HomeMy WebLinkAboutS-1713-A Staff AnalysisITEM ND.- 2. 5-1713-A
NAME: Stagecoach -Baseline Revised Preliminary Plat
LOCATION- located on the Northeast corner of Baseline and Stagecoach Roads
Planninq Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than October 30, 2013. The Office of Planning and Development
must receive the proof of notice no later than November 8, 2013.
2. The property is zoned C-3, General Commercial District which typically requires a
25-foot platted building line. The plan submitted indicates the placement of a 45-foot
platted building line.
Variance/Waivers: A variance from Sections 30-43 and 31-210 to allow the northern
driveway spacing less than 300 feet from other driveways and less than 150 feet from
the property line.
Public Works Conditions:
1. The access and utility easement should extend the floodway easement.
2. Obtain permits for improvements within State Highway right-of-way from AHTD,
District VI.
3. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The width of driveway must not exceed
36-feet. A variance must be requested for the proposed north driveway. Driveway
spacing is 300-feet from other driveways and 150-feet from the property line.
4. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55-feet from centerline will be required. At
arterial\arterial intersections an addition 10-feet of right-of-way should be dedicated
for a future right turn lane and dual left turn lanes.
5. A 75-foot radial right-of-way dedication should be made at the intersection of
Stagecoach Road and Baseline Road.
6. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for the
private improvements such as a sign located in the right-of-way.
7. Stagecoach Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55-feet from centerline will be required.
AHTD -
1. AHTD needs more information concerning the driveway. Provide driveway width,
show the driveway to constructed as per the DR-1 detail, show the location of the
Item # 2.
driveway in relationship to the property line and provide a driveway application in the
name of the owner.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available to this project. Contact Little Rock Wastewater Utility for
any additional information.
Entergy: Entergy has no objections to this plat as long as easements are retained
for existing electrical facilities on the western and northern boundaries of the area.
Contact Entergy at 954-5158 for additional information.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
4. Contact Central Arkansas Water regarding the size and location of the water meter.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
Item # 2.
8. The facilities on -site will be private. When meters are planned off private lines.
Private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line agreement
is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
County Plannin : No comment.
CATA: Directly on the #23 Baseline/Southwest bus route. Contact CATA for
additional information.
Parks and Recreation: No comment received.
Planning Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, October 30, 2013.
Item # 2.
November 14, 2013
ITEM NO.: 2 FILE NO.:
NAME: Stagecoach -Baseline Revised Preliminary Plat
LOCATION: Located on the Northeast corner of Baseline and Stagecoach Roads
DEVELOPER:
Colliers International
1 Allied Drive, Suite 1500
Little Rock, AR 72202
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.37 acres
CURRENT ZONIN
PLANNING DISTRICT:
CENSUS TRACT
NUMBER OF LOTS: 2
C-3, General Commercial District
16 — Otter Creek
42.08
FT. NEW STREET: 0 LF
VARIANCENVAIVERS: A variance from Sections 30-43 and 31-210 to allow the
northern driveway spacing less than 300 feet from other driveways and less than
150 feet from the property line.
BACKGROUN
On June 22, 2006, the Little Rock Planning Commission approved a preliminary plat to
allow the creation of two (2) lots from this 3.37 acre tract. The final plat was not
executed and the approved preliminary plat expired.
On December 3, 2009, the Little Rock Planning Commission approved a preliminary
plat to allow the creation of two (2) lots from a property containing 3.37 acres. The site
was located at the northeast corner of Baseline and Stagecoach Roads. USA Drug
(now Wal-greens) was to retain ownership of Lot 1 and proposed to sell Lot 2. A
common access easement for ingress/egress was indicated on the plat. Both
developments would utilize a single driveway apron from Stagecoach Road. The
November 14, 2013
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1713-A
sidewalks abutting the entire property were installed with the construction of the retail
building. The final plat was not executed and filed for record and the parcel remains
one tract.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The request is to amend the previously approved Preliminary Plat to allow the
placement of a driveway on Lot 2 nearer the property line than typically allowed
by City ordinance. Proposed Lot 1 has developed with a retail user and presently
has driveways on Stagecoach Road and Baseline Road. Lot 2 is proposed to
develop with a City of Little Rock Fire Station. The lots will be final platted with a
shared driveway on Stagecoach Road between Lots 1 and 2. The employees
and visitors of the fire station (Lot 2) will use the shared access. The driveway
on Stagecoach Road serving Lot 2 will be used by the fire station truck traffic
only.
B. EXISTING CONDITIONS:
The intersection of Baseline and Stagecoach Roads contains a number of retail
uses including a convenience store with gas pumps, a strip retail center with a
multiple uses including a restaurant and vacant C-3, General Commercial District
zoned property. This site contains a Wal-greens Drug store located at the
intersection of the two (2) streets. The eastern boundary is the Fourche Creek.
To the north is an office use. A Family Dollar Store is located on Stagecoach
Road further south of this site.
Stagecoach Road is a four lane road with turn lanes at major intersections.
Sidewalk has been placed adjacent to the site. There is a marked bike lane
located on Stagecoach Road. Baseline Road is a two lane road. Sidewalks
have been placed adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff not has received any comment from area residents
concerning the proposed request. All abutting property owners along with the
Otter Creek Homeowners Association, Southwest Little Rock United for
Progress, Bentley Court Property Owners Association and the Wedgewood
Creek Property Owners Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. The access and utility easement should extend the floodway easement.
2
November 14, 2013
SUBDIVISION
ITEM NO.: 2 (Cont.
FILE NO.: S-1713-A
2. Obtain permits for improvements within State Highway right-of-way from
AHTD, District VI.
3. Driveway locations and widths do not meet the traffic access and circulation
requirements of Sections 30-43 and 31-210. The width of driveway must not
exceed 36-feet. A variance must be requested for the proposed north
driveway. Driveway spacing is 300-feet from other driveways and 150-feet
from the property line.
4. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55-feet from centerline will be required. At
arterial\arterial intersections an addition 10-feet of right-of-way should be
dedicated for a future right turn lane and dual left turn lanes.
5. A 75-foot radial right-of-way dedication should be made at the intersection of
Stagecoach Road and Baseline Road.
6. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for the private improvements such as a sign located in the right-of-way.
7. Stagecoach Road is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way to 55-feet from centerline will be required.
AHTD -
1. AHTD needs more information concerning the driveway. Provide driveway
width, show the driveway to constructed as per the DR-1 detail, show the
location of the driveway in relationship to the property line and provide a
driveway application in the name of the owner.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available to this project. Contact Little Rock Wastewater
Utility for any additional information.
Entergy: Entergy has no objections to this plat as long as easements are
retained for existing electrical facilities on the western and northern boundaries of
the area. Contact Entergy at 954-5158 for additional information.
Center -Point Energy: No comment received.
AT & T: No comment received.
3
November 14, 2013
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1713-A
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional
review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and the Little Rock Fire
Department is required.
4. Contact Central Arkansas Water regarding the size and location of the water
meter.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
6. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
7. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
8. The facilities on -site will be private. When meters are planned off private
lines. Private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line agreement is required.
4
November 14, 2013
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1713-A
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
CATA: Directly on the #23 Baseline/Southwest bus route. Contact CATA for
additional information.
Parks and Recreation: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (October 23, 2013)
Mr. Joe White of White Daters and Associates was present representing the
request. Staff presented an overview of the development stating there were few
outstanding technical issues in need of addressing prior to the Commission
meeting. Staff questioned why the plat was indicated with a 45-foot platted
building line as opposed to a 25-foot platted building line which was typically
required in the C-3, General Commercial Zoning District.
Public Works comments were addressed. Staff stated the plat included a
variance to allow the drive located on Lot 2 nearer the property line than typically
allowed. Staff stated the use of the drive would be limited to emergency vehicle
traffic. Staff stated all employees and visitors would access the site via a shared
driveway/access easement located on the common property lines between
Lots 1 and 2. Staff stated right of way dedications and radial dedications would
be required to meet the minimum standards of the Master Street Plan.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing the issues
raised at the October 23, 2013, Subdivision Committee meeting. The plat has
been indicated with a 25-foot front building line as typically required by the zoning
5
November 14, 2013
SUBDIVISION
ITEM NO.: 2
FILE NO.: S-1713-A
district. The plat also indicates the placement of right of way and radial
dedications as required by the Master Street Plan.
The applicant is proposing to amend the previously approved preliminary plat
and to final plat the site into two (2) individual lots. The approval will allow the
placement of a driveway on Lot 2 nearer the property line than typically allowed
by the Subdivision and Boundary Street Ordinances (Sections 30-43 and
31-210).
Lot 2 is proposed to develop with a City of Little Rock Fire Station. Lot 1 has
developed with a retail user; Wal-greens. The lots will be final platted with a
shared driveway on Stagecoach Road between Lots 1 and 2. The customers of
the retail business will continue to use the drive extending from Stagecoach
Road and Baseline Road as access to Lot 1. The employees and visitors of the
fire station (Lot 2) will use the shared access. The driveway on Stagecoach
Road serving Lot 2 will be used by the fire station truck traffic only.
Staff is supportive of the request. Staff does not feel the variance to allow the
placement of the drive nearer the property line than typically allowed will
adversely impact the area.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request from Sections 30-43 and
31-210 to allow the placement of the driveway located on Lot 2 nearer the
property line than typically allowed.
PLANNING COMMISSION ACTION: (NOVEMBER 14, 2013)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request from Sections 30-43 and 31-210 to allow the placement of the driveway located
on Lot 2 nearer the property line than typically allowed.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as recommended by staff. The motion carried by a vote of 8 ayes,
0 noes, 2 absent and 1 open position.
A