Loading...
HomeMy WebLinkAboutS-1100-F ApplicationCIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: CAPITOL LAKE ESTATES REPLAT OF 228&229 INSPECTOR REPORT IV14— I have made a final inspection of the improvements and find that: v All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted as follows: Engineering Specialist ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. Civil Engineer I/II SURVEYOR'S REPORT I have reviewed the plat and find that: L� All requirements for final plat approval have been satisfied. . _ Surveyor % �< MANAGER APPROVAL All Civil Engineering requirements for filing 1-11is final plat have been satisfied. October 2004 � 1] CIVIL DESIGN • INCORPORATED 15104 CANTRELL ROAD LITTLE ROCK, ARKANSAS 72223 July 7, 2005 Ms. Donna James Subdivision Administrator Little Rock Department of Planning & Development 723 West Markham Street Little Rock, Arkansas 72201 Re: Proposed Replat for Lots 228-229 Capitol Lakes Estates — Phase 1 B Little Rock, Arkansas Dear Donna: Please find enclosed three (3) copies of the proposed replat for the above referenced project. Please forward this request to Public Works for approval as needed. Once Public Works approval is received, we will bring you the original and the utility sign off for signing. If you have any questions or comments, please do not hesitate to call. Respectfully submitted, Civil Design, Inc. James Dreher, E.I. Staff Engineer JHD/jd ■ ENGINEERING & SURVEYING SERVICES — TEL (501) 868-7717 o FAX (501) 868-5099