HomeMy WebLinkAboutS-0128-O Map 245
I. s.LL ��GM�=N l �I-IoV�tN TJ P
Lk-- C� Fc:� LITI LI TI AND/0F?
2 1 t20N
�.Ri% GHo�2r�
4. �120NT �UII,DIi-)- P_�,AG-K t-IN�
47
THIS PLAT
VICINITY
,,,.
A� �T CERIIFICATE OF SURVEYING ACCURACY
STATE OF •.� 1, Joe D. White herebycertify that this
4.. ARKAMAS ; ceY
N0.534 2 a ' plat correctly represents a boundary survey
Q ; 5 _ made by me and boundary markers shown hereon
' srNAnea ; Q actually exist and their location, type and
J
4 material are correctly shown.
o, W
ygL' �ANp�S,.,'
Hate of Execution Joe D. White
Registered Land Surveyor
No. 534, Arkansas
ANa--- CERTIFICATE OF ENGINEERING ACCURACY
S�ATt pjr Z
f A R CA AS Z I, Timothy E. Daters, hereby certify that this
plat correctly represents a plan made by me,
REGISTERED and that the engineering requirements of the
IT R I) F E S S I () N A L Little Rock Subdivision Rules and Regulations
ErGI\EEIt 1
have been complied with.
{
0 NO.5033 'Pfo,
E O t / Hate of Execution Timothy E. Deters
Registered Professional
Engineer No. 5033, Arkansas
CERTIFICATE OF OWNER
We, the undersigned, owners of the real es-
tate shown and described herein, do hereby
certify that we have laid off, platted, and
subdivided, and do hereby lay off, plat, and
subdivide said real estate in accordance with
this plat. -
Hate of Execution rYth ; you[
D.R. Page
Address
Instrument No. S& - '
CERTIFICATE OF FINAL APPROVAL
Pursuant to the Little Rock Subdivision Rules
and Regulations, and all of the conditions of
approval having been completed, this docu-
ment is hereby accepted. This certificate is
hereby executed under the authority of said
Rules and Regulations.
Date of Execution Little Rock Planning
Commission
CERTIFICATE OF RECORDING
This document, number , filed for
record 19 in Plat Book _
Page
L; o O low r5�
I
IAN LL • cQU[N •LUMMINT CO.