Loading...
HomeMy WebLinkAboutS-1715-D Application� Y5 p i 'Y yp py yy k 1� rr It as Y� Cp� f 11 9 Y y 5 C 9 4 7 F a E t p 5 �� i E F G� 6� Y F� ■ y� 9 $ 6 Ne _ J M _ \ I ML olajaxk \ •''9 -` RI(�/If?R�QL9 Wco.. P . LOT 2 PI NNAQF va1Li1 \ _ PINNAQFNAl MN £ S 4 CENTRAL ARKANSAS FINAL PEAT THE VMkGE AT WN CREEK PHASE 26 a m m m N I N , PULASKI COUNTY, LnnE ROCK, APKANSAS A RESIDENTIAL SLIBI)TWSION BY: ISM CREEK DMOPWNT LLC GNR ©PQytSEpuq Y suRVFY1NO Y .ITf p{RioN zAbn/Ime a4 ➢VD PREPARED BY AND WHEN RECORDED MAIL TO: H. Bradley Walker The Catlett Law Firm, PLC 323 Center Street, Suite 1800 Little Rock, AR 72201 (501) 372-2121 11111111111111111111111111111111111111 2018036329 PRESENTED: 06-11-2018 04:01:02 PM RECORDED: 06-11-2018 04:09:33 PM In Official Records of Larry Crane circuit/county Clerk PULASKI CO, AR FEE $35.00 �ti���1rl�ruunrrrr C!R LU Ln rCO U Vtil�„� SPACE ABOVE THIS LINE FOR RECORDER'S USE PLAT AND BILL OF ASSURANCE TO THE PROPERTY TO BE KNOWN AS The Village at Ison Creek Subdivision Phase 2B AN ADDITION TO THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS WHEREAS, Ison Creek Development, LLC, an Arkansas Limited Liability Corporation, (hereinafter the "Allotter"), is the owner of the following described land lying in the City of Little Rock, County of Pulaski, State of Arkansas, to -wit: That certain tract or parcel of land more fully described in Exhibit "A" attached hereto and made a part hereof for all purposes. And, Whereas, it is desirable that the above -described property be subdivided as reflected upon a plat as herein after described, subject to the protective covenants herein contained and Architectural Control Guidelines filed in conjunction herewith. Now, Therefore, the Allotter, for and in consideration of the benefits accruing to it, its successors and assigns, which benefits are acknowledged to be of value, has caused said track of land to be surveyed by Central Arkansas Engineering PLLC., Registered Professional Engineers, and a plat thereof made which is identified as The Village at Ison Creek Subdivision Phase 2B, an addition to the city of Little Rock, dated , and by the signature of said engineer and the Allotter, and bearing certificate of approval executed by the Little Rock Planning Commission and was filed contemporaneously herewith in the office of the Circuit Clerk and ex-officio recorder of Pulaski County, Arkansas, as instrument number in Plat Book , page , and does hereby make this Bill of Assurance. an c o 3& 3 3 p Allotter hereby donates and dedicates to the public an easement on, over, and under the streets on said plat to be used as a public street. In addition to said street, there are shown on said The Village at Ison Creek Subdivision Bill of Assurance Page I of 5 plat certain easements for drainage and utilities which Allotter hereby donates and dedicates to and for the use by public utilities, the same being, without limiting generality to the foregoing, cable TV, electric power, gas, telephone, water and sewer, with the right here by granted to the persons, firms or corporations engaged in the supplying of such utilities to use and occupy such easements, and to have free ingress thereto and egress therefrom for the installations, maintenance, repair, and replacement of such utility services as necessary to serve the property within the plat. The filing of this Bill of Assurance and Plat shall be a valid and complete delivery and dedication of the streets and easements subject to the limitations herein set forth. The lands embraced in said plat shall forever be known as The Village at Ison Creek Subdivision Phase 2B, an addition to the City of Little Rock, and any and every deed of conveyance of any lot in such addition describing the same by the number shown on said plat shall always be deemed a sufficient description thereof. BE IT KNOWN THAT, All of said land as shown on the said Plat and any interest therein shall be held, owned and conveyed subject to and in conformity with the following covenants, restrictions, conditions and provisions, to -wit: 1. LAND USE AND BUILDING TYPE. The lands herein platted shall be held, owned and used only as residential building sites, and no structures shall be erected, altered, placed or permitted to remain on any of the residential building plats other than a single detached single family dwelling, together with such incidental and related structures as garages or other outbuildings incidental to the residential use of said plots as a distinguished suburban residential area. 2. MINIMUM PRINCIPAL DWELLING SIZE. The square foot area of the principal residential structure on each building plot shall be not less than 2200 square feet for one story and 2500 square feet for multistory of finished, heated living area, exclusive of porches, patios, carports, garages, breezeways, storage areas or related outbuildings. 3. LOT AREA AND BUILDING LOCATION. No residence shall be located on any lot nearer to the front lot line or nearer to the side street line than the minimum building setback lines shown on the recorded Plat; providing that, the setback requirements may be modified if such modifications are approved by the Allotter and the Little Rock Planning Commission or the Little Rock Board of Adjustment, or such other regulatory agency as may succeed to their function. 4. ARCHITECTURAL CONTROL. No construction, landscaping or clearing shall be undertaken on any lot in The Village at Ison Creek Subdivision Phase 2B unless and until all plans, elevations, and materials for such construction shall be first submitted to the Allotter for consideration and the Allotter has approved such plans, elevations, and materials. The process of submission and approval shall be undertaken in accordance with the Architectural Control Guidelines in effect from time to time. From the date recorded the Architectural Control Guidelines are incorporated herein as if set forth word for word and subject to revision as set forth therein. The Allotter, or an Architectural Control Committee if established by the Allotter, may, in its sole discretion, disapprove of any submissions, make suggested revisions for resubmittal, or take other actions to develop The Village at Ison Creek Subdivision Phase 2B as a coordinated subdivision consisting of residences of similar size and compatible architectural style so as to create a neighborhood with common and complementary architectural. The party responsible for Architectural Control may establish reasonable fines for violations which may accrue daily until a violation is corrected. The Village at Ison Creek Subdivision Bill of Assurance Page 2 of 5 Under no circumstances shall the Allotter or the Architectural Control Committee or their agents, employees, members or directors ever be liable to any person for any action or failure to act, for negligence, mistakes, misfeasance or malfeasance in connection with the performance of any of the duties of Architectural Control Guidelines or this Bill of Assurance. 5. BUILDING SITE AREA. No lot shall in any manner be subdivided, split or reduced in size without the prior written and recorded consent of Allotter; but each of said building plots as platted and shown on the attached plat shall be devoted strictly for use as a single whole residential building plot. 6. MIMIMUM FINISH FLOOR ELEVATIONS. The Plat indicates for certain lots in the addition a minimum finish floor elevation. This elevation indicates the lowest floor elevation which can be built on said lot. 7. EASEMENTS. Easement for the installation, maintenance, repair, and replacement of utilities services and drainage have been reserved, said easements being of various widths, reference being made to the recorded plat for a more specific description of the widths, utility benefited and location. The agents, servants, and employees of any parties giving any utility service shall have the right of ingress to and from and in, over and across said easements, and no improvement, trees, incinerators, fences, or other hindrances shall be placed upon such easement areas that will interfere with the operation and maintenance of such utility services. In the event such improvements, trees, fences or other hindrances are grown, built, or maintained within the areas of such easements, no utility shall be liable for the destruction or repair of same. No Exposed overhead wires and cables for utility services are permitted in this addition. All electric power facilities shall be underground. Any alteration or lowering of the surface grade of the ground in any easement and the area immediately adjoining such easement are prohibited, which would result in there being less than thirty inches (30") of clearance vertically or thirty-six inches (36") horizontally between the surface grade and the underground electric cables and conductors supplying electric power and services. 8. MAINTENANCE OF COMMON AREAS. All common areas in The Village at Ison Creek Subdivision Phase 2B and improvements therein, including greenbelts, islands, medians, and tracts of land set aside and reserved for drainage, buffer, park and aesthetic purposes shall be maintained by The Village at Ison Creek Property Owners' Multipurpose Improvement District No. 2015-318 ofLittleRock ("District") at its sole cost. All such areas shall be acquired, dedicated and donated by the Allotter to the District and will be reserved for the use and benefit of owners of lots within The Village at Ison Creek Subdivision Phase 2B and annexed thereto. 9. DUTY OF MAINTENANCE. All Owners and occupants (including lessees, contract buyers, builders, residents and construction workers) of any part of a lot shall jointly and severally have the duty and responsibility to maintain any improvement on the lots as further set forth in the Architectural Control Guidelines and the procedures set forth therein. 10. PROPERTY LINES AND BOUNDARIES. Iron pins have been set on all plot corners and points of curve and in the event of minor discrepancies between dimensions or distances as shown on the attached plat and the actual dimensions or distances as disclosed by the established pins, the pins as set shall control. 11. ANNEXATION OF ADDITIONAL LANDS. Allotter reserves the right, but shall not be obligated, to cause additional portions of adjacent property to be subject to the terns of this The Village at Ison Creek Subdivision Bill of Assurance Page 3 of 5 Bill of Assurance (with certain changes affecting such additional portions.) Allotter may from time to time, annex additional lands to the property described on Exhibit A, and thereby subject the same to the within restrictions (with certain changes as Declarant may determine) and grant access to public roadway by the execution and filing for recordation in the Office of the Circuit Clerk and Ex-offico Recorder of Pulaski County, Arkansas of an instrument expressly stating intentions so to annex and describing such additional ands to be so annexed and the covenants and restrictions applicable thereto. Each property owner, by the act of becoming such, shall have taken to acknowledged and agreed that such property may be so annexed to the Addition. 12. ENFORCEMENT. Each of the owners of the residential plots in this addition shall be entitled to enforce compliance with all of the covenants, conditions and restrictions herein contained or referenced, and it being recognized that monetary damages for any violation would not be an adequate remedy, proceedings to enforce the provisions hereof may be prosecuted by appropriate proceedings in equity against the person or persons violating or attempting to violate such covenants or restrictions, and no Bond shall be required as a condition to the entrance of either a mandatory or restrictive injunction; and in addition, damages for such violation may be recovered if allowable. The prevailing party shall be entitled to a reasonable attorneys' fees and cost. 13. DURRATION, ALTERATION, MODIFICATION OR RENEWAL. The covenants, provisions and restrictions herein set forth may be amended, modified, extended, changed or cancelled, in whole or in part, only by a written instrument examined and recorded by the Allotter, until such time as all of the lots in this subdivision have initially been sold and conveyed by Allotter, at which time any modification, amendment or change shall be executed and recorded by the owners of not less than 60% in number of the residential plots in this addition. Each of the covenants, provisions and restrictions contained herein shall remain in full force and effect for a period of 25 years from the date hereof, and shall be automatically renewed for successive periods of 10 years each unless cancelled, modified or amended as hereinbefore set forth. 14. SEPARABILITY. The invalidation of any restriction of covenant set forth herein, or any part thereof, by any order, judgment or decree of any court, or otherwise, shall not invalidate or affect any of the other covenants or restrictions contained herein, but all such shall remain in full force and effect. 15. LOT 49 EXCEPTION. Notwithstanding any of the foregoing, Lot 49 shall not be subject to any restrictions or Architectural Control enforcement by the Allotter or owners of property within The Village at Ison Creek Subdivision. In witness whereof, the said Allotter has caused its managing member, dully authorized to execute this Bill of Assurance on this // v day of \I �i & , 2018. RG,,�ym c:-Ay fcr incluslon of rninlmurn stmdaf S Mquireli by the City of U �a Hack su'r`ivisio�z r�iatians. Bii1 of mrr=ance provisions asta-'-� shed bl/;"o dNe ;r may e-.cof-j urn rqd, atio ns of th9 !_Sty subdivision and zoning ordinanm C41- fp City of i_' Rack Planning Conunissiw Ison Creek Development, LLC. By: Keith Win Managing Member The Village at Ison Creek Subdivision Bill of Assurance Page 4 of 5 ACKNOWLEDGEMENT State of Arkansas County of Pulaski On this day personally appeared before the undersigned, a notary public with and for the County and State aforesaid, duly qualified, commissioned and acting, the within named Keith Wingfield, to me personally well know, who stated that he was the managing member of Ison Creek Development, LLC. an Arkansas Limited Liability Corporation, and stated and acknowledged that he was duly authorized in his respective capacities to execute the foregoing instrument in the name and behalf of said corporation, and further sated and acknowledged that he had signed, executed and delivered said foregoing instrument for the consideration and purposes therein mentioned and set forth. In Witness my hand and official seal on this iLKday of , 2018. My commission xi7101IFty TMiE HOBBY SALINE COUNTY Notary Public PUBLIC • ARKANSAS ission Expires JUIy 07. 2019mission No. 12372214w,_. _.�-- The Village at Ison Creek Subdivision Bill of Assurance Page 5 of 5 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: 7E VILLAGE AT ISOM CREEK PHASE 2B INSPECTOR REPORT I have made a final inspection cif the improvements and find that: All improve ents shown on construction drawings for the development are constructed and in conformance with City req irements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. I have reviewed the plat and I have reviewed the plat and Engineering Specialist Date: that the street names and street configuration are acceptable. Date:./21 h'? that: Addressing Specialist All streetligh installation, striping, signage and other traffic improvements have been constructed and are in conformance ith City requirements/standards. street igns should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved -en sneering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. r --s-s--- �f" i -' Traffic Engineer Date: '5-h') f 0 6" ekerC _r;;FA j-.ems I have reviewed the file for The main Financial As -built c All other SURVEYOR REPORT and find that: bond has been submitted and it is the proper type and amount. = for the uncompleted improvements listed above has been received. plans in electronic form have been submitted. vents for final plat approval have been satisfied. Q Civil Engineer I/II Date: (.1 1 V I have reviewed the plat and hi nd that: All requirem n is for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requiremi Design Review Engineer/Civil Effective: May 21, 2018 for filing this final plat have been scat -is led -" Date: (9� veering Manager Date: Is `. James, Donna From: Raymond Hickey <caengr@sbcglobal.net> Sent: Tuesday, May 15, 2018 3:28 PM To: James, Donna Subject: FW: Final Plat Village at Ison Creek Phase 2B Attachments: 1-FINAL PLAT PHASE 2B.pdf From: Raymond Hickey [mailto:caengr@sbcglobal.net] Sent: Tuesday, May 15, 2018 3:15 PM To:'Floriani, Vince'<VFloria ni@littlerock.gov>; 'djames@littlerock.org'<djames@littlerock.org> Cc:'Keith Wingfield' <Keith@riverrockbuilders.net> Subject: Final Plat Village at Ison Creek Phase 2B Attached is the final plat of The Village at Ison Creek Phase 213, for your approval. Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 James, Donna From: Raymond Hickey <caengr@sbcglobal.net> Sent: Wednesday, May 30, 2018 11:43 AM To: James, Donna Cc: 'Keith Wingfield' Subject: FW: Final Plat The Village at Ison Creek Phase 2B Attachments: 1-FINAL PLAT PHASE 2B.PDF From: GURLEY, JOHN CURTIS [mailto:JG0866@att.com] Sent: Wednesday, May 16, 2018 8:10 AM To: caengr@sbcglobal.net Subject: Final Plat The Village at Ison Creek Phase 2B AT&T approves the final plat of the Village at Ison Creek Phase 2B. John Gurley ATT MGR OSP Engineering Little Rock, AR 501-373-3303 James, Donna From: Raymond Hickey <caengr@sbcglobal.net> Sent: Wednesday, May 30, 2018 11:43 AM To: James, Donna Cc: 'Keith Wingfield' Subject: FW: Final Plat The Village at Ison Creek Phase 2B From: NEUMEIER, BERNARD [mailto:BNEUMEI@entergy.com] Sent: Tuesday, May 15, 2018 4:06 PM To: Raymond Hickey <caengr@sbcglobal.net> Cc: 'Keith Wingfield' <Keith@riverrockbuilders.net>; Steven. Hotho@I rwu.com;'Fuentes, Kenneth W' <kenneth.fuentes@centerpointenergy.com>; 'J0NATHAN LONG' <JONATHAN.LONG @CARKW.COM>; 'GURLEY, JOHN CURTIS' <JG0866@att.com> Subject: RE: Final Plat The Village at Ison Creek Phase 2B Entergy approves of the final plat. There are no conflicts with existing, electrical facilities that we can see, and service can be provided with the facilities we have in the area. Thanks, ,Betnatd C{!ewnelelc Region Engineering Supervisor Entergy Arkansas, Inc. 8-721-5158 501-954-5158 501-954-5175 fax 501-733-0045 cell From: Raymond Hickey [ma ilto:caengrCabsbcglobal.net] Sent: Tuesday, May 15, 2018 3:16 PM To: Steven.Hotho@Irwu.com; 'Fuentes, Kenneth W'; 'JONATHAN LONG'; 'GURLEY, JOHN CURTIS'; NEUMEIER, BERNARD Cc: 'Keith Wingfield' Subject: Final Plat The Village at Ison Creek Phase 2B EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way. DO NOT provide your user ID or password. Attached is a final plat of the Village at Ison Creek Phase 2B for your approval. Thanks, Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 James, Donna From: Raymond Hickey <caengr@sbcglobal.net> Sent: Wednesday, May 30, 2018 11:40 AM To: James, Donna Subject: FW: Final Plat The Village at Ison Creek Phase 2B Attachments: 1-FINAL PLAT PHASE 2B.PDF From: Raymond Hickey [mailto:caengr@sbcglobal.net] Sent: Wednesday, May 30, 2018 11:38 AM To:'djames@littlerock.org' <djames@littlerock.org>;'Keith Wingfield' <Keith@rive rrockbuilders.net> Subject: FW: Final Plat The Village at Ison Creek Phase 2B From: Fuentes, Kenneth W [maiIto: kenneth.fuentes center o i ntene rRy.com] Sent: Friday, May 18, 2018 2:37 PM To: Raymond Hickey <caengr@sbcgIobal.net> Cc:'Keith Wingfield' <Keith@riverrockbuilders.net> Subject: RE: Final Plat The Village at Ison Creek Phase 2B CenterPoint approves of the final plat. Thanks, Kenneth W. Fuentes, El Engineer II Southern Gas Operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Office:501-377-4606 1 Fax:501-377-4733 1 Mobile:501-516-9585 ke n neth. Fuentes,a centern of me ner9v. com Energy From: NEUMEIER, BERNARD fmailto:BNEUMEI@ente[g.com] Sent: Tuesday, May 15, 2018 4:06 PM To: Raymond Hickey <caengr@sbcgIobal.net> Cc: 'Keith Wingfield' <Keith@riverrockbuilders.net>; Steven.Hotho@Irwu.com; Fuentes, Kenneth W <kenneth.fuentes@centerpointenergV.com>; 'JONATHAN LONG' <JONATHAN.LONG2« CARKW.COM>; 'GURLEY, JOHN CURTIS' <JG0866@att.com> Subject: [External Email] RE: Final Plat The Village at Ison Creek Phase 2B Entergy approves of the final plat. There are no conflicts with existing, electrical facilities that we can see, and service can be provided with the facilities we have in the area. Thanks, ,�6etnatd C rewneiet Region Engineering Supervisor Entergy Arkansas, Inc. 8-721-5158 501-954-5158 501-954-5175 fax 501-733-0045 cell From: Raymond Hickey [mailto:caengr@sbr-global,net] Sent: Tuesday, May 15, 2018 3:16 PM To: Steven. H othoOg lrwu.com; 'Fuentes, Kenneth W'; 'JONATHAN LONG'; 'GURLEY, JOHN CURTIS'; NEUMEIER, BERNARD Cc: 'Keith Wingfield' Subject: Final Plat The Village at Ison Creek Phase 2B EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way DO NOT provide your user ID or password. Attached is a final plat of the Village at Ison Creek Phase 2B for your approval. Thanks, Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources. ***** 2 James, Donna From: Raymond Hickey <caengr@sbcglobal.net> Sent: Wednesday, May 30, 2018 11:40 AM To: James, Donna Subject: FW: Final Plat The Village at Ison Creek Phase 2B Attachments: 1-FINAL PLAT PHASE 2B.pdf From: Raymond Hickey [mailto:caengr@sbcglobal.net] Sent: Wednesday, May 30, 2018 11:37 AM To: 'djames@littlerock.org' <djames@littlerock.org> Cc: 'Keith Wingfield' <Keith@riverrockbuilders.net> Subject: FW: Final Plat The Village at Ison Creek Phase 2B From: Vincent Hotho [Mai#to_5teyen.Hotho@!lrwra.com] Sent: Tuesday, May 29, 2018 2:21 PM To: James, Donna <DJames@Iittlerock.goy> Cc: Raymond Hickey <caengr@sbcglobal.net> Subject: FW: Final Plat The Village at Ison Creek Phase 2B We have reviewed this revision and have no objection Mince Hotho Engineering Program Supervisor 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www Irwra com LITTLE ROCK Water Reclamation A&or y ONE WATER ONQ PUYURi. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information; and is intended only for the individual named. From: Raymond Hickey [mailto:caengr@sbc,globalnet] Sent: Tuesday, May 15, 2018 3:16 PM To: Vincent Hotho <Steven.Hotho@irwra.com>; 'Fuentes, Kenneth W'<kenneth.fuentes@centerpointenergy.com>; 'JONATHAN LONG' <JONATHAN.LONG@CARK_W,COM>;'GURLEY, JOHN CURTIS' <JG0866@att.com>;'BERNARD NEUMEIER' <Brieumei@enter yg com> Cc: 'Keith Wingfield' <Keith riverrockbuilders.net> Subject: Final Plat The Village at Ison Creek Phase 213 Attached is a final plat of the Village at Ison Creek Phase 2B for your approval. Thanks, Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 James, Donna From: Vincent Hotho <Steven.Hotho@Irwra.com> Sent: Tuesday, May 29, 2018 2:21 PM To: James, Donna Cc: Raymond Hickey Subject: FW: Final Plat The Village at Ison Creek Phase 2B Attachments: 1-FINAL PLAT PHASE 2B.pdf We have reviewed this revision and have no objection. Vince Hotho Engineering Program Supervisor 11 Clearwater Dr. Little Rock, AR 72204 Office: (501)688-1452 www.Irwra.com LITTLE ROCK Auto Reclamation WATER UIY�. V�A'ER. UN! FUTURiB. This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error, please notify the sender. This message may contain confidential information, and is intended only for the individual named. From: Raymond Hickey [mailto:caengr@sbcglobal.net] Sent: Tuesday, May 15, 2018 3:16 PM To: Vincent Hotho <Steven.Hotho@lrwra.com>; 'Fuentes, Kenneth W'<kenneth.fuentes@centerpointenergy.com>; 'JONATHAN LONG' <JONATHAN.LONG @CARKW.COM>; 'GURLEY, JOHN CURTIS' <JG0866@att.com>; 'BERNARD NEUMEIER' <Bneumei@entergy.com> Cc: 'Keith Wingfield' <Keith@riverrockbuilders.net> Subject: Final Plat The Village at Ison Creek Phase 2B Attached is a final plat of the Village at Ison Creek Phase 2B for your approval. Thanks, Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 James, Donna From: Floriani, Vince Sent: Tuesday, May 22, 2018 2:05 PM To: Raymond Hickey Cc: James, Donna Subject: Final Plat Village at Ison Creek Phase 2B Ray, From the site inspection for approval of the final plat, staff has the following comments: 1. A stormwater manhole cover within this phase is missing and should be replaced; 2. The object markers at the end of Ironwood Drive are not installed. When these items are addressed, staff can give approval of the final plat. Thanks, Vince Floriani, P.E. Little Rock Public Works -Civil Engineering 701 W. Markham St. Little Rock, Arkansas 72201 501-371-4817 James, Donna From: Jonathan Long <Jonathan.Long@carkw.com> Sent: Wednesday, May 30, 2018 10:01 AM To: Raymond Hickey Cc: James, Donna Subject: FW: Final Plat The Village at Ison Creek Phase 213 From: Jonathan Long Sent: Wednesday, May 23, 2018 3:04 PM To: Raymond Hickey Subject: RE: Final Plat The Village at Ison Creek Phase 2B Approved From: Raymond Hickey [n7ailto:caengr@sbcalobal.net] Sent: Tuesday, May 15, 2018 3:16 PM To: Steven.Hotho@Irwu.com; 'Fuentes, Kenneth W'; Jonathan Long; 'GURLEY, JOHN CURTIS'; 'BERNARD NEUMEIER' Cc: 'Keith Wingfield' Subject: Final Plat The Village at Ison Creek Phase 2B Attached is a final plat of the Village at Ison Creek Phase 213 for your approval. Thanks, Raymond Hickey P.E., P.L.S. Central Arkansas Engineering PLLC 1012 Autumn Rd. Ste . 2 Little Rock, AR. 72211 1