HomeMy WebLinkAboutS-0137 Staff AnalysisP11 137
0
k
September 9, 1980
SUBDIVISIONS
T 4 ..... w[.. 7
NAME: Tract E, Area 101
Little Rock Port Industrial Park
LOCATION: 1/4 Mile West of Fourche Dam Pike
on South Side of Lindsey Road
T1i[1L[T lITITTI _ Tl.i /�T1.[T1TT _
Port Authority Garver and Garver
llth at Battery Street
Little Rock, AR 72202
Phone: 376-3633
AREA: 42.0 Acres NO. OF LOTS: 8 FT. OF NEW ST.: 1,747
ZONING: 11I-3" PROPOSED USES: Industrial
PLANNING DISTRICT: 13
CENSUS TRACT: 40.01
VARIANCES REQUESTED:
1. 30' building line along west line of plat.
r
September 9, 1980
SUBDIVISIONS
Item No. 3 - Continued
STAFF REPORT
A. EXISTING CONDITIONS
The property involved is flat and has been agricultural
use for many years. All abutting properties are zoned
Industrial and sparsely developed as warehousing and
truck terminals.
B. EXISTING FACILITIES AND SERVICES
All public facilities and services are in place.
C. DEVELOPMENT PROPOSAL
The owner/developer proposes a replat of this large
tract into lots of types suitable to smaller
industrial users and equipment service companies.
D. CONFORMANCE TO ORDINANCE STANDARDS
149 The plat conforms to all codes except for minor plat
details and one waiver of setback. _
0
E. STAFF RECOMMENDATION
Approval of the plat and waiver subject to:
Completion of preliminary plat requirements, provide
one-half of a 28' pavement and 6' shoulder along
Frazier Pike, provide building line on east side of
Lots 1-7 along easement boundary.
SUBDIVISION COMMITTEE RECOMMENDATION:
Approval as recommended by staff. The vote - 3 ayes,
0 noes. (In the discussion of this plat, sidewalks were
mentioned as a possible requirement. The Committee
recommended that they not be required. The Ordinance does
not require the installation of sidewalks as a specific but
allows the Commission to require them as a design
consideration.)
X September 9, 1980
SUBDIVISIONS
Item No. 3 - Continued
PLANNING COMMISSION ACTION:
The applicant was present and offered a change in the plat
which provided for a phased development. The plat is to be
finaled in two phases. Phase I will consist of Lots 1-4.
Phase II will consist of Lots 5-8. The street improvements
on Frazier Pike and the new north/south street will be
staged to match final platting. The applicant was advised
that a request for phasing with expansion should be filed
for record. After a brief discussion, the Commission voted
to approve the plat as recommended by the subdivision
Committee and modified by the applicant at the meeting. The
vote - 8 ayes, 0 noes, 3 absent.