Loading...
HomeMy WebLinkAboutS-1714 ApplicationEt City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 DATE: October 7, 2013 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning NAME: Coburn Land and Leasing, LLC Subdivision Site Plan Review TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan Review FILE NUMBER: S-1714 LOCATION: Arch Street Pike Little Rock Fire Department Public Works: Engineering, Traffic (2) Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, �K— Donna mes, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY October 21, 2013. _ Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. By: —g r )V�D MIEI F*91 4" FXC.X I.1'i Enclosure PID City Limits NOT ZONED y, =ROSEPOINT7V.)_ 3! THIS SITE I SON:RD 0 El f < 0 19 to0 3:_ 2 Lu 0 Q RAUCH RD G cq 4 e Y RAUGH RO El .59 Lu af Of LLI L11 91 0 WILLOWSPRINGSRD aTl Area Zoning Case- S-1714 Location- Arch Street Pike Ward: N/A P D: 14 CT 40.06 TRS: TlS R12W8 N A 0 225450 900 Feet a b P t, e S-1714 0 ARCH STREET PIKE 0 SITE PLAN REVIEW City of Little Rock L�mtDepartment of Planning and Development Planning 723 West Markham Street Zoning and Uttle Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 November 15, 2013 Coburn Land and Leasing 11850 Arch Street Little Rock, AR 72206 Re: Coburn Land and Leasing, LLC Subdivision Site Plan Review (S- 1714), located at 11850 Arch Street Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on November 14, 2013: X Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. Deferred to the Other: Meeting. If you have any questions please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator Et City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 DATE: October 7, 2013 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning NAME: Coburn Land and Leasing, LLC Subdivision Site Plan Review TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan T2 avi ew FILE NUMBER: S-1714 LOCATION: Arch Street Pike Little Rock Fire Department Public Works: Engineering, Traffic (2) Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Donna imes, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY October 21, 2013. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. Comments: du Lo 1 2- A4-1- le v m k-t-,aves 6uf S Et City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision DATE: October 7, 2013 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning NAME: Coburn Land and Leasing, LLC Subdivision Site Plan Review TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan Peview FILE NUMBER: S-1714 LOCATION: Arch Street Pike 1,1111e Rock Fire Department Public Works: Engineering, Traffic (2) Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Donna mes, AICP Subdivision Administrator (Please resEopd below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY October 21, 2013. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of IO feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. ■ Cammen K�� By: Enclosure 11 \ _ •--fin N Et City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 DATE: October 7, 2013 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning NAME: Coburn Land and Leasing, LLC Subdivision Site Plan Review TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan Review FILE NUMBER: S-1714 LOCATION: Arch Street Pike Little Rock Fire Department Public Works: Engineering, Traffic (2) Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18 2013. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Donna mes, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY October 212013. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. Comments: By: Enclosure City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: October 8, 2013 TO: Southwest Little Rock United for Progress ATTENTION: Ms. Pat Gee ADDRESS: 8409 Dowan Drive Little Rock AR 72209 REQUEST: Coburn Land and Leasing LLC Subdivision Site Plan Review S-1714 . a request to recognize a new buildinq that has been constructed on the property to be used for warehouse space. GENERAL LOCATION OR ADDRESS: 11850 Arch Street OWNED BY/APPLICANT: Coburn Land and NOTICE IS HEREBY GIVEN THAT an application for a Site Plan Review of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission in the Little Rock Board of Directors Chambers, second floor, City Hall, 500 West Markham Street, on November 14, 2013 at 4:00 P.M. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development 05/ 14/09 VARIANCE REQUEST FORM Date Filed i d [ -1 113 Site Plan Namex Usk ��"Engineer: -�CA &,tl Owner: Address: Address: � W9) t,1L1,-- Mij, A Variance(s) Requested: (1) Ch. and Section of Subdivision and Development Code variance is requested: Description: (2) Ch. and Section of Subdivision and Development Code variance is requested: (3)Ch. and Section of Subdivision and Development Code variance is requested: _ Justification- Owner/Agent's Signature: PLANNING BOARD ACTION: Approval( ) Date Denial ( ) Date Basis for Decision; 05/14/09 INFORMATION SHEET FOR SITE PLAN REVIEWS DATE 10 - 1- NAME: LOCATION: I I R SO !TyC,� S-krec+ LJ , Ag %Z,2-06 BV(Jl q DEVELOPER: cakuvvx, i-av c STREET ADDRESS I (8 50 Ryct, CITY/STATE/ZIP L 1 ` Z E-MAIL ADDRESS `i�ne S Ce YIGt 111na In C(o1'st�-fJ1P Vl e TELEPHONE NO. - -3 7,-2- ` 3 4-33 ENGINEER: _3 ) ortyA � � STREET ADDRESS a Ogc� D CITY/STATE/ZIP e 1t s let' . i&O-�'sa-� -2�7- a � 5 E-MAIL ADDRESS TELEPHONE NO. ZRO 53 AREA NUMBER OF LOTS FT. NEW STREET ZONING VARIANCES REQUESTED YES NO PROPOSED USES 05/14/09 AFFIDAVIT I hereby certify that I have notified all the property owners abutting the above property that subject property is being considered for Site Plan Review and that a Public Hearing will be held by the Pulaski County Planning Board at the time and place described above. Applicant (owner or authorized agent) (Name) In (Date) ro 05/ 14/09 Pulaski County Site Plan Checklist PLANNING AND DEVELOPMENT 3200 BROWN STREET LITTLE ROCK, AR 72204 501-340-8260 DATE: 16 - r I DEVELOPMENT: LOCATION: (g o �'►V Pe� ( -7z 7-06 l `r ENGINEER/SURVEYOR: PjY O CA< u trcJ e 1 � l C] Vl ] � by-() d le5 PLANNING JURISDICTION: Van McClendon Planning & Development Director The site plan shall indicate the following information: 1) 6.3 A. LETTER OF APPLICATION 2) 15 COPIES OF THE PROPOSED SITE PLAN 3) 6.3 B. PROPOSED NAME OF THE DEVELOPMENT 4) 6.3 C. NAME AND ADDRESS OF OWNER OF RECORD 5) 6.3 D. SOURCE OF TITLE 6) 6.3 E. NAME AND ADDRESS OF DEVELOPER 7) 6.3 F. DATE OF SURVEY, NORTH POINT, GRAPHIC SCALE AND TWO LAND CORNERS AND STATE PLANE COORDINATES FOR AT LEAST TWO POINTS 8) 6.3 G. SEAL AND SIGNATURE OF A PROFESSIONAL LAND SURVEYOR 9) 6.3 H. SEAL AND SIGNATURE OF A PROFESSIONAL ENGINEER (WHEN REQUIRED) 10) 6.31. LOCATION OF PLAT/TRACT BY LEGAL DESCRIPTION GIVING ACREAGE 11) 6.3 J. VICINITY MAP 12) 6.3 K. BOUNDARY LINES OF TRACT WITH EXACT DIMENSIONS 13) 6.3 L. CONTOURS OF NOT MORE THAN FOUR (4) FEET 14) 6.3 M. NATURAL FEATURES 15) 6.3 N. WATER COURSES ENTERING AND LEAVING THE TRACT 16) 6.30. CULTURAL FEATURES 05/ 14/09 17) 6.3. P. NAMES OF RECORDED ABUTTING SUBDIVISIONS 18) 6.3 Q. NAMES OF ABUTTING OWNERS OF UN -SUBDIVIDED PROPERTY 19) 6.3 R. ZONING DISTRICTS, IF APPLICABLE 20) 6.3 S. A SUMMARY OF THE PROPOSED DEVELPOMENT 21) 6.3 T. EXISTING COVENANTS AND RESTRICTIONS 22) 6.3 U. SOURCE OF WATER SUPPLY 23) 6.3 V. PROVISIONS FOR SEWER DISPOSAL, DRAINAGE AND FLOOD CONTROL 24) 6.3 W. LETTERS OF APPROVAL FROM GOVERNMENTS, UTILITIES, ETC. 25) 6.3 X. STORM DRAINAGE PLAN 26) 6.3 Y. OTHER INFORMATION AS REQUIRED 27) 6.4 A. SITE SUITABILITY 28) 6.4 B. La-b. ADDITIONAL DWELLING UNITS, SETBACKS AND PARKING 29) 6.4 B.2.a-b, DUPLEX, TRI-PLEX AND QUADROPLEX, SETBACKS AND PARKING 30) 6.4 B.3.a-b. MULTI -FAMILY, SETBACKS AND PARKING 31) 6.4 B.4.a-b. NON-RESIDENTIAL DEVELOPMENT, SETBACKS AND PARKING 32) 6.4 B.S. MEETS STANDARDS OF AMERCIAN WITH DISABILITIES ACT 33) 6.5 MULTIPLE BUILDING LOTS 34) 6.6 SETBACKS ON UN -PLATTED PROPERTY 35) 8.1 DEVELOPMENT IN WATERSHED OF PUBLIC WATER SUPPLY 36) 8.2 A-C WASTEWATER DISCHARGE PLAN 37) 8.3 STORMWATER DISCHARGE PLAN 38) 8.4 A-G PERFORMANCE STANDARDSBMP'S USED 39) 8.7 A-B ADDITIONAL PLAT AND SITE PLAN APPLICATION REQUIREMENTS 45.) 8.8 NPDES REQUIREMENTS 46.) 8.9A-C UNDISTURBED AREAS 47.) _8.10A-B CONSTRUCTION ON VERY HIGH SLOPES 48) FEES PAID 05/14/09 AFFIDAVIT I, certify by my signature below that I hereby authorize C�.1 to act as my agent regarding the CtAnnh'( cli ('A/L 7Ra W of the below described property. Property described as: of Title Holder (0-�-13 Date Little Rock Wastewater Comments Project Number S-1501-F Project Name Project Type Dassault Falcon Subdivision Site Plan Review Project Number S-1705-A Project Name Project Type Haw Branch Single Family Preliminary Plat Project Number S-1713-A Project Name Project Type Stagecoach Baseline Preliminary Plat Commercial Project Number S-1714 Project Name Project Type Coburn Land and Leasing Subdivision Site Plan Review Project Number S-1715 Project Name Project Type The Village at Isom Creek Single Family Preliminary Plat Project Number S-1716 Project Name Project Type Huerta Addition Single Family Preliminary Plat Project Number S-878-D Project Name Project Type Mapco John Barrow Subdivision Site Plan Review Project Number Z-5228-D Project Name Project Type Big Rock Mini Golf & Fun Conditional Use Permit Park Project Number Z-6015-A Project Name Project Type Arkansas Systems Tract 4 Planned Commercial Development Comment Made Sewer available to this project. Comment Made Outside Service Boundary, no comment. Comment Made Sewer available to this project. Comment Made Outside Service Boundary, no comment. Comment Made Sewer main extension required with easements for this project. Comment Made Outside Service Boundary, no comment. Comment Made Sewer available to this project. Comment Made Sewer available to this project. Comment Made Sewer available to this project. Friday, October 11, 2013 Page 1 of 2 Project Number Z-6973-F Project Name Project Type The Village at Colonel Planned Commercial Development Glenn Lot 4 Project Number Z-7919-E Project Name Project Type Rock City Marina and Yacht Planned Commercial Development Club Project Number Z-8891 Project Name Project Type Watson Planned Residential Development Project Number Z-8892 Project Name Project Type Gray Planned Residential Development Comment Made Sewer main extension required with easements for this project. Comment Made Sewer available to this project. 54" and 601' Outfall located in Vicinity of Project. No construction allowed with Easement of Existing Outfall. Comment Made Sewer available to this project. Comment Made Sewer available to this project. Friday, October 11, 2013 Page 2 of 2 Public Works Review Comments Planning Commission Board of Adjustment Agenda Date: 11-14-13 Z File Number S-1501-F Dassault Falcom Subd Site Plan Review 3801 E. IOth St 1 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 2 Storm water detention ordinance applies to this property. 3 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 4 Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. Z File Number S-1705-A Haw Branch Preliminary Plat 13805 Crystal Valley Road 1 Crystal Valley Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. 2 The show proposed driveway location(s). 3 Contact Pulaski County Planning Department for conditions for developing property in the floodplain. 4 The minimum Finish Floor elevation of at least 1 ft above the base flood elevation is required to be shown on plat and grading plans. Z File Number S-1713-A Stagecoach -Baseline Rev Pre Plat NEC Baseline & Stagecoach Rd I The access and utility easement should extend the floodway easement. 2 Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. 3 Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet. A variance must be requested for the proposed north driveway. Driveway spacing is 300 ft from other driveways and 150 ft from the property line. 4 Baseline Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way to 55 feet from centerline will be required. At arteriaharterial intersections an addition 10 ft of right- of-way should be dedicated for a future right turn lane and dual left turn lanes. 5 A 75 ft radial right-of-way dedication should be made at the intersection of Stagecoach Road and Baseline Road. Friday, October 18, 2013 Page I of 6 6 Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the private improvements such as a sign located in the right-of-way. 7 Stagecoach Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of- way to 55 feet from centerline will be required. Z File Number S-1714 Coburn Land and Leasing, LLC Subd Site Plan 11850 Arch Street Pike 1 Arch Street Pike is classified on the Master Street Plan as a principal arterial. Dedication of right-of- way to 55 feet from centerline will be required. 2 Vinson Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. Z File Number S-1715 Village at Isom Creek Pre Plat Pinnacle Valley Road 1 Pinnacle Valley Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. 2 A 20 feet radial dedication of right-of-way is required at the intersection of the proposed street and Pinnacle Valley Road. 3 With site development, provide design of street conforming to the Master Street Plan. Construct street improvement to these streets including 5-foot sidewalks with planned development as shown on preliminary plat. 4 With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to Pinnacle Valley Road with planned development. Pinnacle Valley Road Road on the Master Street Plan has 22 ft of pavement and two (2) 7 ft paved shoulders with open ditches. Staff prefers a payment made in -lieu of street widening. 5 Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379- 1805 (Travis Herbner). 6 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. Are the lots proposed to be advanced graded with construction of the streets prior to platting? 7 Provide a sketch grading and drainage plan. Portions of the proposed east -west street exceed 15% centerline grade. Per the MSP, the maximum centerline grade on a residential street is 15%. 8 Storm water detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. 9 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 10 A special Grading Permit for Flood Hazard Areas will be required per Sec. 8-283 prior to construction. 11 The minimum Finish Floor elevation of at least 1 ft above the base flood level is required to be shown on the preliminary platted lots in as well as adjacent to the floodplain and on all grading plans. Friday, October 18, 2013 Page 2 of 6 12 In accordance with Section 31-176, floodway areas must be shown as floodway easements or be dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the floodway boundary. , 13 Alteration of the water course will require approval from the Little Rock District of the US Army Corps of Engineers prior to start of work. 14 The proposed alteration of the floodway and fill placed in the floodway will require flood map revisions. Obtain a conditional letter of map revision and no rise certification approval from Public Works and the Federal Emergency Management Agency prior to issuance of a grading permit and/or a building permit. 15 Street lights are required by Section 31-403 of the LR code. Provide plans for approval to Traffic Engineering. Street lights must be installed prior to platting/certificate of occupancy. Contact Traffic Engr 379-1813 (Greg Simmons) for more info. 16 Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-1805 (Travis Herbner) for more information. 17 Per the Master Street Plan, parking is restricted to one side of the street on a 24 ft wide street. Show on the plan now and on the final plat and bill of assurance, the area along the streets where parking is allowed. 18 Street names and street naming conventions must be approved by Public Works. Contact Glenn Haley at (501) 371-4537. 19 Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. 20 Traffic calming devices are required for long straight streets to discourage speeding. Depending on design future phases of development, traffic circles or round -a -bouts at regular intervals, speed humps, narrowing, pedestrian tables, etc... may be warranted. Contact Bill Henry, Traffic Engr. at 379-1816 for additional info. 21 A minimum undisturbed strip 25 ft wide except for reasonable access shall be provided along each side of streams having a 10 yr storm >150 cfs. The undisturbed strip should be measured from the top of the bank. 22 Provide information on the total width of the bridge. 23 Per IBC Section D107, developments of one or two family dwellings where the number of dwelling units exceeds 30 shall be provided with separate and approved fire apparatus access roads and shall meet the requirements of IBC, Section D104.3. The provided emergency access must be provided within a recorded emergency access easement to a public street right-of-way. 24 Provide a grading and drainage plan showing the transition area at the bridge crossing including guard rails, vertical elevation change, sidewalk, driveways, etc... 25 Provide location of driveway on the east side of Pinnacle Valley Road in relation to the proposed street. Z File Number S-1716 Huerta Addition Pre Plat Vicky Lane & Beauchamp Rd 1 Dependent on Pulaski County comments. Friday, October 18, 2013 Page 3 of 6 Z File Number S-878-D Mapco John Barrow Subd Site Plan Review NEC Corner Kanis Rd and John Barrow Road 1 Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. At arterial/arterial intersection the applicant shall dedicate an additional 10 ft of right-of-way for a right turn lane. Total dedication is 55 ft. 2 John Barrow Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of- way 45 feet from centerline will be required. 3 A 20 feet radial dedication of right-of-way is required at the intersection of John Barrow Road and Kanis Road. 4 With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to Kanis Road including 5-foot sidewalks with planned development. A right turn lane should be constructed adjacent to the property. The new back of curb should be located 46 ft from the right-of-way centerline. The back of the sidewalk should be placed at the 5 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 6 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 7 Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379- 1805 (Travis Herbner). 8 Storm water detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. If detention is already provided on site, the detention must continue to be provided. If detention is not already provided, a comparison should be made of impervious surface area. Detention should be provided for additional proposed impervious surface area. 9 Measures to control the increase in stormwater runoff from the increased impervious surface should be implemented to not damage adjacent property. 10 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 11 Street Improvement plans shall include signage and striping. Traffic Engineering must approve completed plans prior to construction. 12 Coordinate design of traffic signal upgrade if required with proposed street improvements. Plans to be forwarded to Traffic Engineering for approval. 13 Driveway locations and widths do not meet the traffic access and circulation requirements of Sections 30-43 and 31-210. The width of driveway must not exceed 36 feet and be constructed per Public Works detail PW-34. Show the wheel tracking of the transport truck on site. A variance should be requested for driveway locations not spaced 150 ft from the property lines and 300 ft from the intersection. Staff believes the Kanis Road driveway should be shared with the existing driveway to the east. 14 Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. Friday, October 18, 2013 Page 4 of 6 Z File Number Z-5228-D Big Rock Mini Golf & FunPark CUP 11411 Baseline Road 1 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 2 Storm water detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. If detention is already provided on site, the detention must continue to be provided. If detention is not already provided, a comparison should be made of impervious surface area. Detention should be provided for additional proposed impervious surface area. 3 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. An advanced grading variance must be requested for Phase 2 to be graded with Phase 1. Z File Number Z-6015-A Arkansas Systems Tract 4 Rev PCD Arkansas Systems Dr and Chenal Parkway 1 Chenal Parkway is classified on the Master Street Plan as a principal arterial. Dedication of right-of- way to 55 feet from centerline will be required. 2 Sidewalks with appropriate handicap ramps are required to be installed along Chenal Parkway in accordance with Sec. 31-175 of the Little Rock Code and the Master Street Plan. Sidewalk must also be constructed along the northside of the 36 ft commercial private street for the length of the property. 3 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to occupancy. 4 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. Is advanced grading requested to occur on the site? 5 Storm water detention ordinance applies to this property. Show the proposed location for stormwater detention facilities on the plan. 6 The existing curb along Arkansas Systems Drive and the median at Chenal Parkway has been painted red and signed as a "Fire Lane". No records show the public street functions as a fire lane. The paint should be removed. 7 A special Grading Permit for Flood Hazard Areas will be required per Sec. 8-283 prior to construction. 8 The minimum Finish Floor elevation of at least 1 ft above the proposed base flood elevation is required to be shown on plat and grading plans. 9 In accordance with Section 31-176, floodway areas must be shown as floodway easements or be dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the floodway boundary. Friday, October 18, 2013 Page 5 of 6 10 The base flood elevations show to be below the bottom of the ditch. Provide hydrologic and hydraulic calculations considering head loss at the bends of proposed drainage system. The proposed alteration of the floodway will require flood map revisions. Obtain a conditional letter of map revision or a no rise certification approval from Public Works and the Federal Emergency Management Agency prior to issuance of a grading permit and/or a building permit. 11 Per City code, Section 36-341, vehicle parking is restricted from being provided in the floodway. A variance must be requested? 12 Damage to public and private property due to hauling operations or operation of construction related equipment from a nearby construction site shall be repaired by the responsible party prior to issuance of a certificate of occupancy. 13 Design plans for piping system must be submitted to staff for approval prior to issuance of a grading permit. The proposed piping must be placed within a drainage easement. 14 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 15 Alteration of the water course will require approval from the Little Rock District of the US Army Corps of Engineers prior to the issuance of a grading permit. 16 Street lights are required by Section 31-403 of the LR code. Provide plans for approval to Traffic Engineering. Street lights must be installed prior to platting/certificate of occupancy. Contact Traffic Engr 379-1813 (Greg Simmons) for more info. Streetlights do not appear to be installed along Arkansas Systems Drive. Z File Number Z-6973-F Village at Colonel Glenn Commercial Lawson Road 1 Due to the proposed use of the property, the Master Street Plan specifies that Lawson Road for the frontage of this property must meet commercial street standards. Dedicate right-of-way to 30 feet from centerline. 2 With site development, provide design of street conforming to the Master Street Plan. Construct one-half street improvement to Lawson Road including 5-foot sidewalks with planned development. The new back of curb should be 18 ft from centerline. 3 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land clearing or grading activities at the site. Other than residential subdivisions, site grading and drainage plans must be submitted and approved prior to the start of construction. 4 Stormwater detention does not apply to this property. 5 Provide a letter prepared by a registered engineer certifying the sight distance at the intersections comply with 2004 AASHTO Green Book standards. Z File Number Z-8891 Watson Short -form PD-R 309 Charles Street 0 No comments Z File Number Z-8892 Gray Short -form PD-R 1012 N. Beechwood Street 0 No comments Friday, October 18, 2013 Page 6 of 6 PLANNING COMMISSION REVIEW CENTRAL ARKANSAS WATER 22 October 2013 NAME TYPE ISSUE COMMENTS ARKANSAS SYSTEMS TRACT 4 PCD Z-6015-A All Central Arkansas Water requirements in REV; SEC ARKANSAS SYSTEMS effect at the time of request for water service DR & CHENAL PKWY must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to NAME TYPE ISSUE COMMENTS discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. 2 NAME VILLAGE AT COL GLENN / COL GLENN, DAVID O DODD & LAWSON RDS TYPE ISSUE COMMENTS PCD Z-6973-F All Central Arkansas Water requirements in effect at the time of request for water service must be met. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection 3 NAME TYPE ISSUE COMMENTS Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation witl be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer awned Line Agreement is required. 0 NAME TYPE ISSUE COMMENTS HUERTA ADDITION PRELIM PRD S-1716 All Central Arkansas Water requirements in PLAT, SOUTH OF VICKIE LN, effect at the time of request for water service EAST OF BEAUCHAMP must be met. A water main extension will be needed to provide water service to this property. Please submit plans for water facilities to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. You should also be aware that water is available in this area due to water district improvements totaling $2 Million; therefore the area has a surcharge of $45.00 per month added to each monthly water bill that goes toward retiring that debt. 5 4. NAME TYPE ISSUE COMMENTS MAPCO JOHN BARROW SITE S-878-D All Central Arkansas Water requirements in PLAN, NEC KANIS & JOHN effect at the time of request for water service BARROW RD must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private NAME TYPE ISSUE COMMENTS facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. 7 NAME TYPE ISSUE COMMENTS THE VILLAGE AT ISOM CREEK S-1715 PRELIM PLAT; WEST SIDE OF PINNACLE VALLEY RD, SOUTH OF PINNACLE VALLEY PH 5 All Central Arkansas Water requirements in effect at the time of request for water service must be met. A 72-inch and a 48-inch raw water line crosses this site within a 50-foot wide waterline easement on North side of property in the area of Ison Creek. Care must be taken to protect these water lines and any appurtenances, such as access and air release vaults, or monumentation which may be in the area. No signs, light poles, dumpster pads or other structures on foundations will be allowed within the existing 50-foot waterline easement. Paved parking and driveways are allowed. Due to the critical nature of the 72-inch and a 48-inch raw water lines located near this project please contact CAW at 501-594-5261, 24 hours prior to any work within the water line Right -of -Way. A water main extension will be needed to provide water service to this property. Please submit plans for water facilities to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. N NAME TYPE ISSUE COMMENTS 6. STAGECOACH -BASELINE REV. S-1713-A PRELIM PLAT; NEC BASELINE & STAGECOACH RD All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private 0 NAME TYPE ISSUE COMMENTS facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. 10 NAME TYPEISSUE BIG ROCK MINI GOLF & FUN CUP Z-5228-D PARK / BASELINE RD #11411 COMMENTS All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. 11 NAME TYPE ISSUE COMMENTS DASSAULT FALCON JET / 3801 E SITE PLAN S-1501-F All Central Arkansas Water requirements in 10TH ST effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private 12 9. 10. NAME TYPE ISSUE COMMENTS facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. GRAY PRD; 1012 N. PRD Z-8892 All Central Arkansas Water requirements in BEECHWOOD ST. effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Contact Central Arkansas Water if additional fire protection or metered water service is required. HAW BRANCH PRELIM PLAT; S-1705-A All Central Arkansas Water requirements in 13805 CRYSTAL VALLEY RD effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Contact Central Arkansas Water if additional fire protection or metered water service is required. 13 NAME TYPE ISSUE COMMENTS 11. COBURN LAND & LEASING LLC; SITE PLAN; ARCH ST. PIKE S-1714 All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The facilities on -site will be private. When meters are planned off private lines, private 14 12 13 NAME TYPEISSUE WASTON PD-R; 309 CHARLES PRD Z-8891 ST. ROCK CITY MARINA & YACHT PCD Z-7919-E CLUB / NE OF 3RD & BOND COMMENTS facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. NO OBJECTIONS All Central Arkansas Water requirements in effect at the time of request for water service must be met. A water main extension will be needed to provide water service to this property. Please submit plans for water facilities to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities. Approval of plans by Central Arkansas Water, the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Additional fire hydrant(s) will be required. Contact the Little Rock Fire Department to obtain information regarding the required placement of the hydrant(s) and contact Central Arkansas Water regarding procedures for installation of the hydrant(s). The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. 15 James, Donna From: Jim Cranor <jcranor@co.pulaski.ar.us> Sent: Friday, October 18, 2013 1:09 PM To: James, Donna Cc: Van McClendon Subject: RE: I need your comments on the November 14th PC Items S-1705-A-Haw Branch -obtain flood development permit from Pulaski County Public Works. -obtain septic approval for existing and proposed systems from AHD. -obtain driveway permits from Pulaski County Public Works for any new driveways. -dedicate required right of way on Crystal Valley road to equal one-half of 90' (45') on west side of Crystal Valley Road. -dimension existing and proposed rights of way. -Provide Bill of Assurance. -Provide State Plane Coordinates. -Show existing houses on plat. -show property owners to west and south. -provide more clarity on floodplain/floodway boundaries. -Show FEMA flood panel number. -Pay $10.00 review fee. 5-1716-Huerta Addition -show source of title. -provide septic approval for existing and proposed systems for all lots. -provide Bill of Assurance. -provide owner/subdivider information -show all required Certificates, (i.e. plat approval, surveying accuracy, owner) etc. -obtain fire department approval for new buildings. -Show state plane coordinates. -pay $10.00 review fee. S-1714-Coburn Land and Leasing Site Plan -show source of title. -provide septic approval for new and existing buildings. -obtain fire department approval for new buildings. -show FEMA flood panel information. -show state plane coordinates. -show existing contours. -show vicinity map. -pay $33.00 review fee. Jim Cranor Plans Review Coordinator Pulaski County Planning and Development 3200 Brown Street Little Rock, AR 72204 501-340-8265 From: James, Donna [DJames@littlerock.org] Sent: Friday, October 18, 2013 12:54 PM To: Jim Cranor Subject: I need your comments on the November 14th PC Items City of Little Rock Planning and Development Filing Fees Date 1011 , 20 /3 Annexation $ . Board of Adjustment �` • $ Cond Use Permit/T U P. $ Final Plat - Planned Unit Dev $ Preliminaiy Plat $ Special Use Permit, '` $ Rezoning $ Site Plans $ Street Name Change $ Street Name Signs Number at ea $ Public Hearing Signs Number_L_a0 ea _ Total $ File No