Loading...
HomeMy WebLinkAboutS-1184 Staff AnalysisApril 30, 1998 22 FILE NO.: S-1184 NAME: Turtle Creek Apartments - Revised Subdivision Site Plan Review LOCATION: 601 Napa Valley Road DEVELOPER: ENGINEER: Turtle Creek Apts. None John Swanner 601 Napa Valley Rd. Little Rock, AR AREA: Approx. 18 Acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 ZONING: MF-18 and OS ALLOWED USES: Multifamily PROPOSED USE: Multifamily VARIANCESIWAIVERS REQUESTED: None BACKGROUND: On October 18, 1983, the Board of Directors approved Ordinance #14,530 which rezoned the property from R-2 to MF-18 and OS. The rezoning included approval of a site plan for Turtle Creek Apartments. A. PROPOSAWREQUEST: The applicant is proposing to revise the original site plan by adding 15 carport structures to the site. The structures will cover 144 parking spaces. Each carport structure will be approximately 9 feet in height. The carport structures will be of metal construction and will be painted (including the roofs) to match the existing buildings. B. EXISTING CONDITIONS: The site contains the existing Turtle Creek Apartment buildings with the associated drives and parking areas. The Agape Church is located to the north with other multifamily April 30, 1998 SUBDIVISION ITEM NO.: 22 (Cont.) FILE NO.: S-1184 developments to the south and west across Napa Valley. Single-family residences are located to the east. C. NEIGHBORHOOD COMMENTS: Staff has received no neighborhood comments as of this writing. The St. Charles Neighborhood Association was notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Napa Valley is listed on the Master Street Plan as a minor arterial. A dedication of right-of-way to 45 feet from centerline is required. 2. Provide design of Napa Valley Road conforming to "MSP" (Master Street Plan). Construct one-half street improvements to Napa Valley Road including 5 foot sidewalks with planned development or provide in -lieu contribution. 3. All driveways shall be concrete aprons per City Ordinance. 4. Napa Valley Road has a 1996 average daily traffic count of 11,000. 5. Obtain permits (barricade/street cut) for improvements within proposed or existing right-of-way from Traffic Engineering prior to construction in right-of-way. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Carport Structures construction will not be allowed within any existing sewer main easement. AP&L: No Comment received. Arkla: No Comment received. Southwestern Bell: No Comment received. Water: Many of the proposed structures are shown over existing public water facilities. Construction of structures within waterline easement is prohibited. Fire Department: All access drives must be at least 20 feet wide. Contact Dennis Free at 918-3752'for details. County Planning: No Comment. CATA: The site is not on a Central Arkansas Transit bus route. F. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comment. Landscape Issues: No Comment. 2 April 30, 1998 SUBDIVISION ITEM NO.: 22 (Cont.) FILE NO.: 5-1184 G. ANALYSIS: The original site plan submitted by the applicant had 31 carport structures, many of which were shown over an existing water main and utility easement. The applicant removed 16 structures from the site plan which were shown over easements. The applicant will be working with the various utility companies, seeking approval of the additional 16 carport structures. If approval is gained from the utilities, the applicant will be back for another revised site plan for the remaining structures. As stated above, the applicant submitted a revised site plan (removing the structures shown over easements) which conforms to the comments raised by the Subdivision Committee. The applicant has stated that a 15 percent in - lieu contribution will be made for the street improvements to Napa Valley Road. There are no other outstanding issues to be resolved. H. STAFF RECOMMENDATIONS: Staff recommends approval of the site plan subject to the following conditions: 1. Compliance with the comments in paragraphs D and E of this report 2. The carport structures (including roofs) will be painted to match the existing structures on the site. SUBDIVISION COMMITTEE COMMENT: John Swanner was present, representing the application. Staff gave a brief description of the site plan. The utility easement and water main issue was briefly discussed. Mr. Swanner stated that the site plan would be revised to remove the structures shown over the water main and utility easement. The Public Works comments were reviewed. Additional right-of-way dedication and required street improvements to Napa Valley Road were discussed. Mr. Swanner stated that a 15 percent in -lieu contribution would probably be made for the improvements, but he had to talk to the owners first. After additional discussion, the Committee forwarded the issue to the full Commission for final action. 3 April 30, 1998 SUBDIVISION ITEM NO.: 22 (Cont.) FILE NO.: S-1184 PLANNING COMMISSION ACTION: (APRIL 30, 1998) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairman placed the item before the Commission for inclusion within the Consent Agenda for approval as recommended by staff. A motion to that effect was made. The motion passed by a vote of 11 ayes and 0 nays. 4