HomeMy WebLinkAboutS-0102-B Map Staff AnalysisFebruary 12, 1985
SUBDIVISIONS
Item No. 1 - File No. 102-B
NAME:
LOCATION!
DEVELOPER:
First Service Corp.
Pecan Lake East (Revised)
East end of Tall Timber, west
end of Hindman Park
ENGINEER:
Manes, Castin, Massie
& McGetrick
P.O. Box 1035
2501 Willow
N. Little Rock, AR 72115
758-1360
AREA: 34.177 acres NO. OF LOTS: 97 FT. NEW STREET: 3,500
ZONING: "R-2"/"R-3"
PROPOSED USES: Single Family
VARIANCES REQUESTED:
1. Cul-de-sac link on Tall Timber (1,300 feet)
2. Tall Timber Court (850 feet)
A. Site History
Proposals incorporating 21 of these lots for a
preliminary plat approval and a rezoning request from
"R-2" to "R-3" was approved on this property in the
last few months.
B. Existing Conditions
This property is located in an area that has been
developed primarily as single family residential. The
site is currently wooded with mature vegetation and
trees. The 100-year floodplain is apparent on the
northern end.
C. Development Proposal
This is a proposal to subdivide 34.177 acres into 97
lots for single family development. Twenty-one of
these lots were previously approved. 3,500 feet of new
street will be provided. Waivers are requested for
February 12, 1985
SUBDIVISIONS
Item No. 1 - File No. 102-B - Continued
cul-de-sac lengths on Tall Timber Boulevard and Tall
Timber Court, due to the physical constraints on the
site.
D. Engineering Comments
1. Reduce size of intersection of Tall Timber
Boulevard and Tall Timber Court; make a "T"
intersection.
2. Request clarifiction of curb radius on Tall Timber
Boulevard at Lot 84.
3. For those lots that are in the floodplain, place
minimum floor elevations on the plat.
E. Analysis
Staff has no objections to the proposal, provided the
applicant transfer title to Lots A, B and C to the City
before the preliminary is signed. He should also
coordinate. the street names with David Hathcock at
371-4808.
STAFF RECOMMENDATION:
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
It was decided that the applicant should get with
Engineering and work toward resolution of the curve radius
issue and that the applicant would transfer title to the
City for Tracts A, B and C before the final is signed.
Water Works - a 15' easement is required adjacent to the
west and south lines of Lot 8. Utility easements will be
required for service to any lot that does not have frontage
on the right-of-way.
Water Works - 15' easements, 7.5' either side of the
lot lines, will be required between Lots 29 and 30 and
between Lots 64 and 65.
February 12, 1985
SUBDIVISIONS
Item No. 1 - File No. 102-B - Continued
4PLANNING COMMISSION ACTION:
Mr. Chris McGetrick represented the applicant. A neighbor
to the southeast of the site expressed the need for a
stub -out street. Mr. Claude Conley, another abutting
property owner, was concerned about the effect this
development with smaller lots would have on the property
value of homes in Pecan Lake. He was also particularly
concerned about the possibility of a mobile home
development. He was assured that the lots had a minimum of
50' width, but also ranged up to 80' in width, and that no
mobile homes would be placed on the property. A motion for
approval was made and passed by a vote of: 8 ayes, 0 noes,
1 absent and 1 abstention.