Loading...
HomeMy WebLinkAboutS-0181-G Map 1N k Cry FI.P. F/.P, �Q 133.4P 1"5&8°473/'E 58(5047'3/"E 607.24 \ I 10' U+tli}y EclsemerW I RESIDUAL h TRACT_ D-1 J 'r) TRACT D-2 I TRACT D-31 ti :' AREA 101 Q I 1.00 Ac. I o N 4.00 Ac. 75— al'/ding Line I PoinI of Beginning IV F/P. FLP p u+ili RAZ ER PIKE S.W Corner of the SE a of Section /6, T-/-N, 9-11-W LEGS, L DLSCRIP1ION TRACT D-3 ARFA 101 A parcel or Land 1(, aced to the SW 1,4 of the SL I:4 of Seclm:: 16. Township I North, Range I I Aest, Pulaski Cmun:}', Arkansas, and being more particularly described as follows: Commencin_ A the southeast corner of the SW 1/4. SF 1 4 of Section 16. Township 1 North, Range I I West: thence N 01� 30' 5' E. 00.00 feet along the east line of the SW 1/4. SE 1/4, of said Section to a point: thence N 88` 47' 31" W_ 699.18 feet alone the north right-of-way. line of Frazier Pike to the Point of Beginnine:ihence from Said Point of Beginning continue N 882 47' 31 " W. I51 .1 7 feet alone said north right-of-wap hne to the West Line of Tract D-3 Area 101 : thence N 010 1-` 48" E. _88.18 feet alone said nest line: thence S 88' 47' 31" E. 151 .15 feet: thence S 01' 1-` '9" W. _288.18 feet to the Point of Beginning and containing 1.00 acre More or less. a I /0' 0/i///y Ease enl-ij I R= 50.00' L = 78 27' 1V66'47'31"W 4 555-95 ,It � N ' I� O h 75' 1 /20' / I lQ 3. 23, FoundR. R. Spike rain/! of Commencement Southeast Corner of the SW %a, SE %4 0/ Section /5, T-1-N, R-1, -W I• F/.P CERTIFICATE OF ENGINEERING ACCURACY 1, STEVEN L. HAYNES, HEREBY CERTIFY THAT THIS PLAT CORRECTLY REPRESENTS 5kY Corner of the 'A SURVEY AND A PLAN MADE BY ME OR UNDER MY SUPERVISION; THAT ALL MONU- MENTS SHOWN HEREON ACTUALLY EXIST AND THEIR LOCATION, SIZE, TYPE AND > > MATERIAL ARE CORRECTLY SHOWN, AND THAT ALL REQUIRETVIENTS OF THE LITTLE 16, T-I-N, 9-11-W ROCK SUBDIVISION RULES AND REGULATIONS HAVE BEEN FULLY COMPLIED WITH. DATE OF EXECUTION REG, PROFESSIONAL ENGINEER NO. 5459 CERTIFICATE OF SURVEY_ 1, RONNIE D. HALL, CERTIFY THAT A SURVEY CREW OF GARVER & GARVER, INC., ENGINEERS, LITTLE ROCK; ARKANSAS DID SURVEY THIS PIECE OF REAL ESTATE UNDER MY DIRECTION AND THIS DRAWING IS AN ACCURATE PORTRAYAL OF THE SURVEY RESULTS. DATE OF EXECUTION REGISTERED LAND SURVEYOR NO. 865 CERTIFICATE OF OWNER WE, THE UNDERSIGNED, OWNERS OF THE REAL ESTATE SHOWN AND DESCRIBED HERE- IN DO HEREBY CERTIFY THAT WE HAVE LAID OFF, PLATTED AND SUBDIVIDED AND DO HEREBY LAY OFF, PLAT .AND SUBDIVIDE SAID REAL ESTATE IN ACCORDANCE TH THE WITHIN PLAT. DATE OF EXECUTION AYGOOD OF ARKANSAS % 23.5' JAMES R. HAYGOOD III ,(PRESIDENT SOURCE OF TITLE: SEE PLAT OF LITTLE ROCK PORT INDUSTRIAL PARK PLAT RECORD BOOK NO. 27, PAGE 86 CERTIFICATE OF FINAL APPROVAL PURSUANT TO THE LITTLE ROCK SUBDIVISION RULES AND REGULATIONS AND UNDER THE CONDITIONS OF ORDINANCE NO. 11,338, THIS DOCUMENT IS GIVEN FINAL APPRO. VAL BY THE LITTLE ROCK PLANNING COMMISSION. ALL OF THE CONDITIONS OF APP '(OVAL HAVING BEEN COMPLETED THIS DOCUMENT IS HEREBY ACCEPTED AND THIS CERTIFICATE EXECUTED UNDER THE AUTHORITY OF SAIDRULESAND REGULATIONS. -DATE OF EXECUTION DEP'f. OF COMPRE14ENSIVE PLANNING LITTLE ROCK, ARKANSAS rERTIFICATE OF ;�ECORDING THIS DOCUMENT `vUMBf FILED FOR R04D _- =S PLAT ?:UMBER _ FOR BILL OF ASSURANCE SEE DOCUMENT :iUMBEA CIRCUIT CLERK t rLE t�K PORr P. - )STR'A, DISTRICT ' J , r MAp ,I T`RkCTZ-Z-AREA 101 LITTLE ROCK PORT INDUSTRIAL PARK A REPLAT OF TRACT D-1 AREA 101 R4 NDUSTRIAL PARK PRE N A E B Y RVER 8 GAR VER, INC. E N G I N E E R S LITTLE ROCK,, ARKANSAS lap too 200 S CALE — 1" =' 100' -- D ATE — AUGUST 24, 1985