Loading...
HomeMy WebLinkAboutS-0126-D Staff AnalysisITEM NO.: 1. S-126-D NAME: Lot 6RR Mabelvale Industrial Park Addition Replat LOCATION: located on the Northwest corner of Mabelvale Pike and Mabelvale Drive Planninc Staff Comments: Provide notification of the abutting property owners of the site including the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than October 10, 2012. The Office of Planning and Development must receive the proof of notice no later than October 19, 2012. Variance/Waivers: None requested. Public Works Conditions: At the time the property is redeveloped or expanded in the future, sidewalks with appropriate handicap ramps are required to be installed along Mabelvale Drive in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required, with easements, for this project. Contact Little Rock Wastewater Utility for additional information. Entergy: No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water- All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of the facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) required that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by Central Arkansas Water. The test results must be sent to Central Arkansas Water's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for the project. Fire Department: Approved as submitted. Item # 1. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Parks and Recreation: No comment received. Planning Division: No comment. Landscape. No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, October 10, 2012. Item 4 1. October 25, 2012 ITEM NO.: 1 FILE NO.: S-126-D NAME: Lot 6RR Mabelvale Industrial Park Addition Replat LOCATION: Located on the Northwest corner of Mabelvale Pike and Mabelvale Drive DEVELOPER: Mid -Ark Roofing Inc Robert Burdett P.O. Box 983 Mabelvale, AR 72103 ENGINEER: McGetrick and McGetrick Engineers P.O. Box 30441 Little Rock, AR 72260 AREA: 4.99 acres CURRENT ZONING: PLANNING DISTRICT: CENSUS TRACT: NUMBER OF LOTS: 1 1-2, Light Industrial 15 — Geyer Springs West 41.03 FT. NEW STREET: 0 LF VARIANCESM/AIVERS REQUESTED: None requested. A. PROPOSAUREQUEST/APPLICANT'S STATEMENT: A preliminary plat for the Mabelvale Industrial Park was approved in August of 1980. A final plat for Lots 1 and 2, 5 and 6 was executed in 1981. A replat of Lot 6 was filed in January of 2009. The final plat and replat for Lot 6 of the Mabelvale Industrial Park Subdivision was filed with a 40-foot platted building line along Mabelvale Pike and a 70-foot platted building line along Mabelvale Drive A variance was approved to allow the 40-foot building line along Mabelvale Pike. The applicant is now requesting to amend the preliminary/final plat to reduce the front yard setback and platted building line along Mabelvale October 25, 2012 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-126-D Drive to 50-feet. The property is zoned 1-2, Light Industrial District. Within this zoning district the front yard building setback is allowed at a minimum of 50-feet. B. EXISTING CONDITIONS: The site is located in an industrial park which has two (2) other businesses. The streets were installed with the initial development of the industrial park but a large portion of the park remains vacant. The Arkansas State Highway Department has a large presence in this area with a maintenance/storage yard located across Mabelvale Pike and an office uses located near the western border also accessing Mabelvale Pike. The multi -story office building housing AHTD is located further southwest at the 1-30/Mablelvale Pike/Baseline Road intersection. Abutting the eastern portion of the industrial park are two (2) single-family homes. Further east is a mobile home parking fronting Mabelvale Pike. South of the industrial park site are commercial properties with frontage on the 1-30 Frontage Road. North of the industrial park site is undeveloped 1-2, Light Industrial zoned property. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received a few informational phone calls from area residents. All abutting property owners and Southwest Little Rock United for Progress were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: At the time the property is redeveloped or expanded, sidewalks with appropriate handicap ramps are required to be installed along Mabelvale Drive in accordance with Section 31-175 of the Little Rock Code and the Master Street Plan. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNIN Wastewater: Sewer main extension required, with easements, for this project. Contact Little Rock Wastewater Utility for additional information. Entergy: No comment received. 2 October 25, 2012 SUBDIVISION ITEM NO.: 1 Cont. FILE NO.: S-126-D Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of the facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) required that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by Central Arkansas Water. The test results must be sent to Central Arkansas Water's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for the project. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Parks and Recreation: No comment received. F. ISSUES/TECHNICAUDESIGN: Plannino Division: No comment. Landscape: No comment. G. SUBDIVISION COMMITTEE COMMENT: (October 4, 2012) The applicant was not present. Staff presented the item stating there were no outstanding technical issues associated with the request in need of addressing prior to the full Commission acting on the request. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. 3 October 25, 2012 SUBDIVISION ITEM NO.: 1 H. ANALYSIS: FILE NO.: S-126-D There were no remaining outstanding technical issues associated with the request in need of addressing raised at the October 4, 2012, Subdivision Committee meeting. The applicant is seeking an amendment to the approved preliminary/final plat for this individual lot to allow a reduction in the platted building line. As noted previously the applicant is requesting to amend the preliminary/final plat to reduce the front yard setback and platted building line along Mabelvale Drive to 50-feet. The property is zoned 1-2, Light Industrial District. Within the 1-2, Light Industrial Zoning District the required front yard building setback is 50-feet. Staff is supportive of the request. The applicant has indicated the modification and reduction to the platted building line is necessary to complete a building expansion proposed for the business located on -site. To staffs knowledge there are no outstanding technical issues associated with the request. Staff does not feel the approval of the amended preliminary/final plat to allow the reduced platted building line, which is in compliance with the zoning district, will adversely impact the development or the area. The applicant will be required to complete a one -lot replat to recognize the amended platted building line STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (OCTOBER 25, 2012) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. There was no further discussion of the item. The chair entertained a motion for approval of the item as presented by staff. The motion carried by a vote of 7 ayes, 0 noes and 4 absent. 4