Loading...
HomeMy WebLinkAboutS-0065-JJJ ApplicationCIVIL ENGINEERING DIVISION Ivy FINAL PLAT FILING APPROVALS FINAL PLAT NAME: ST. CHARLES LOT 159RR REPLAT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: _ ADDRESSING SPECIALIST REPORT I have reviewed the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. All other requirements for final plat approval have been satisfied. Civil Engineer I/II Date: SURVEYOR REPORT I have reviewed the plat and find that: All requ;�'?/ is for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. 'F_6hate: 8-19-2021 Design Review Engineer/Civil Engineering Manager Date: 2-� 7' � Effective: August 18, 2021