. Staff supported the deferral
request.
The Chairman placed the item before the Commission for inclusion
within the Consent Agenda for deferral to the July 23, 1998
agenda. A motion was made to waive the bylaws and accept the
deferral request as made by the applicant. The motion passed by
a vote of 9 ayes, 0 nays and 2 absent. A motion was made to
approve the Consent Agenda. The motion passed by a vote of
9 ayes, 0 nays and 2 absent.
4
July 23, 1998
SUBDIVISION
ITEM NO.: D (Cont.) _ FILE NO.: S-1200
PLANNING COMMISSION ACTION: (JULY 23, 1998)
Pat McGetrick was present, representing the application. There
were no objectors present. Staff gave a brief description of the
preliminary plat with a recommendation of approval subject to the
conditions as noted in paragraph H of the staff report. Staff
stated that there were no outstanding issues.
A motion was made to approve the preliminary plat as recommended
by staff. The motion was approved by a vote of 11 ayes and
0 nays.
5