ITEM NO.: 6 FILE NO.: S-1162
NAME: Baptist Health - Kanis South Addition
LOCATION: 10,200 Block of Kanis Road (south side of Kanis)
DEVELOPER•
Baptist Health
C/o Earl Paul
9601 I-630, Exit
Little Rock, AR
202-2000
AREA• 31.54 acres
ZONING• 0-3
ENGINEER•
The Mehlburger Firm
c/o Greg Sullivan
7 201 South Izard Street
72205 Little Rock, AR 72201
375-5331
NUMBER OF LOTS: 4 FT. NEW STREET: None
PLANNING DISTRICT: #11
CENSUS TRACT: 24.04
VARIANCES/WAIVERS REQUESTED: None
A. PROPOSAL:
To subdivide this 31+ acres of land in order to establish
two lots at Kanis and Wilson Streets for sale. At this
time, the owner does not have plans for the two large tracts
along Wilson Road and further plat activity is expected.
B. EXISTING CONDITIONS:
This tract of land is totally undeveloped and covered by
trees and undergrowth. The boundary streets are varied as to
condition. Jr. Deputy Road is the only abutting street
constructed to Master Street Plan standards. The land is
rolling generally falling south and west away from Kanis
Road. Areas to the south and east are developed
residentially.
C. NEIGHBORHOOD COMMENTS:
One phone call at this writing. Notice was mailed to all
abutting owners.
The single call was an owner at 1309 Jr. Deputy with very
general questions. He said he probably would not attend the
meeting on October 30.
October 30, 1997
SUBDIVISION
ITEM NO.: 6 (Cant.) FILE NO.: S-1162
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Kanis is listed on the MSP as a minor arterial. A
dedication of right-of-way will be required to 45 feet
from centerline prior to issuance of a building permit.
2. Dedication of right-of-way of 60 feet wide along Wilson
and a 20, radial dedication at the intersection is
required.
3. Dedication of right-of-way to 30 feet from centerline of
16`h Street, Jr. Deputy, and Aldersgate Road are
required.
4. Provide design of streets conforming to the MSP.
Construct one half street improvements to streets
including sidewalk prior to final platting.
5. A grading permit is required if more than one acre is
disturbed. Contact Melvin Hall at 371-4461 or Steve
Loop at 371-4740.
6. Stormwater detention ordinance applies to this property.
7. Provide three copies of site grading and drainage plans
and detention calculations. Contact Bruce Kemmet at
371-4740.
8. Provide for street lights, contact Traffic Engineering
340-4856.
9. Utility excavation within proposed rights -of -way shall
be per Article V of Sec. 30.
10. Driveways shall conform to Sec. 31-210 or Ordinance
16,577.
11. Kanis Road has a 1995 average daily traffic count of
9700.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements.
AP&L: No response.
Arkla: OK as submitted.
Southwestern Bell: OK as submitted.
Water: On site fire protection required. May require
additional mains.
Fire Department: Show fire hydrant location.
County Planning: No Comment - inside city
CATA:
1. No response. Baptist Medical Center route, all day
service two blocks east.
2. Shuttle service on Aldersgate Road serves the camp and
Good Shepherd.
i�
October 30, 1997
SUBDIVISION
ITEM NO.: 6 Cont. FILE NO.: 5-1162
F. ISSUES/TECHNICAL/DESIGN:
Landscape:
Issues: No comment, does not apply.
Planning Division:
G. ANALYSIS: No comment, complies with land use plan as an
office plat.
H. STAFF RECOMMENDATIONS:
Approval of the preliminary plat subject to the applicant
adequately responding to the issues set forth by Planning
and Public Works staff. Those of specific concern to
Planning Staff are: 1) offer some guidance as to the
owners plan to terminate Wilson Road, 2) offer a position
on building or abandoning W. 16`h Street, 3) offer a
phasing plan.
SUBDIVISION COMMITTEE COMMENT: (OCTOBER 9, 1997)
The application was represented by Ms. Sally Boatman of the
Mehlburger Engineering Firm. The Chair asked her if the issues
offered by staff could or would be dealt with by October 30`h
meeting.
Ms. Boatman indicated that she understood the staff comments and
that she would follow-up.
The discussion centered on driveway access, the W. 16`h Street
status and the future of tracts. David Scherer of Public Works
noted that Kanis Road is a construction project of the City to
widen and that work will begin in the near future.
At the end of a lengthy discussion, the Committee determined to
pass the plat to the full Commission and directed the applicant
to provide responses by October 16.
PLANNING COMMISSION ACTION:
(OCTOBER 30, 1997)
The Chairman recognized Richard Wood, of the Staff, for purposes
of offering the staff recommendation. Wood proceeded to identify
the plat as to its type. He also pointed out there were some
continuing issues from the rezoning history of the property which
dealt with the eventual usage or discontinuance of Wilson Road
and the abandonment of West 16th Street. Wood pointed out that
the engineer and the applicant would be in attendance today and
could address those issues.
3
October 30, 1997
SUBDIVISION
ITEM NO 6_ (Cont.) FILE NO.: 5-1162
Mr. Frank Riggins came to the lectern and identified himself as
well as Mr. Earl Paul, representing the Baptist Medical Systems.
Mr. Riggins stated the issues that were identified would be
addressed in a revised preliminary that would return to the
Commission for the next review cycle for purposes of excising an
additional lot at the corner Aldersgate Road. This revised plat
would be filed on Monday of next week November 3, 1997.
Commissioner Putnam at this point suggested the agenda as drawn
had some 11 items for resolution. Mr. Riggins indicated that
most of those items would be taken care of on this plat. Putnam
stated that he understood at the Subdivision Committee meeting
that these items would be taken care of prior to this public
hearing. Richard Wood responded by saying they have except to
the extent of the two areas of concern that were identified when
the item was introduced.
The Chairman then recognized Commissioner McCarthy who posed the
question to staff as to why this item was not deferred. Wood
responded by saying the plat is a simple issue and the several
remaining items are holdovers which can be dealt with the second
revision. Chairman Lichty stated he did not think a parallel
could be drawn between this item and a earlier issue.
The Chairman then asked if there was anyone else who wished to
address this issue pro or con. Commissioner Earnest posed a
question as to whether or not the issues needed to be resolved
were things such as construction on Kanis Road. Wood stated that
he believed Public Works had that issue of Kanis improvements
pinned down because there is a project underway.
Mr. Riggins returned to the lectern and stated that having again
reviewed this list of items he stated they will be responded to
as the various lots are developed.
The Chairman asked if there was a motion on the floor.
Commissioner Putnam offered a motion to approve the plat as
presented. The motion includes an understanding that the
applicant will address all of the items and conform to all of the
recommendations and address the issues highlighted in the agenda.
The motion was seconded and passed by a vote of 9 ayes and
2 absent.
4