HomeMy WebLinkAboutS-1714 ApplicationEt
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334 Subdivision
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863
DATE: October 7, 2013
Entergy (2)
Center Point - ARKLA
AT & T (2)
Central Arkansas Water
Little Rock Wastewater
Pulaski County Planning
NAME: Coburn Land and Leasing, LLC Subdivision Site Plan
Review
TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan
Review
FILE NUMBER: S-1714
LOCATION: Arch Street Pike
Little Rock Fire Department
Public Works: Engineering, Traffic (2)
Parks and Recreation Department
Planning and Development — Site Plan Review
Planning and Development Graphics
CATA
TO WHO IT MAY CONCERN:
On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue.
NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013.
NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013.
A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or
recommendations will be appreciated.
Sincerely,
�K—
Donna mes, AICP
Subdivision Administrator
(Please respond below and return this letter with your comments for our records.)
Approved as Submitted.
PLEASE RETURN COMMENTS BY October 21, 2013.
_ Easement (s) required (See attached plat or description.)
*To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the
easement or the request will not be included in the Planning Commission agenda.
By: —g r )V�D MIEI F*91 4" FXC.X I.1'i
Enclosure
PID
City Limits
NOT ZONED y,
=ROSEPOINT7V.)_
3!
THIS
SITE
I SON:RD
0 El
f
< 0 19
to0
3:_ 2
Lu 0 Q
RAUCH RD G
cq 4
e Y RAUGH RO
El
.59
Lu
af
Of
LLI
L11
91
0 WILLOWSPRINGSRD
aTl
Area Zoning
Case- S-1714
Location- Arch Street Pike
Ward: N/A
P D: 14
CT 40.06
TRS: TlS R12W8
N
A
0 225450 900 Feet
a
b
P
t,
e
S-1714 0 ARCH STREET PIKE 0 SITE PLAN REVIEW
City of Little Rock
L�mtDepartment of Planning and Development Planning
723 West Markham Street Zoning and
Uttle Rock, Arkansas 72201-1334 Subdivision
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863
November 15, 2013
Coburn Land and Leasing
11850 Arch Street
Little Rock, AR 72206
Re: Coburn Land and Leasing, LLC Subdivision Site Plan Review (S-
1714), located at 11850 Arch Street
Dear Sirs:
This is to advise you that in connection with your request concerning the above
referenced file number the following action was taken by the Planning
Commission at its meeting on November 14, 2013:
X Approved with conditions.
Recommended approval with conditions.
Recommended approval as submitted.
Denied your request as submitted.
Deferred to the
Other:
Meeting.
If you have any questions please do not hesitate to contact me at 371-6821.
Respectfully,
Donna James, AICP
Subdivision Administrator
Et
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334 Subdivision
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863
DATE: October 7, 2013
Entergy (2)
Center Point - ARKLA
AT & T (2)
Central Arkansas Water
Little Rock Wastewater
Pulaski County Planning
NAME: Coburn Land and Leasing, LLC Subdivision Site Plan
Review
TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan
T2 avi ew
FILE NUMBER: S-1714
LOCATION: Arch Street Pike
Little Rock Fire Department
Public Works: Engineering, Traffic (2)
Parks and Recreation Department
Planning and Development — Site Plan Review
Planning and Development Graphics
CATA
TO WHO IT MAY CONCERN:
On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue.
NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013.
NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013.
A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or
recommendations will be appreciated.
Sincerely,
Donna imes, AICP
Subdivision Administrator
(Please respond below and return this letter with your comments for our records.)
Approved as Submitted.
PLEASE RETURN COMMENTS BY October 21, 2013.
Easement (s) required (See attached plat or description.)
*To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the
easement or the request will not be included in the Planning Commission agenda.
Comments:
du
Lo
1 2- A4-1- le v
m k-t-,aves 6uf S
Et
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision
DATE: October 7, 2013
Entergy (2)
Center Point - ARKLA
AT & T (2)
Central Arkansas Water
Little Rock Wastewater
Pulaski County Planning
NAME: Coburn Land and Leasing, LLC Subdivision Site Plan
Review
TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan
Peview
FILE NUMBER: S-1714
LOCATION: Arch Street Pike
1,1111e Rock Fire Department
Public Works: Engineering, Traffic (2)
Parks and Recreation Department
Planning and Development — Site Plan Review
Planning and Development Graphics
CATA
TO WHO IT MAY CONCERN:
On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue.
NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18, 2013.
NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013.
A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or
recommendations will be appreciated.
Sincerely,
Donna mes, AICP
Subdivision Administrator
(Please resEopd below and return this letter with your comments for our records.)
Approved as Submitted.
PLEASE RETURN COMMENTS BY October 21, 2013.
Easement (s) required (See attached plat or description.)
*To all utilities: If an easement is requested which is in excess of IO feet in width, provide justification for the
easement or the request will not be included in the Planning Commission agenda.
■
Cammen K��
By:
Enclosure
11
\ _ •--fin N
Et
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334 Subdivision
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863
DATE: October 7, 2013
Entergy (2)
Center Point - ARKLA
AT & T (2)
Central Arkansas Water
Little Rock Wastewater
Pulaski County Planning
NAME: Coburn Land and Leasing, LLC Subdivision Site Plan
Review
TYPE OF ISSUE: Subdivision (Multiple Building) Site Plan
Review
FILE NUMBER: S-1714
LOCATION: Arch Street Pike
Little Rock Fire Department
Public Works: Engineering, Traffic (2)
Parks and Recreation Department
Planning and Development — Site Plan Review
Planning and Development Graphics
CATA
TO WHO IT MAY CONCERN:
On November 14, 2013 the Little Rock Planning Commission will consider the above referenced issue.
NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on October 18 2013.
NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on October 23, 2013.
A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or
recommendations will be appreciated.
Sincerely,
Donna mes, AICP
Subdivision Administrator
(Please respond below and return this letter with your comments for our records.)
Approved as Submitted.
PLEASE RETURN COMMENTS BY October 212013.
Easement (s) required (See attached plat or description.)
*To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the
easement or the request will not be included in the Planning Commission agenda.
Comments:
By:
Enclosure
City of Little Rock
Department of Planning and Development Planning
723 West Markham Street Zoning and
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision
NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING
COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF
LAND
DATE: October 8, 2013
TO: Southwest Little Rock United for Progress
ATTENTION: Ms. Pat Gee
ADDRESS: 8409 Dowan Drive
Little Rock AR 72209
REQUEST: Coburn Land and Leasing LLC Subdivision Site Plan Review S-1714 . a
request to recognize a new buildinq that has been constructed on the property to be
used for warehouse space.
GENERAL LOCATION OR ADDRESS: 11850 Arch Street
OWNED BY/APPLICANT: Coburn Land and
NOTICE IS HEREBY GIVEN THAT an application for a Site Plan Review of the above
property has been filed with the Department of Planning and Development. A public
hearing will be held by the L.R. Planning Commission in the Little Rock Board of
Directors Chambers, second floor, City Hall, 500 West Markham Street, on November
14, 2013 at 4:00 P.M. This notice is provided in order to assure that neighborhood
associations are aware of issues that may affect their neighborhood. Information
requests should be directed to the Planning staff at 371-4790.
Tony Bozynski
Director of Planning and Development
05/ 14/09
VARIANCE REQUEST FORM
Date Filed i d [ -1 113
Site Plan Namex Usk ��"Engineer: -�CA &,tl
Owner: Address:
Address: � W9) t,1L1,-- Mij, A
Variance(s) Requested:
(1) Ch. and Section of Subdivision and Development Code variance is requested:
Description:
(2) Ch. and Section of Subdivision and Development Code variance is requested:
(3)Ch. and Section of Subdivision and Development Code variance is requested: _
Justification-
Owner/Agent's Signature:
PLANNING BOARD ACTION:
Approval( ) Date
Denial ( ) Date
Basis for Decision;
05/14/09
INFORMATION SHEET FOR
SITE PLAN REVIEWS
DATE 10 - 1-
NAME:
LOCATION: I I R SO !TyC,� S-krec+ LJ , Ag %Z,2-06 BV(Jl q
DEVELOPER: cakuvvx, i-av c
STREET ADDRESS I (8 50 Ryct,
CITY/STATE/ZIP L 1 ` Z
E-MAIL ADDRESS `i�ne S Ce YIGt 111na In C(o1'st�-fJ1P Vl e
TELEPHONE NO. - -3 7,-2- ` 3 4-33
ENGINEER: _3 ) ortyA � �
STREET ADDRESS a Ogc� D
CITY/STATE/ZIP
e 1t s let' . i&O-�'sa-� -2�7- a � 5
E-MAIL ADDRESS
TELEPHONE NO. ZRO 53
AREA NUMBER OF LOTS
FT. NEW STREET
ZONING
VARIANCES REQUESTED
YES
NO
PROPOSED USES
05/14/09
AFFIDAVIT
I hereby certify that I have notified all the property owners abutting the above property that subject
property is being considered for Site Plan Review and that a Public Hearing will be held by the Pulaski
County Planning Board at the time and place described above.
Applicant (owner or authorized agent)
(Name) In
(Date)
ro
05/ 14/09
Pulaski County Site Plan Checklist
PLANNING AND DEVELOPMENT
3200 BROWN STREET
LITTLE ROCK, AR 72204
501-340-8260
DATE: 16 - r I
DEVELOPMENT:
LOCATION: (g o �'►V Pe� ( -7z 7-06 l `r
ENGINEER/SURVEYOR: PjY O CA< u trcJ e 1 � l C] Vl ] � by-() d le5
PLANNING JURISDICTION:
Van McClendon Planning & Development Director
The site plan shall indicate the following information:
1)
6.3 A.
LETTER OF APPLICATION
2)
15 COPIES OF THE PROPOSED SITE PLAN
3)
6.3 B.
PROPOSED NAME OF THE DEVELOPMENT
4)
6.3 C.
NAME AND ADDRESS OF OWNER OF RECORD
5)
6.3 D.
SOURCE OF TITLE
6)
6.3 E.
NAME AND ADDRESS OF DEVELOPER
7)
6.3 F.
DATE OF SURVEY, NORTH POINT, GRAPHIC SCALE AND TWO LAND
CORNERS AND STATE PLANE COORDINATES FOR AT LEAST TWO POINTS
8)
6.3 G.
SEAL AND SIGNATURE OF A PROFESSIONAL LAND SURVEYOR
9)
6.3 H.
SEAL AND SIGNATURE OF A PROFESSIONAL ENGINEER (WHEN REQUIRED)
10)
6.31.
LOCATION OF PLAT/TRACT BY LEGAL DESCRIPTION GIVING ACREAGE
11)
6.3 J.
VICINITY MAP
12)
6.3 K.
BOUNDARY LINES OF TRACT WITH EXACT DIMENSIONS
13)
6.3 L.
CONTOURS OF NOT MORE THAN FOUR (4) FEET
14)
6.3 M.
NATURAL FEATURES
15)
6.3 N.
WATER COURSES ENTERING AND LEAVING THE TRACT
16)
6.30.
CULTURAL FEATURES
05/ 14/09
17)
6.3. P.
NAMES OF RECORDED ABUTTING SUBDIVISIONS
18)
6.3 Q.
NAMES OF ABUTTING OWNERS OF UN -SUBDIVIDED PROPERTY
19)
6.3 R.
ZONING DISTRICTS, IF APPLICABLE
20)
6.3 S.
A SUMMARY OF THE PROPOSED DEVELPOMENT
21)
6.3 T.
EXISTING COVENANTS AND RESTRICTIONS
22)
6.3 U.
SOURCE OF WATER SUPPLY
23)
6.3 V.
PROVISIONS FOR SEWER DISPOSAL, DRAINAGE AND FLOOD CONTROL
24)
6.3 W.
LETTERS OF APPROVAL FROM GOVERNMENTS, UTILITIES, ETC.
25)
6.3 X.
STORM DRAINAGE PLAN
26)
6.3 Y.
OTHER INFORMATION AS REQUIRED
27)
6.4 A.
SITE SUITABILITY
28)
6.4 B. La-b.
ADDITIONAL DWELLING UNITS, SETBACKS AND PARKING
29)
6.4 B.2.a-b,
DUPLEX, TRI-PLEX AND QUADROPLEX, SETBACKS AND PARKING
30)
6.4 B.3.a-b.
MULTI -FAMILY, SETBACKS AND PARKING
31)
6.4 B.4.a-b.
NON-RESIDENTIAL DEVELOPMENT, SETBACKS AND PARKING
32)
6.4 B.S.
MEETS STANDARDS OF AMERCIAN WITH DISABILITIES ACT
33)
6.5
MULTIPLE BUILDING LOTS
34)
6.6
SETBACKS ON UN -PLATTED PROPERTY
35)
8.1
DEVELOPMENT IN WATERSHED OF PUBLIC WATER SUPPLY
36)
8.2 A-C
WASTEWATER DISCHARGE PLAN
37)
8.3
STORMWATER DISCHARGE PLAN
38)
8.4 A-G
PERFORMANCE STANDARDSBMP'S USED
39)
8.7 A-B
ADDITIONAL PLAT AND SITE PLAN APPLICATION REQUIREMENTS
45.)
8.8
NPDES REQUIREMENTS
46.)
8.9A-C
UNDISTURBED AREAS
47.)
_8.10A-B
CONSTRUCTION ON VERY HIGH SLOPES
48)
FEES PAID
05/14/09
AFFIDAVIT
I, certify by my signature below that I hereby
authorize C�.1 to act as my agent regarding the
CtAnnh'( cli ('A/L 7Ra W of the below described property.
Property described as:
of Title Holder
(0-�-13
Date
Little Rock Wastewater Comments
Project Number S-1501-F
Project Name
Project Type
Dassault Falcon
Subdivision Site Plan Review
Project Number S-1705-A
Project Name
Project Type
Haw Branch
Single Family Preliminary Plat
Project Number S-1713-A
Project Name
Project Type
Stagecoach Baseline
Preliminary Plat Commercial
Project Number S-1714
Project Name
Project Type
Coburn Land and Leasing
Subdivision Site Plan Review
Project Number S-1715
Project Name
Project Type
The Village at Isom Creek
Single Family Preliminary Plat
Project Number S-1716
Project Name
Project Type
Huerta Addition
Single Family Preliminary Plat
Project Number S-878-D
Project Name
Project Type
Mapco John Barrow
Subdivision Site Plan Review
Project Number Z-5228-D
Project Name
Project Type
Big Rock Mini Golf & Fun
Conditional Use Permit
Park
Project Number Z-6015-A
Project Name
Project Type
Arkansas Systems Tract 4
Planned Commercial Development
Comment Made
Sewer available to this project.
Comment Made
Outside Service Boundary, no comment.
Comment Made
Sewer available to this project.
Comment Made
Outside Service Boundary, no comment.
Comment Made
Sewer main extension required with easements for this
project.
Comment Made
Outside Service Boundary, no comment.
Comment Made
Sewer available to this project.
Comment Made
Sewer available to this project.
Comment Made
Sewer available to this project.
Friday, October 11, 2013 Page 1 of 2
Project Number Z-6973-F
Project Name Project Type
The Village at Colonel Planned Commercial Development
Glenn Lot 4
Project Number Z-7919-E
Project Name Project Type
Rock City Marina and Yacht Planned Commercial Development
Club
Project Number Z-8891
Project Name
Project Type
Watson
Planned Residential Development
Project Number
Z-8892
Project Name
Project Type
Gray
Planned Residential Development
Comment Made
Sewer main extension required with easements for this
project.
Comment Made
Sewer available to this project. 54" and 601' Outfall
located in Vicinity of Project. No construction allowed
with Easement of Existing Outfall.
Comment Made
Sewer available to this project.
Comment Made
Sewer available to this project.
Friday, October 11, 2013 Page 2 of 2
Public Works Review Comments
Planning Commission Board of Adjustment
Agenda Date: 11-14-13
Z File Number S-1501-F
Dassault Falcom Subd Site Plan Review 3801 E. IOth St
1 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction.
2 Storm water detention ordinance applies to this property.
3 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas
Department of Environmental Quality prior to the start of construction.
4 Damage to public and private property due to hauling operations or operation of construction related
equipment from a nearby construction site shall be repaired by the responsible party prior to issuance
of a certificate of occupancy.
Z File Number S-1705-A
Haw Branch Preliminary Plat
13805 Crystal Valley Road
1 Crystal Valley Road is classified on the Master Street Plan as a collector street. A dedication of
right-of-way 30 feet from centerline will be required.
2 The show proposed driveway location(s).
3 Contact Pulaski County Planning Department for conditions for developing property in the floodplain.
4 The minimum Finish Floor elevation of at least 1 ft above the base flood elevation is required to be
shown on plat and grading plans.
Z File Number S-1713-A
Stagecoach -Baseline Rev Pre Plat
NEC Baseline & Stagecoach Rd
I The access and utility easement should extend the floodway easement.
2 Obtain permits for improvements within State Highway right-of-way from AHTD, District VI.
3 Driveway locations and widths do not meet the traffic access and circulation requirements of Sections
30-43 and 31-210. The width of driveway must not exceed 36 feet. A variance must be requested for
the proposed north driveway. Driveway spacing is 300 ft from other driveways and 150 ft from the
property line.
4 Baseline Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-way
to 55 feet from centerline will be required. At arteriaharterial intersections an addition 10 ft of right-
of-way should be dedicated for a future right turn lane and dual left turn lanes.
5 A 75 ft radial right-of-way dedication should be made at the intersection of Stagecoach Road and
Baseline Road.
Friday, October 18, 2013 Page I of 6
6 Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the private
improvements such as a sign located in the right-of-way.
7 Stagecoach Road is classified on the Master Street Plan as a principal arterial. Dedication of right-of-
way to 55 feet from centerline will be required.
Z File Number S-1714
Coburn Land and Leasing, LLC Subd Site Plan 11850 Arch Street Pike
1 Arch Street Pike is classified on the Master Street Plan as a principal arterial. Dedication of right-of-
way to 55 feet from centerline will be required.
2 Vinson Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way
45 feet from centerline will be required.
Z File Number S-1715
Village at Isom Creek Pre Plat Pinnacle Valley Road
1 Pinnacle Valley Road is classified on the Master Street Plan as a minor arterial. A dedication of
right-of-way 45 feet from centerline will be required.
2 A 20 feet radial dedication of right-of-way is required at the intersection of the proposed street and
Pinnacle Valley Road.
3 With site development, provide design of street conforming to the Master Street Plan. Construct
street improvement to these streets including 5-foot sidewalks with planned development as shown
on preliminary plat.
4 With site development, provide design of street conforming to the Master Street Plan. Construct
one-half street improvement to Pinnacle Valley Road with planned development. Pinnacle Valley
Road Road on the Master Street Plan has 22 ft of pavement and two (2) 7 ft paved shoulders with
open ditches. Staff prefers a payment made in -lieu of street widening.
5 Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain
barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-
1805 (Travis Herbner).
6 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction. Are the lots
proposed to be advanced graded with construction of the streets prior to platting?
7 Provide a sketch grading and drainage plan. Portions of the proposed east -west street exceed 15%
centerline grade. Per the MSP, the maximum centerline grade on a residential street is 15%.
8 Storm water detention ordinance applies to this property. Show the proposed location for stormwater
detention facilities on the plan.
9 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas
Department of Environmental Quality prior to the start of construction.
10 A special Grading Permit for Flood Hazard Areas will be required per Sec. 8-283 prior to
construction.
11 The minimum Finish Floor elevation of at least 1 ft above the base flood level is required to be
shown on the preliminary platted lots in as well as adjacent to the floodplain and on all grading plans.
Friday, October 18, 2013 Page 2 of 6
12 In accordance with Section 31-176, floodway areas must be shown as floodway easements or be
dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the
floodway boundary. ,
13 Alteration of the water course will require approval from the Little Rock District of the US Army
Corps of Engineers prior to start of work.
14 The proposed alteration of the floodway and fill placed in the floodway will require flood map
revisions. Obtain a conditional letter of map revision and no rise certification approval from Public
Works and the Federal Emergency Management Agency prior to issuance of a grading permit and/or a
building permit.
15 Street lights are required by Section 31-403 of the LR code. Provide plans for approval to Traffic
Engineering. Street lights must be installed prior to platting/certificate of occupancy. Contact Traffic
Engr 379-1813 (Greg Simmons) for more info.
16 Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any
work in the right-of-way. Contact Traffic Engineering at (501) 379-1805 (Travis Herbner) for more
information.
17 Per the Master Street Plan, parking is restricted to one side of the street on a 24 ft wide street. Show
on the plan now and on the final plat and bill of assurance, the area along the streets where parking is
allowed.
18 Street names and street naming conventions must be approved by Public Works. Contact Glenn
Haley at (501) 371-4537.
19 Provide a letter prepared by a registered engineer certifying the sight distance at the intersections
comply with 2004 AASHTO Green Book standards.
20 Traffic calming devices are required for long straight streets to discourage speeding. Depending on
design future phases of development, traffic circles or round -a -bouts at regular intervals, speed humps,
narrowing, pedestrian tables, etc... may be warranted. Contact Bill Henry, Traffic Engr. at 379-1816
for additional info.
21 A minimum undisturbed strip 25 ft wide except for reasonable access shall be provided along each
side of streams having a 10 yr storm >150 cfs. The undisturbed strip should be measured from the
top of the bank.
22 Provide information on the total width of the bridge.
23 Per IBC Section D107, developments of one or two family dwellings where the number of dwelling
units exceeds 30 shall be provided with separate and approved fire apparatus access roads and shall
meet the requirements of IBC, Section D104.3. The provided emergency access must be provided
within a recorded emergency access easement to a public street right-of-way.
24 Provide a grading and drainage plan showing the transition area at the bridge crossing including
guard rails, vertical elevation change, sidewalk, driveways, etc...
25 Provide location of driveway on the east side of Pinnacle Valley Road in relation to the proposed
street.
Z File Number S-1716
Huerta Addition Pre Plat Vicky Lane & Beauchamp Rd
1 Dependent on Pulaski County comments.
Friday, October 18, 2013 Page 3 of 6
Z File Number S-878-D
Mapco John Barrow Subd Site Plan Review NEC Corner Kanis Rd and John Barrow Road
1 Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way
45 feet from centerline will be required. At arterial/arterial intersection the applicant shall dedicate an
additional 10 ft of right-of-way for a right turn lane. Total dedication is 55 ft.
2 John Barrow Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-
way 45 feet from centerline will be required.
3 A 20 feet radial dedication of right-of-way is required at the intersection of John Barrow Road and
Kanis Road.
4 With site development, provide design of street conforming to the Master Street Plan. Construct
one-half street improvement to Kanis Road including 5-foot sidewalks with planned development. A
right turn lane should be constructed adjacent to the property. The new back of curb should be
located 46 ft from the right-of-way centerline. The back of the sidewalk should be placed at the
5 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to
occupancy.
6 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction.
7 Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain
barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-
1805 (Travis Herbner).
8 Storm water detention ordinance applies to this property. Show the proposed location for stormwater
detention facilities on the plan. If detention is already provided on site, the detention must continue
to be provided. If detention is not already provided, a comparison should be made of impervious
surface area. Detention should be provided for additional proposed impervious surface area.
9 Measures to control the increase in stormwater runoff from the increased impervious surface should be
implemented to not damage adjacent property.
10 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas
Department of Environmental Quality prior to the start of construction.
11 Street Improvement plans shall include signage and striping. Traffic Engineering must approve
completed plans prior to construction.
12 Coordinate design of traffic signal upgrade if required with proposed street improvements. Plans to be
forwarded to Traffic Engineering for approval.
13 Driveway locations and widths do not meet the traffic access and circulation requirements of Sections
30-43 and 31-210. The width of driveway must not exceed 36 feet and be constructed per Public
Works detail PW-34. Show the wheel tracking of the transport truck on site. A variance should be
requested for driveway locations not spaced 150 ft from the property lines and 300 ft from the
intersection. Staff believes the Kanis Road driveway should be shared with the existing driveway to
the east.
14 Damage to public and private property due to hauling operations or operation of construction related
equipment from a nearby construction site shall be repaired by the responsible party prior to issuance
of a certificate of occupancy.
Friday, October 18, 2013 Page 4 of 6
Z File Number Z-5228-D
Big Rock Mini Golf & FunPark CUP 11411 Baseline Road
1 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to
occupancy.
2 Storm water detention ordinance applies to this property. Show the proposed location for stormwater
detention facilities on the plan. If detention is already provided on site, the detention must continue
to be provided. If detention is not already provided, a comparison should be made of impervious
surface area. Detention should be provided for additional proposed impervious surface area.
3 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction. An advanced
grading variance must be requested for Phase 2 to be graded with Phase 1.
Z File Number Z-6015-A
Arkansas Systems Tract 4 Rev PCD
Arkansas Systems Dr and Chenal Parkway
1 Chenal Parkway is classified on the Master Street Plan as a principal arterial. Dedication of right-of-
way to 55 feet from centerline will be required.
2 Sidewalks with appropriate handicap ramps are required to be installed along Chenal Parkway in
accordance with Sec. 31-175 of the Little Rock Code and the Master Street Plan. Sidewalk must also
be constructed along the northside of the 36 ft commercial private street for the length of the property.
3 Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-way prior to
occupancy.
4 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction. Is advanced grading
requested to occur on the site?
5 Storm water detention ordinance applies to this property. Show the proposed location for stormwater
detention facilities on the plan.
6 The existing curb along Arkansas Systems Drive and the median at Chenal Parkway has been painted
red and signed as a "Fire Lane". No records show the public street functions as a fire lane. The
paint should be removed.
7 A special Grading Permit for Flood Hazard Areas will be required per Sec. 8-283 prior to
construction.
8 The minimum Finish Floor elevation of at least 1 ft above the proposed base flood elevation is
required to be shown on plat and grading plans.
9 In accordance with Section 31-176, floodway areas must be shown as floodway easements or be
dedicated to the public. In addition, a 25 foot wide access easement is required adjacent to the
floodway boundary.
Friday, October 18, 2013 Page 5 of 6
10 The base flood elevations show to be below the bottom of the ditch. Provide hydrologic and
hydraulic calculations considering head loss at the bends of proposed drainage system. The proposed
alteration of the floodway will require flood map revisions. Obtain a conditional letter of map
revision or a no rise certification approval from Public Works and the Federal Emergency
Management Agency prior to issuance of a grading permit and/or a building permit.
11 Per City code, Section 36-341, vehicle parking is restricted from being provided in the floodway. A
variance must be requested?
12 Damage to public and private property due to hauling operations or operation of construction related
equipment from a nearby construction site shall be repaired by the responsible party prior to issuance
of a certificate of occupancy.
13 Design plans for piping system must be submitted to staff for approval prior to issuance of a grading
permit. The proposed piping must be placed within a drainage easement.
14 If disturbed area is 1 or more acres, obtain a NPDES storm water permit from the Arkansas
Department of Environmental Quality prior to the start of construction.
15 Alteration of the water course will require approval from the Little Rock District of the US Army
Corps of Engineers prior to the issuance of a grading permit.
16 Street lights are required by Section 31-403 of the LR code. Provide plans for approval to Traffic
Engineering. Street lights must be installed prior to platting/certificate of occupancy. Contact Traffic
Engr 379-1813 (Greg Simmons) for more info. Streetlights do not appear to be installed along
Arkansas Systems Drive.
Z File Number Z-6973-F
Village at Colonel Glenn Commercial Lawson Road
1 Due to the proposed use of the property, the Master Street Plan specifies that Lawson Road for the
frontage of this property must meet commercial street standards. Dedicate right-of-way to 30 feet from
centerline.
2 With site development, provide design of street conforming to the Master Street Plan. Construct
one-half street improvement to Lawson Road including 5-foot sidewalks with planned development.
The new back of curb should be 18 ft from centerline.
3 A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any land
clearing or grading activities at the site. Other than residential subdivisions, site grading and
drainage plans must be submitted and approved prior to the start of construction.
4 Stormwater detention does not apply to this property.
5 Provide a letter prepared by a registered engineer certifying the sight distance at the intersections
comply with 2004 AASHTO Green Book standards.
Z File Number Z-8891
Watson Short -form PD-R 309 Charles Street
0 No comments
Z File Number Z-8892
Gray Short -form PD-R 1012 N. Beechwood Street
0 No comments
Friday, October 18, 2013 Page 6 of 6
PLANNING COMMISSION REVIEW
CENTRAL ARKANSAS WATER
22 October 2013
NAME TYPE ISSUE COMMENTS
ARKANSAS SYSTEMS TRACT 4 PCD Z-6015-A All Central Arkansas Water requirements in
REV; SEC ARKANSAS SYSTEMS effect at the time of request for water service
DR & CHENAL PKWY must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
NAME TYPE ISSUE
COMMENTS
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
2
NAME
VILLAGE AT COL GLENN / COL
GLENN, DAVID O DODD &
LAWSON RDS
TYPE ISSUE COMMENTS
PCD Z-6973-F All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
3
NAME TYPE ISSUE COMMENTS
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation witl be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer awned Line Agreement is
required.
0
NAME TYPE ISSUE COMMENTS
HUERTA ADDITION PRELIM PRD S-1716 All Central Arkansas Water requirements in
PLAT, SOUTH OF VICKIE LN, effect at the time of request for water service
EAST OF BEAUCHAMP must be met.
A water main extension will be needed to
provide water service to this property.
Please submit plans for water facilities to
Central Arkansas Water for review. Plan
revisions may be required after additional
review. Contact Central Arkansas Water
regarding procedures for installation of water
facilities. Approval of plans by Central
Arkansas Water, the Arkansas Department
of Health Engineering Division and Little
Rock Fire Department is required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to
obtain information regarding the required
placement of the hydrant(s) and contact
Central Arkansas Water regarding
procedures for installation of the hydrant(s).
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. You
should also be aware that water is available
in this area due to water district
improvements totaling $2 Million; therefore
the area has a surcharge of $45.00 per
month added to each monthly water bill that
goes toward retiring that debt.
5
4.
NAME TYPE ISSUE COMMENTS
MAPCO JOHN BARROW SITE S-878-D All Central Arkansas Water requirements in
PLAN, NEC KANIS & JOHN effect at the time of request for water service
BARROW RD must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
NAME
TYPE ISSUE COMMENTS
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
7
NAME
TYPE ISSUE COMMENTS
THE VILLAGE AT ISOM CREEK S-1715
PRELIM PLAT; WEST SIDE OF
PINNACLE VALLEY RD, SOUTH
OF PINNACLE VALLEY PH 5
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
A 72-inch and a 48-inch raw water line
crosses this site within a 50-foot wide
waterline easement on North side of property
in the area of Ison Creek. Care must be
taken to protect these water lines and any
appurtenances, such as access and air
release vaults, or monumentation which may
be in the area. No signs, light poles,
dumpster pads or other structures on
foundations will be allowed within the existing
50-foot waterline easement. Paved parking
and driveways are allowed. Due to the
critical nature of the 72-inch and a 48-inch
raw water lines located near this project
please contact CAW at 501-594-5261, 24
hours prior to any work within the water line
Right -of -Way.
A water main extension will be needed to
provide water service to this property.
Please submit plans for water facilities to
Central Arkansas Water for review. Plan
revisions may be required after additional
review. Contact Central Arkansas Water
regarding procedures for installation of water
facilities. Approval of plans by Central
Arkansas Water, the Arkansas Department
of Health Engineering Division and Little
Rock Fire Department is required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to
obtain information regarding the required
placement of the hydrant(s) and contact
Central Arkansas Water regarding
procedures for installation of the hydrant(s).
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges.
N
NAME TYPE ISSUE COMMENTS
6. STAGECOACH -BASELINE REV. S-1713-A
PRELIM PLAT; NEC BASELINE &
STAGECOACH RD
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
0
NAME TYPE ISSUE COMMENTS
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
10
NAME TYPEISSUE
BIG ROCK MINI GOLF & FUN CUP Z-5228-D
PARK / BASELINE RD #11411
COMMENTS
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
11
NAME TYPE ISSUE COMMENTS
DASSAULT FALCON JET / 3801 E SITE PLAN S-1501-F All Central Arkansas Water requirements in
10TH ST effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
12
9.
10.
NAME TYPE ISSUE COMMENTS
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
GRAY PRD; 1012 N. PRD Z-8892 All Central Arkansas Water requirements in
BEECHWOOD ST. effect at the time of request for water service
must be met.
Contact Central Arkansas Water regarding
the size and location of the water meter.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Contact Central Arkansas Water if additional
fire protection or metered water service is
required.
HAW BRANCH PRELIM PLAT; S-1705-A All Central Arkansas Water requirements in
13805 CRYSTAL VALLEY RD effect at the time of request for water service
must be met.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Contact Central Arkansas Water if additional
fire protection or metered water service is
required.
13
NAME TYPE ISSUE COMMENTS
11. COBURN LAND & LEASING LLC;
SITE PLAN; ARCH ST. PIKE
S-1714
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
The Little Rock Fire Department needs to
evaluate this site to determine whether
additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s)
are required, they will be installed at the
Developer's expense.
Please submit plans for water facilities
and/or fire protection system to Central
Arkansas Water for review. Plan revisions
may be required after additional review.
Contact Central Arkansas Water regarding
procedures for installation of water facilities
and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering
Division and Little Rock Fire Department is
required.
Contact Central Arkansas Water regarding
the size and location of the water meter.
A Capital Investment Charge based on the
size of meter connection(s) will apply to this
project in addition to normal charges. This
fee will apply to all connections including
metered connections off the private fire
system.
If there are facilities that need to be adjusted
and/or relocated, contact Central Arkansas
Water. That work would be done at the
expense of the developer.
Due to the nature of this facility, installation
of an approved reduced pressure zone
backflow preventer assembly (RPZ) is
required on the domestic water service. This
assembly must be installed prior to the first
point of use. Central Arkansas Water (CAW)
requires that upon installation of the RPZA,
successful tests of the assembly must be
completed by a Certified Assembly Tester
licensed by the State of Arkansas and
approved by CAW. The test results must be
sent to CAW's Cross Connection Section
within ten days of installation and annually
thereafter. Contact the Cross Connection
Section at 377-1226 if you would like to
discuss backflow prevention requirements
for this project.
The facilities on -site will be private. When
meters are planned off private lines, private
14
12
13
NAME TYPEISSUE
WASTON PD-R; 309 CHARLES PRD Z-8891
ST.
ROCK CITY MARINA & YACHT PCD Z-7919-E
CLUB / NE OF 3RD & BOND
COMMENTS
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
NO OBJECTIONS
All Central Arkansas Water requirements in
effect at the time of request for water service
must be met.
A water main extension will be needed to
provide water service to this property.
Please submit plans for water facilities to
Central Arkansas Water for review. Plan
revisions may be required after additional
review. Contact Central Arkansas Water
regarding procedures for installation of water
facilities. Approval of plans by Central
Arkansas Water, the Arkansas Department
of Health Engineering Division and Little
Rock Fire Department is required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
Additional fire hydrant(s) will be required.
Contact the Little Rock Fire Department to
obtain information regarding the required
placement of the hydrant(s) and contact
Central Arkansas Water regarding
procedures for installation of the hydrant(s).
The facilities on -site will be private. When
meters are planned off private lines, private
facilities shall be installed to Central
Arkansas Water's material and construction
specifications and installation will be
inspected by an engineer, licensed to
practice in the State of Arkansas. Execution
of Customer Owned Line Agreement is
required.
This development will have minor impact on
the existing water distribution system.
Proposed water facilities will be sized to
provide adequate pressure and fire
protection.
15
James, Donna
From: Jim Cranor <jcranor@co.pulaski.ar.us>
Sent: Friday, October 18, 2013 1:09 PM
To: James, Donna
Cc: Van McClendon
Subject: RE: I need your comments on the November 14th PC Items
S-1705-A-Haw Branch
-obtain flood development permit from Pulaski County Public Works.
-obtain septic approval for existing and proposed systems from AHD.
-obtain driveway permits from Pulaski County Public Works for any new driveways.
-dedicate required right of way on Crystal Valley road to equal one-half of 90' (45') on west side of Crystal Valley Road.
-dimension existing and proposed rights of way.
-Provide Bill of Assurance.
-Provide State Plane Coordinates.
-Show existing houses on plat.
-show property owners to west and south.
-provide more clarity on floodplain/floodway boundaries.
-Show FEMA flood panel number.
-Pay $10.00 review fee.
5-1716-Huerta Addition
-show source of title.
-provide septic approval for existing and proposed systems for all lots.
-provide Bill of Assurance.
-provide owner/subdivider information
-show all required Certificates, (i.e. plat approval, surveying accuracy, owner) etc.
-obtain fire department approval for new buildings.
-Show state plane coordinates.
-pay $10.00 review fee.
S-1714-Coburn Land and Leasing Site Plan
-show source of title.
-provide septic approval for new and existing buildings.
-obtain fire department approval for new buildings.
-show FEMA flood panel information.
-show state plane coordinates.
-show existing contours.
-show vicinity map.
-pay $33.00 review fee.
Jim Cranor
Plans Review Coordinator
Pulaski County Planning and Development
3200 Brown Street
Little Rock, AR 72204
501-340-8265
From: James, Donna [DJames@littlerock.org]
Sent: Friday, October 18, 2013 12:54 PM
To: Jim Cranor
Subject: I need your comments on the November 14th PC Items
City of Little Rock
Planning and Development
Filing Fees
Date 1011 , 20 /3
Annexation
$ .
Board of Adjustment �` •
$
Cond Use Permit/T U P.
$
Final Plat -
Planned Unit Dev
$
Preliminaiy Plat
$
Special Use Permit, '`
$
Rezoning
$
Site Plans
$
Street Name Change
$
Street Name Signs
Number at ea
$
Public Hearing Signs
Number_L_a0 ea
_
Total
$
File No