Loading...
HomeMy WebLinkAboutS-1172 Staff AnalysisFebruary 5, 1998 ITEM NO.: 4 FILE NO.: 5-1172 NAME: Wedgewood Creek - Preliminary Plat LOCATION: 13,401 Baseline Road DEVELOPER: ENGINEER• Hunnicut Construction Raymond Hickey and Development, Inc. Central Arkansas Engineering 24 Pine Manor 1012 Autumn Road Little Rock, AR 72207 Little Rock, AR 72211 AREA: 27.99 Acres NUMBER OF LOTS: 106 FT. NEW STREET: 4,000 ZONING• R-2 PLANNING DISTRICT: 16 CENSUS TRACT: 42.08 VARIANCES/WAIVERS REQUESTED: Deferral of street improvements to Baseline Road for a period of two (2) years. A. PROPOSAL: The applicant proposes to subdivide 27.99 acres into 106 single-family residential lots with 4,000 linear feet of new streets. B. EXISTING CONDITIONS: The site is mostly wooded and undeveloped. There is one single-family residence on the property. The Otter Creek Neighborhood is located to the west, with a large multi- family/golf course development located to the north across Baseline Road. C. NEIGHBORHOOD COMMENTS: Staff has received no public comments as of this writing. February 5, 1998 SUBDIVISION ITEM NO.: 4 (Cont.) FILE NO.: 5-1172 D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Baseline Road is listed on the Master Street Plan as a principal arterial. A dedication of right-of-way will be required to 55 feet from centerline for this 5 lane principal arterial. 2_ Provide design of streets conforming to "MSP" (Master Street Plan). Construct one-half street improvements to these streets including 5 foot sidewalks. 3. Need to provide temporary cul-de-sacs for phase I or extend Wedgewood Creek Drive straight south to Woodside Drive to make a complete loop. 4. Stormwater Detention Ordinance applies to this property. 5. Grading permit will be required on this new development, if it disturbs more than one acre. 6. Obtain barricade and street cut permits prior to construction within right-of-way. 7. Provide striping and signage plans for the development, for Traffic Engineering approval. 8. All driveways shall be concrete aprons per City Ordinance. 9. Baseline Road has a 1995 average daily traffic count of 3,600 vehicles. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements to serve property. AP&L: No comments received. Arkla: No comments received. Southwestern Bell: Need minimum 10 foot rear lot easements. Water: An acreage charge of $150/acre applies to the portion of this project that is within 1/4 mile of the 16" water main. Water main extensions will be required. Request water main be stubbed out to the south with Water Works participation in that portion. Fire Department: 1. Fire Department has concerns with the single access point. 2. Show fire hydrants. County Planning: No Comment - inside city limits. CATA: No comments received. 2 February 5, 1998 SUBDIVISION ITEM NO.:(Cont.)FILE NO.: S-1172 F. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comments. Landscape Issues: No Comments. Other Issues: Staff suggests a secondary access to the property for safety purposes. G. ANALYSIS• A revised plat was submitted to staff on January 22, 1998. The revision addresses all outstanding issues as discussed in the Subdivision Committee meeting. The applicant is requesting deferral of street improvements to Baseline Road for a period of two (2) years. Public Works staff has indicated support of this request. H. STAFF RECOMMENDATIONS: Staff recommends approval of the preliminary plat subject to the conditions noted in paragraphs D, E and F. Staff recommends approval of the deferral of street improvements to Baseline Road for two (2) years. SUBDIVISION COMMITTEE COMMENT: Raymond Hickey and Randy Alberius were present, representing the application. Staff gave a brief description of the plat. Bruce Kemmet, of Public Works, explained the 75 foot radius requirement for Wedgeside Drive. Other Public Works issues were discussed, including the need for temporary and cul-de-sacs for Phase I. Mr. Hickey explained that the two "P.O.A." lots at the subdivision's entrance would have decorative brick walls and landscaping. He stated that the other "P.O.A." lot (southeast corner of the property) would be for stormwater detention. After a brief discussion, the Committee forwarded the issue to the full Commission for final action. February 5, 1998 SUBDIVISION ITEM NO.: 4 (Cont.) FILE NO.: 5--1172 PLANNING COMMISSION ACTION: (FEBRUARY 5, 1998) Staff informed the Commission that there were no outstanding issues associated with this item. There were no objectors present. The Chairman placed the item on the Consent Agenda for approval. The item was approved by a vote of 11 ayes, 0 noes and 0 absent. N