HomeMy WebLinkAboutS-1167 Map 1^177EN5ER6, DELONY I$ INC.
N:;�EX OF I7R�W N�
GI UTILITY 51TE PLAN $ LAND56APIN6
G2 SURVEY
Al FLOOR PLAN, ROOF PLAN 4 ELEVATIONS
A2 5EGTION5 4 DETAILS
MEPI ELEGTRIGAL PLAN � NOTES
PLUMBING PLAN $ NOTES
r•
r
/
yam.
1�1 J7LJF L TO
EXHIBIT D
�q
NNE'. 7-0T� MQ HbLIEF
I
S 1,'
� k
Wiv
To,
�� � 1 V � T^ F �r1d�•,n � , .
CAW.l�
<J
�c
i
F?
L rn
C:Z'yam t�14
�1 N
�-� D
L A O U T
GErAEPAL PLUMBING UTILITY CONNECTION NOTES:
The Sl e utilities shall be coordinated with the utility. The
Contrrctor is respcnsible for any connection fees required by the
serving itility companies.
/ 2. The water utility service line and meter serving the existing Office
Building Shall be replaced with a one and one half inch line with
i' mete,., s,zEd for a 45 GPM demand. The contractor shall provide a one
GZ-.&PE and one half incl service line with pressure reducing valve and
reduced pressure backflow preventer for the Car Wash. The existing
service line for the Office Building shall remain. The contractor
G H OL.L.-r 7-rp h- 48' U•C. shall field verify the exact size and location of the existing water
lines.
F�)ED T 3. The gas meter serving the existing Office Building shall be used to
r' serve the Car Wash. A one and one half inch line shall extend from
the existing qas header underground to serve the Car Wash. The gas
EX1S� demand for t'ae meter is estimated to be approximately 450 MBH. The
contractor shall field verify the exact size and location of the
existing gas linF,s.
LIP'i .4"r_- �� 5�.% 4. A four inch sanitary sewer shall extend from the Car Wash and connect
to the sanitary sewer manhole located on the north side of the site.
�� ,9 J Che sanitary line shall be provided with a 1,000 gallon oil and water
separator and a 1,000 three compartment sand trap. The contractor
shall field verify the exact location of the existing manhole.
III IEN8r&
.�
DELoNY
DAVIOSON, INC.
0
0
C-10
WA- NSP
o `<
Q
LL
`1
CIL
Q
WY
v
0
o'
co
w
J
Z
FL
U
Z
Z
J
a
J
�
m
0
_C)
•
Cl
11