HomeMy WebLinkAboutS-0065-JJJ ApplicationCIVIL ENGINEERING DIVISION Ivy
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: ST. CHARLES LOT 159RR REPLAT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date: _
ADDRESSING SPECIALIST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer I/II Date:
SURVEYOR REPORT
I have reviewed the plat and find that:
All requ;�'?/
is for final plat approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
'F_6hate: 8-19-2021
Design Review Engineer/Civil Engineering Manager
Date: 2-� 7' �
Effective: August 18, 2021