Loading...
HomeMy WebLinkAboutS-1096-C Staff AnalysisJune 22, 2000 ITEM NO.: 11 FILE NO.: S-1096-C NAME: Autumn Subdivision (Lot 2) - Subdivision Site Plan Review LOCATION: 1012/1014 Autumn Road DEVELOPER: ENGINEER - Central AR Land Development, LLC Central AR Engineering 1012 Autumn Rd., Ste. 1 1012 Autumn Road, Ste. 2 Little Rock, AR 72211 Little Rock, AR 72211 AREA: 2.18 acres ZONING: 0-3 NUMBER OF LOTS: 1 FT. NEW STREET: 0 ALLOWED USES: Office PROPOSED USE: Office VARIANCES/WAIVERS REQUESTED: A variance is requested for driveway setback from a side property line. BACKGROUND: On May 11, 2000 the Planning Commission approved a preliminary plat for the Autumn Subdivision. Lot 2 of the Autumn Subdivision contains a 5,590 square foot (1 story) office building and 24 parking spaces within the northeast portion of the property. There is also a single story frame structure, located on the south side of the existing office building, which will be removed with the proposed development of Lot 2. A. PROPOSAL/REQUEST: The applicant is proposing a multiple -building site plan review for Lot 2, Autumn Subdivision. The proposed development is proposed in the following phases: Phase I - A 7,014 square foot (single -story) office June 22, 2000 SUBDIVISION ITEM NO.: 11 (Cont.) FILE NO.: 5-1096-C building and 58 parking spaces. Phase II - A 15,000 square foot (two-story) office building and 38 parking. The applicant has noted that the maximum building height will be approximately 20 feet. As part of the proposed development (Phase I), the applicant will close the existing driveway from Autumn Road and relocate the drive to near the southeast corner of the property. This drive will line up with the existing drive on the east side of Autumn Road (Kidsports). The applicant is requesting a variance for the proposed drive. The ordinance requires a drive to be setback at least 125 feet from side property lines. The proposed drive is approximately 18 feet from the south property line. A ground -mounted sign location has been shown on the site plan. The applicant notes that the sign will conform to the ordinance standards for office zoning. The existing building and parking, proposed buildings, parking areas, drive, landscaped areas and other proposed improvements are shown on the attached site plan. B. EXISTING CONDITIONS: There is an existing office building and a single story frame structure on the proposed Lot 2, Autumn Subdivision. There is a mixture of office and commercial uses to the north along Chenal Parkway and to the east across Autumn Road. There is undeveloped property immediately south of this site, with an office building and two single family residences further south along the north side of Kanis Road. There is a contractor's maintenance yard to the west and an office/mini-warehouse development to the northwest. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received no comment from the neighborhood. The Birchwood and Gibralter Heights/Point West/Timber Ridge Neighborhood Associations were notified of the public hearing. D . ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Autumn Road is listed on the Master Street Plan as a collector street. Dedicate right-of-way to 30 feet from centerline. 2 June 22, 2000 SUBDIVISION ITEM NO.: 11 (Cont.) E. F. FILE NO.: 5-1096-C 2. Provide design of street conforming to "MSP" (Master Street Plan). Construct one-half street improvements to this street including 5-foot sidewalk with planned development. 3. Stormwater detention ordinance applies to this property. 4. Autumn Road has a 1998 average daily traffic count of 3,300. 5. Plans of all work in right-of-way shall be submitted for approval prior to start of work. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available, not adversely affected. AP&L: No Comments received. Arkla: No Comment. Southwestern Bell: No Comments received. Water: On site fire protection will be required. Fire Department: Place fire hydrants per code. Contact Dennis Free at 918-3752 for details. County Planning: No Comments received. CATA: No effect; Site is not on a dedicated bus route, but is close to bus route #5. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comment. Landscape Issues: A three (3) foot wide building landscape strip is required between the public parking area and building it serves. There is considerable flexibility with this requirement. However, additional building landscaping will be necessary above what is shown on the plan submitted. A six (6) foot high opaque fence, either a wood fence with its face side directed outward or dense evergreen plantings, is required along the southern perimeter adjacent to residential property. The property to the west is also zoned residential but its use is for a contractor's outdoor storage area, therefore, screening along the western perimeter may not be deemed practical. E�3 June 22, 2000 SUBDIVISION ITEM NO.: 11 (Cont.) FILE NO.: S-1096-C G. SUBDIVISION COMMITTEE COMMENT: (DUNE 1, 2000) Randy Alberius was present, representing the application. Staff briefly described the proposed site plan and noted that some additional information was needed. The Public Works requirements were briefly discussed. Tad Borkowski, of Public Works, noted that Public Works was OK with the proposed driveway location. He noted that a variance for the drive location would need to be requested (setback from property line). The landscape requirements were also briefly discussed. Mr. Alberius noted that evergreen screening would be provided along the south property line, where adjacent to residential property. After the brief discussion, the Committee forwarded the site plan to the full Commission for final action. H. ANALYSIS: The applicant submitted a revised site plan to staff on June 7, 2000. The revised plan addresses the issues as raised by staff and the Subdivision Committee. The applicant has made the following notes on the revised plan: 1. A 6 foot opaque fence or dense evergreen screening will be provided along the south property line, where adjacent to residential property. 2. The dumpster area will be screened on three (3) sides with an 8 foot opaque fence or wall. 3. Building landscaping will be provided and will conform to ordinance standards. The applicant is proposing a total of 120 parking spaces for this proposed development. The ordinance minimum requirement for an office development of this size is 65 spaces. Staff is comfortable with the parking plan as proposed. 4 June 22, 2000 SUBDIVISION ITEM NO.: 11 (Cont.) FILE NO.: S-1096-C As noted in paragraph A., the applicant is requesting a variance for the proposed new driveway location. Public Works supports the variance as requested due to the fact that the new drive will align with the existing driveway on the east side of Autumn Road. Otherwise, to staff's knowledge, there are no understanding issues associated with the proposed site plan. With the exception of the driveway location, the site plan conforms to ordinance standards. Staff feels that the proposed site plan will have no adverse impact on the general area. I. STAFF RECOMMENDATIONS: Staff recommends approval of the proposed site plan subject to the following conditions: 1.Compliance with the requirements as noted in paragraphs D, E and F of this report. 2. Staff recommends approval of the variance for driveway setback. 3.Any site lighting should be low-level and directed away from adjacent residential property. 4. The dumpster area must be screened as three (3) sides with an 8 foot opaque fence or wall. 5.The proposed ground -mounted sign must conform to the ordinance standards for office zoned property. 6.Lot 2, Autumn Subdivision must be final platted prior to a building permit being issued. PLANNING COMMISSION ACTION: (JUNE 221 2000) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. The Chairperson placed the item before the Commission for inclusion within the Consent Agenda for approval as recommended by staff. A motion to that effect was made. The motion passed by a vote of 9 ayes, 0 nays and 2 absent. 5