Loading...
HomeMy WebLinkAboutS-0098-E Staff AnalysisJuly 26, 1994 ITEM NO.: 4a -- FILE NO.: S-1032 NAME: TRANSPORT INTERNATIONAL POOL -- SITE PLAN REVIEW LOCATION: At the southeast corner of Production Drive and Distribution Road DEVELOPER: ENGINEER: Jimmy Alessi Frank Riggins ALESSI-KEYES CONSTRUCTION THE MEHLBURGER FIRM P. 0. Box 25414 P. O. Box 3837 Little Rock, AR 72221 Little Rock, AR 72203 225-6699 375-5331 AREA: 5.1712 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0 ZONING: I-2 PROPOSED USES: PLANNING DISTRICT: 15 CENSUS TRACT: 41.03 VARIANCES REQUESTED: None STATEMENT OF PROPOSAL: Truck parking and maintenance Development of the 5.1712 acres site is proposed for a storage area for semi -tractor trailer vehicles. Two buildings are proposed to be constructed on the site to service this activity, a maintenance building and an office building. Additionally, parking for 7 passenger vehicles is to be provided. The site is to be surrounded by a 6 foot high chain link fence with 3 strands of barbed wire at the top of the fence. Landscaping will be provided to comply with the landscaping requirements. A portion of the site along the east limits of the site is wooded, and existing trees are planned to be saved where practical. A new curb cut and driveway is proposed to be provided on the north, on Production Drive, with the existing curb cut on the south, on Assembly Court, to be removed. A gate is to be provided at the new driveway. The lot is proposed to be lighted. Stormwater detention is to be provided on -site by way of a basin located along the east property line. A. PROPOSAL RE VEST: Site plan review is requested for a site consisting of 5.1712 acres to be used for a semi -tractor trailer parking facility. Two buildings are proposed on the site: a maintenance building and an office building. The site is to be fenced with chain link facing with barbed wire along the top of the fence. A new driveway is to be provided off July 26, 1994 SUBDIVISION ITEM NO.: 4a (Continued) FILE NO.: S-1032 Production Drive, and is to include a gate. The existing drive off Assembly Court is to be abandoned. Landscaping is to be provided to comply with the requirements, and existing trees along the east extent of the site are to be saved where practical. Stormwater is to be detained on -site in a basin located along the east property line. B. EXISTING CONDITIONS: The site is zoned I-2, with I-2 zoning on all surrounding tracts. The now -vacant United Parcel Service facility stands on the adjacent property to the east. The site is vacant, with approximately one-half of the western main portion of the site being paved. C. ENGINEERING/UTILITY COMMENTS: Public Works relates that an application for a building permit has already been submitted, and that the comments offered in response to that application are applicable. Little Rock Water Works reports no objections. Little Rock Wastewater Utility reports no objections. Arkansas Power and Light Co. will require additional easements, and have delineated the need for a 15 foot wide easement at, basically, the perimeter of the property. Arkansas Louisiana Gas Co. approved the submittal without comment. Southwestern Bell Telephone Co. approved the submittal without comment. The Little Rock Fire Department approved the submittal without comment. Landscape review comments that the full buffer width required along Distribution Drive is 20 feet, with 15 feet being the requirement along Production Drive. Though the proposal is below this requirement, the existing paved areas set aside to be landscaped along Production Drive and Assembly Court make up the difference in area and allow additional plantings and continuous street landscaping. D. ISSUES/LEGAL/TECHNICAL/DESIGN: Section 31-13 of the Subdivision Ordinance requires site plan review for developments "involving the construction of two (2) or more buildings". 2 July 26, 1994 SUBDIVISION ITEM NO • 4a LContinued) FILE NO.: S-1032 All issues have been resolved. E. ANALYSIS• The proposed site is in an industrial park, and landscaping review supports the proposed landscaping proposal; the proposed landscaping is an upgrade for the area and provides perimeter buffering. The plans are complete and there are no outstanding issues. F. STAFF RECOMMENDATIONS: Staff recommends approval of the site plan. SUBDIVISION COMMITTEE COMMENT: (JULY 7, 1994) The applicant, Mr. Jimmy Alessi, was present. Mr. Frank Riggins, with the Mehlburger Firm, as present. Mr. Alessi and Mr. Riggins reviewed with the Committee the scope of the project. Staff reviewed with the Committee and with the applicant the comments contained in the discussion outline. There were no major concerns regarding the plans noted, and the Committee forwarded the item to the Commission for the site plan review. PLANNING COMMISSION ACTION: (JULY 26, 1994) Staff reported that there were no issues to be resolved, that the required submittals were complete and all requirements had been met. The item was included on the consent agenda for approval, and was approved with the vote of 8 ayes, 0 nays, 2 absent, 0 abstentions, and 1 open position. q