HomeMy WebLinkAboutS-1109 Staff AnalysisOctober 10, 1996
ITEM NO.: I FILE NO.: S-1109
NAME: H&S SUBDIVISION -- PRELIMINARY PLAT
LOCATION: On west side of Crystal Valley Road south of
Whippoorwill Lane
DEVELOPER:
Harold D. and Shirley Smith
18201 Lawson Road
Little Rock, AR 72209
DEVELOPER:
ENGINEER•
Rodney and Chandra Russell B. T. Armstrong and Assoc.
#30 Art Pond Road #2 Pinnacle Dr.
Conway, AR 72032 Little Rock, AR 72205
AREA: 13.37 ACRES NUMBER OF LOTS: 3 FT. NEW STREET: None
ZONING: R-2 Single Family District
PLANNING DISTRICT: #17 Crystal Valley
CENSUS TRACT: 42.08
VARIANCES REQUESTED:
PROPOSED USES:
Single Family and Planned
Commercial Development
1) Street Improvements on Crystal Valley Road
2) Lot depth -to -width ratio for Lot 1
BACKGROUND:
This preliminary plat seeks to legitimize 30 foot strip along the
southern boundary of what is shown as Lot 1 which was recently
sold from Mr. and Mrs. Smith to Mr. and Mrs. Russell. A
companion application to the preliminary plat will also allow
Mr. Smith to construct an office/warehouse building on property
shown as Lot 2 on the plat. (PD-C Z-6180)
October 10, 1996
SUBDIVISION
ITEM NO.: I Cont. FILE NO.: S-1109
A. PROPOSAL/RE VEST:
This preliminary plat will create three lots. Two will
accommodate existing single family residences and one for a
proposed Planned Development Commercial use.
B. EXISTING CONDITIONS:
The land is heavily wooded and gradually slopes to the
southwest. A one-story frame home with a shop out building
is located on Lot 1. A single family story home is located
on Lot 3 with detached storage and greenhouse structures.
Proposed Lot 2 is vacant.
Public Transportation
There is no service to these lots.
C. NEIGHBORHOOD COMMENTS:
None received at this writing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS COMMENTS:
Grading and drainage plan with soil loss calculations
is required prior to construction. Stormwater
Detention will be required. Crystal Valley Road is a
principal arterial per the Master Street Plan.
Dedicate 55 feet from centerline according to the
standards set for principal arterial particularly the
radius required for the horizontal curve is to be 900
feet. 1/2 Street improvements for frontage are
required by ordinance, staff recommends commercial
widening to create center -turn lane and tapers for
business and a deferral of the remaining improvements
until further development occurs or five years. 1992
average daily traffic was 1,840 vehicle per day.
E. UTILITY COMMENTS/FIRE DEPARTMENT/COUNTY PLANNING/LANDSCAPE:
Wastewater: Outside service boundary, no comment
Arkla: OK
Southwestern Bell: OK
Water: No objection. Execution of pre -
annexation agreement and approval
from City required.
AP&L : No comment
2
October 10, 1996
SUBDIVISION
ITEM NO.: I Cont. FILE NO.: S-1109
Fire Department: Hydrants installed no more than 800
feet apart. Access to structures
require a 15 foot driveway that will
support fire apparatus.
County Planning: No comment
Landscape: No comment
F. ISSUES/LEGAL/TECHNICAL/DESIGN:
M Label 900 foot right-of-way on Crystal Valley Road.
G. ANALYSIS•
This plat will create three parcels. Lots 1 and 3 have
existing single family homes. An office/warehouse building
is proposed on Lot 2. The applicant is request a waiver of
street improvements on Crystal Valley Road. Staff
recommends widening to create a center -turn lane for the
proposed business on Lot 2. A deferral of the remaining
improvements is recommended for up to five years. (See
Public Works comments)
H. STAFF RECOMMENDATIONS:
Approval of the preliminary plat without a waiver of street
improvements. Staff recommends that a portion of the
Crystal Valley Road improvements be deferred when other
development occurs or up to five years as outlined in the
staff comments of paragraphs D, E and F.
SUBDIVISION COMMITTEE COMMENT: (AUGUST 8, 1996)
Mr. Jim Summerlin and Harold Smith were present to answer
questions. Planning staff asked that the 55 foot proposed street
dedication from centerline of Crystal Valley Road be shown on the
preliminary plat. David Scherer required adjacent to Lot 2
commercial widening to create a center -turn lane and tapers be
required. The remaining road improvements can be deferred up to
five years.
The item is to be forwarded to the full Commission for
consideration.
October 10, 1996
SUBDIVISION
ITEM NO.: I Cont. FILE NO.: S-1109
PLANNING COMMISSION ACTION: (AUGUST 29, 1996)
When the meeting was called to order, it was apparent that no
more than 8 commissioners would be present. The Planning
Commission Bylaws require a minimum of 6 affirmative votes for an
item to be approved.
Chairman Woods announced to the audience that any applicant on
the agenda who wishes to have their item heard by the full
Commission can request a deferral at this time. Mr. Harold Smith
requested a deferral to the Planning Commission meeting on
October 10, 1996. This item was included as part of the Consent
Agenda for deferral.
A motion to approve the Consent Agenda for deferral. The motion
passed by a vote of 8 ayes, 0 nays, 2 absent and 1 open position.
SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 19, 1996)
Mr. Harold Smith introduced his new engineer B. T. Armstrong.
The engineer presented the project to the Subdivision Committee.
David Scherer indicated that Public Works was requesting a
minimum 900 foot radius for the horizontal curve on Crystal
Valley Road. Mr. Smith stated that he objected to this
requirement. Commission Putnam told Mr. Smith that he would need
to take it up with the full Commission.
The item is to be forwarded to the full Commission for
consideration.
PLANNING COMMISSION ACTION:
Mr. Harold Smith indicated his objection
right-of-way requested by Public Works.
the need for the public right-of-way in
stated that the 15% in -lieu hardship fee
this case.
(OCTOBER 10, 1996)
to the width of the
David Scherer explained
this location. He also
may be appropriate in
Commissioner Hawn stated that staff had made a reasonable
compromise in requesting the 900 feet right-of-way on Crystal
Valley Road. He said that if the applicant did not want to grant
that right-of-way, then he did not have to go through with the
preliminary plat and rezoning.
A motion to approve the preliminary plat
the staff report. The motion passed with
3 absent.
subject to conditions in
8 ayes, 0 nays and
4
October 10, 1996
SUBDIVISION
ITEM NO.: I (Cont.) FILE NO.: S-1109
A motion to approve a waiver of the lot depth -to -width ratio for
Lot 1. The motion passed with 8 ayes, 0 nays and 3 absent.
5