HomeMy WebLinkAboutS-0185-N Map 1FOUND 5/8" REBAR
it
0
6
Go
r`
w
N
0
O
z
FOUND 5/8" REBAR
w
Q
0
O
FOUND 5/8" REBAR S89'45'56"E 454.59'(M)
S89'47'08"E 454.62'(P)
D P & L
TRACT B
AREA 101
S89'47'08"E 504.62'(P)_
S89'47'29"E 544.73'(M)
TRACT G, AREA 101
Sri
i�
FOUND 5/8" REBAR
40.00'
RAILROAD EASEMENT
1111111111111111mm •o
3
FOUND 5/8" REBAR
0.4' SOUTH OF &
0.3' EAST OF CORNER
LLJ
___,—FUTURE LITTLE ROCK
v < /
PORT RAILROAD
O ❑"
FOUND 12" / ( ) FOUND 1/2" REBAR
REBAF� S88'45'16"E PAGIS
< v; N 136844.54 / S88'47'31 "E
E 1251712.97 94.86' N 13684248
L 1251807.80
FOUND 1/2" REBAR 1
'0,/
�g0�
�..1- E4�- ---- ---�— - ___- _.�--- -�. 9-�'-
/ 40 RAILROAD EASEMENT
,Q-11'4 'It-''t_(PAGIS)
S88*47'31 "E /
' 137.0(7I i
_FOUND 1,�Z EESAR- /
_ N 136684=4
30 L 1251393.38
BUILDING
SETBACK
I I
I
50'
BUILDING
SETBACK
N44'16'46"W
TRACT H, AREA 101
6.096 ACRES
SW1/4, SW1/4
4.9 ACRES±
FOUND 5/" REBAR \ 70.09'(CHD) 10' SANITARY 75
8
SEWER EASEMENT BUILDING 20' UTILITY
SETBACK EASEMENT
`,1 i.(1. _POINT OF BEGINNINGbT -- — -
0
N88'47'21 "W
w FOUND 5/8 REBAR 1,495.64
b _i 1Z.�Si;.42 10' UTILITY N88'45'06"W(PAGIS)
o E EASEMENT
SLOANE DRIVE
z N88'47'31"W 17 16 (120' R/W AS RECORDED IN PLAT BOOK 27, PAGE 86)
72.17' 20 21 —
POINT OF COMMENCEMENT
FOUND RAILROAD SPIKE
SW CORNER SECTION 16
T-1-N, R-11-W
30'
BUILDING
SETBACKS
rt
a 3
o-
s om
M �p
N 0 In
Ln 0o n
N
0
0
U,
Y r
Y
COLLEGE STAT101 L
1 a
S 1 e
.. LIT III rxY r•.r uoenn rrr.
HIS I ,,
VICINITY MAP
SCALE 1 "=3000'
N
GENERAL NOTES
1. *- BASIS OF BEARINGS IS THE NORTH LINE OF SEC. 21 AS SHOWN
ON THE PLAT OF THE LITTLE ROCK PORT INDUSTRIAL PARK,
PREPARED BY GARVER & GARVER, INC. DATED JULY, 1971.
2. NO ENCROACHMENTS ONTO OR OFF OF THE PROPERTY EXISTED AT
THE TIME OF THIS SURVEY, EXCEPT AS SHOWN HEREON.
3. COORDINATES SHOWN ARE BASED ON THE ARKANSAS STATE PLANE
COORDINATE SYSTEM, NORTH ZONE, NAD 83, AS DETERMINED FROM
PAGIS MONUMENT 1001.
4. THE FLOOD -INSURANCE RATE MAP PREPARED BY THE FEDERAL EMERGENCY
MANAGEMENT- AGENCY, COMMUNITY PANEL NUMBER 050181 0014 E
AND DATED NOVEMBER 3, 1993, SHOWS THAT NO PART OF THIS SITE
LIES BELOW THE 500 YEAR FLOOD, AND THAT THE SITE HAS A
ZONE X CLA-SSIFICATION.
5. UNLESS SPECIFICALLY STATED OR SHOWN, SURVEY DOES NOT LOCATE OR
DELINEATE: BUILDING SETBACK LINES, ZONING REGULATIONS, RESTRICTIONS,
OR OTHER ITEMS WHICH MAY AFFECT DEVELOPMENT, THOUGH THEY MAY
EXIST. NO STATEMENT IS MADE CONCERNING SUBSURFACE CONDITIONS, OR
THE EXISTENCE OF UNDERGROUND CONTAINERS OR FACILITIES WHICH MAY
AFFECT THE USE OR DEVELOPMENT OF THE TRACT.
GENERAL ELECTRIC
TRACT C
AREA 101
N
SCALE: 1" = 50'
50 25 0 50 100 150
LEGEND
-R�8•AR -
vs •
FOUND MONUMENT
PROPERTY LINE
BUILDING SETBACK LINE
EASEMENT LINE --
-
LAND LINE
MEASURED BEARING
(M)
& DISTANCE
PLATTED OR RECORD
(P)
BEARING & DISTANCE
_ N 136245.63
E 1251805.13
FOUND 5 8" REBAR
SW CORNER TRACT C AREA-T71
— * S88'47'31"E 3950.26'(M)
3951.19'(P)
FOUND RAILROAD SPIKE
SW CORNER SE 1/4. SE 1/4
SECTION 16
LAND DESCRIPTION
A TRACT OF LAND SITUATED IN THE SE 1/4, SE 1/4 OF SECTION 17 AND THE SW 1/4,
SW 1/4 OF SECTION 16, T-1-N, R-11-W, PULASKI COUNTY, ARKANSAS, BEING A PART OF
AREA 101 AS SHOWN ON THE LITTLE ROCK PORT INDUSTRIAL PARK ADDITION TO THE CITY
OF LITTLE ROCK, ARKANSAS, RECORDED IN PLAT BOOK 27, PAGE 86 IN THE CIRCUIT
CLERK'S OFFICE, PULASKI COUNTY, ARKANSAS, BEING MORE PARTICULARLY DESCRIBED AS
FOLLOWS:
COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION 17; THENCE N88'47'31"W, ALONG THE
SOUTH LINE OF SAID SECTION 17, FOR A DISTANCE OF 72.17 FEET; THENCE N01'12'29'E, 60.01
FEET TO THE POINT OF BEGINNING ON THE NORTH RIGHT-OF-WAY LINE OF SLOANE DRIVE;
THENCE ALONG ANON -TANGENT CURVE TO THE RIGHT HAVING A 50 FOOT RADIUS, AND A
CHORD BEARING AND DISTANCE OF N44'16'46"W, 70.09 FEET, FOR A DISTANCE OF 77.67 FEET,
TO THE EAST RIGHT-OF-WAY LINE OF MAUNEY ROAD (HAVING A R/W OF 100'); THENCE
N00'12'51"E ALONG THE EAST RIGHT-OF-WAY LINE OF MAUNEY ROAD, 381.09 FEET TO THE
SOUTHWEST CORNER OF TRACT G, AREA 101, LITTLE ROCK PORT INDUSTRIAL PARK AS SHOWN IN
PLAT BOOK E, PAGE 741; THENCE ALONG THE SOUTH LINE OF SAID TRACT G S88'47'31"E, 131.00
TO THE BEGINNING OF A TANGENT CURVE TO LEFT; THENCE CONTINUING ALONG SAID SOUTH
LINE ALONG SAID CURVE TO THE LEFT HAVING f+ 383.06 FOOT RADIUS, AND A CHORD BEARING
AND DISTANCE OF N63'24'41"E, 35727 FEET, FOR A DISTANCE OF 371.68 FEET; THENCE LEAVING
SAID CURVE AND CONTINUING ALONG SAID SOUTH LINE OF TRACT G, S88'47'31"E, 94.86 FEET TO
THE SOUTHEAST CORNER OF SAID TRACT G ON THE WEST LI"JE OF TRACT C, AREA 101 OF SAID
LITTLE ROCK PORT INDUSTRIAL PARK ADDITION; THENCE ALONG SAID WEST LINE, SOO'13'09"W
596.86 FEET TO THE SOUTHWEST CORNER OF SAID TRACT C, THENCE N88'47'21"W, 495.64 FEET
TO THE POINT OF BEGINNING; SAID TRACT OF LAND CONTAINING 6.096 ACRES (265,529 S.F.),
MIRE OR LESS.
`�IlnUlull,/,
///sPIT off-_ �J��GISTEFFQ�
1� ARK'--JANSQS
11 'STATE OF
ARKANSAS'
111 REG* S ED �� = NO. 979 /=
P 0- CSIONAL �� ✓I
INFER 1� `''ArurF� _
/� 11
�IAtt EAK �/ Lllr, -
CERTIFICATE OF OWNER
WE, THE UNDERSIGNED, OWNERS OF THE REAL ESTATE SHOWN AND DESCRIBED HEREIN, DO
HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED AND SUBDIVIDED, AND DO HEREBY
LAY OFF, PLAT AND SUBDIVIDE SAID REAL ESTATE IN ACCORDANCE WITH THIS PLAT.
JIM DAILEY, MAYOR I DATE OF EXECUTION
CITY OF LITTLE ROCK, ARKANSAS
SOURCE OF TITLE: SEE FINAL PLAT, BOOK 27 PAGE 86
CERTIFICATE OF ENGINEERING ACCURACY
I, WILLIAM E. RUCK, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A
PLAN MADE BY ME, AND THAT THE ENGINEERING REQUIREMENTS OF THE LITTLE ROCK'
SUBDIVISION RULES AND REGULATIONS HAVE BEEN COMPLIED WITH.
wee, /y93
DATE OF EXECUTION REGISTERED PROFESSIONAL ENGINEER NO. 4686
CERTIFICATE OF SURVEYING ACCURACY
1, WALTER H. SPAUL, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS A B01-;^:DARY
SURVEY:.;ADE UNDER MY SUPERVISION, ALL MONUMENTS REQUIRED ACTUALLY EXIST AND ARE
CORRECTLY SHOWN HEREON AND THAT ALL SURVEYING REQUIREMENTS OF THE LITTLE ROCK
SUBDIVISION R�LES AND REGULATIONS HAVE BEEN COMPLIED WITH.
r
DATE OF EXECUTION REGISTERED LAND SURVEYOR NO. 979
WALTER H. SPAUL
RATIO OF CLOSURE: 1 : 323,700
CERTIFICATE OF FINAL APPROVAL
PURSUANT TO THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS, AND ALL OF THE
CONDITIONS OF APPROVAL HAVING BEEN COMPLETED, THIS DOCUMENT IS HEREBY ACCEPTED.
THIS CERTIFICATE IS HEREBY EXECUTED UNDER THE AUTHORITY OF SAID RULES AND REGULA
TIONS.
DATE OF EXECUTION LITTLE ROCK PLANNING COMMISSION
CERTIFICATE OF RECORP,* I k X
THIS .DOCUMENT NUMBERFILED FOR RECORD • I�yP�LAJ• j3GOK
PAGE FOR BILL OF ASSURANCE SEE DOCUMENT NO.'' i.
CIRCUIT CLERK
1
s1P, a
TRACT H, AREA 101
LITT�� ROCK PORT INDUSTRIAL PARK
LITTLE ROCK, ARKANSAS
A REPLAT OF PART OF AREA 101
Garver+Garver
Engineers and Planners 4'
Little Rock, Arkansas FI
NA
FEBRUARY 1998 As 911
B �fF