HomeMy WebLinkAboutS-1713 Staff AnalysisDecember 3, 2009
ITEM NO.: 7 FILE NO.: S-1644
NAME: Stagecoach Baseline Preliminary Plat
LOCATION: Located on the Northeast Corner of Baseline and Stagecoach Roads
EVELOPER:
USA Drug/Super D
2100 Brookwood Drive
Little Rock, AR 72202
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.37 acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
CURRENT ZONING: C-3, General Commercial District
PLANNING DISTRICT: 16 — Otter Creek
CENSUS TRACT: 42.08
VARIANCES/WAIVERS REQUESTED:
1. A variance from the Land Alteration Ordinance to allow advanced grading of Lot 2
with the construction of a building on Lot 1.
2. A waiver of the stormwater detention ordinance requirements.
A. PROPOSAL/REQUEST:
The property contains 3.37 acres and is located at the northeast corner of
Baseline and Stagecoach Roads. The developer wishes to split the property into
two (2) lots. USA Drug will retain ownership of Lot 1 and will sell Lot 2. A
common access easement for ingress/egress is indicated on the plat. Both
developments will utilize a single driveway apron.
The request includes a variance from the Land Alteration Ordinance to allow
grading of Lot 2 with the construction of a building on Lot 1. The request also
includes a waiver of the City's Stormwater Detention Ordinance requirements.
The property is located adjacent to the Fourche Creek.
December 3, 2009
SUBDIVISION
ITEM NO.: 7 Cont. FILE NO.: S-1544
B. EXISTING CONDITIONS:
The site previously contained two (2) warehouse buildings which have been
removed. The intersection of Baseline and Stagecoach Roads contains a
number of retail uses including.a convenience store with gas pumps, a strip retail
center with a multiple uses including a restaurant and vacant C-3, General
Commercial District zoned property. The eastern boundary is the Fourche
Creek. To the north is an office use. A new Family Dollar Store is currently
under construction on Stagecoach Road further south of this site and a site plan
for a multi -building multi -phased retail center was recently approved to the
southwest of this site on the C-3, General Commercial District zoned property.
AHTD recently constructed Stagecoach Road to a four lane road with turn lanes
at major intersections. There is not a sidewalk in place adjacent to the site.
There is however a marked bike lane. Baseline Road is a two lane road with no
sidewalks in place adjacent to the site.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from the area property
owners. All property owners abutting the site, the Chateaus on Stagecoach
Neighborhood Association, the Otter Creek Homeowners Association and
Southwest Little Rock United for Progress were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required. Where
a principal arterial street intersects a principal arterial street, the subdivider
shall dedicate an additional 10 feet of right-of-way, measured from the
centerline of the right-of-way for a right turn lane. This additional right-of-
way shall be along the entire Baseline Road frontage to the bridge.
2. At Stagecoach and Baseline Roads, due to the principal arterial -principal
arterial intersection, right-of-way shall be dedicated to a radius of 75 feet at
the intersection.
3. Stagecoach Road is classified on the Master Street Plan as a principal
arterial. Dedication of right-of-way to 55 feet from centerline will be required.
4. Sidewalks with appropriate handicap ramps are required to be installed
along Stagecoach Road in accordance with Section 31-175 of the Little
Rock Code and the Master Street Plan.
2
December 3, 2009
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: S-1644
5. The code requires with site development, construction of one-half street
improvement to Baseline Road including a right turn lane and 5-foot
sidewalks with the planned development. Due to Baseline Road being a
State Highway and controlled by the Arkansas Highway and Transportation
Department; the length of the required improvements, its relationship with
the bridge and the intersection, staff believes the improvements will not be .
permitted by the Arkansas Highway and Transportation Department and
therefore the improvements cannot be constructed.
6. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
7. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
8. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction.
9. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
10. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
11. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
12. The minimum Finish Floor elevation of at least one (1) foot above the base
flood elevation is required to be shown on plat and grading plans.
13. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide access easement is required adjacent to the floodway boundary.
14. Due to possible bridge obstructions, provide a letter prepared by a
registered engineer certifying the sight distance at the proposed driveway
on Baseline Road complies with 2004 AASHTO Green Book standards.
15. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade
permit prior to doing any work in the right-of-way. Contact Traffic
Engineering at (501) 379-1805 (Travis Herbner) for more information.
16. Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818)
for the private improvements located in the right-of-way.
3
December 3, 2009
SUBDIVISION
ITEM NO.: 7 Cont.) FILE NO.: S-1
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available for this property on the west side of Stagecoach
Road. Contact Little Rock Wastewater Utility for additional information.
Enter : No comment received.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capitol Investment Charge
is applicable to all connections off the waterlines along Hwy 5. The Little Rock
Fire Department needs to evaluate this site to determine whether additional
public and/or private fire hydrant(s) will be required. If additional fire hydrant(s)
are required, they will be installed at the Developer's expense. Please submit
plans for water facilities and/or fire protection system to Central Arkansas Water
for review. Plan revisions may be required after additional review. Contact
Central Arkansas Water regarding procedures for installation of water facilities
and/or fire service. Approval of plans by the Arkansas Department of Health
Engineering Division and Little Rock Fire Department is required.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
F. ISSUESfTECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT:
(November 12, 2009)
The applicant was not present. Staff presented the item stating there were few
outstanding technical issues in need of addressing prior to the Commission
acting on the request. Public Works staff noted the applicant would be required
to work with AHTD on the allowable street improvements at the intersection of
Baseline and Stagecoach Roads. Staff stated the improvements indicated were
per the Master Street Plan and with the location of the existing bridge on
0
December 3, 2009
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: S-1644
Baseline Road staff was not sure AHTD would allow the improvements as
indicated.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
There were no outstanding technical issues in need of addressing raised at the
November 12, 2009, Subdivision Committee meeting. The applicant is seeking
preliminary plat approval to allow two (2) commercial lots from this 3.37 acre
tract. Lot 1 is indicated containing 1.92 acres and Lot 2 containing 1.46 acres.
The property is zoned C-3, General Commercial District which requires a
minimum lot area of 14,000 square feet. The lot widths proposed exceed the
typical minimum lot width of the Zoning District of 100 feet. Lot 2 is indicated with
a lot width of approximately 175 feet. Lot 1 is indicated with over 300 feet of
frontage on both Baseline and Stagecoach Roads. The plat is indicated with a
45-foot front building line along the abutting roadways. The Zoning District
typically requires the placement of a 25-foot front building line.
Staff does not support an in -lieu payment for stormwater detention. Recently,
staff has not supported detention variances from two (2) developments and
preliminary plats upstream of this site on Fourche Creek. Those locations were
on the southeast corner of Otter Creek Road and Stagecoach Road and on the
southeast corner of Baseline and Stagecoach Roads. The site is in the upper
portion of the Fourche Creek watershed in relation to the City of Little Rock.
Public Works receives a number of drainage complaints along Fourche Creek.
Staff believes stormwater detention should be provided on site.
Staff is supportive of the preliminary plat request but not of the request for the
in -lieu payment for stormwater detention. The proposed plat appears to comply
with the development standards of the Subdivision Ordinance and the C-3,
General Commercial Zoning District. To staff's knowledge there are no
remaining outstanding technical issues associated with the request. Staff feels
the creation of two (2) commercial lots on the site will not adversely impact the
area.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comment and conditions as outlined in paragraphs ❑, E and F of the agenda staff
report.
Staff recommends stormwater detention be provided on the site.
5
December 3, 2009
SUBDIVISION
ITEM NO.: 7 (Cont.
FILE NO.: S-1
PLANNING COMMISSION ACTION: (DECEMBER 3, 2009)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff also presented a recommendation that stormwater
detention be provided on the site.
There was no further discussion of the item. The chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 9 ayes,
0 noes, 0 absent and 2 open positions.
9
ITEM NO.- 7
NAME: Stagecoach Baseline Preliminary Plat
S-1644
LOCATION: located on the Northeast Corner of Baseline and Stagecoach Roads
Planning Staff Comments:
1. Provide notification of all abutting property owners, complete with the certified
abstract list, notice form with affidavit executed and proof of mailing. The notice
must be mailed no later than November 19, 2009. The Office of Planning and
Development must receive the proof of notice no later than November 25, 2009.
2. Provide the source of title of the land owner in the general notes section of the
preliminary plat.
Variance/Waivers,
1. A variance from the Land Alteration Ordinance to allow advanced grading of Lot 2
with the construction of a building on Lot 1.
2. A waiver of the stormwater detention ordinance requirements.
Public Works Conditions:
1. Baseline Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required. Where a
principal arterial street intersects a principal arterial street, the subdivider shall
dedicate an additional 10 feet of right-of-way, measured from the centerline of
the right-of-way for a right turn lane. This additional right-of-way shall be along
the entire Baseline Road frontage to the bridge.
2. At Stagecoach and Baseline Roads, due to the principal arterial -principal arterial
intersection, right-of-way shall be dedicated to a radius of 75 feet at the
intersection.
3. Stagecoach Road is classified on the Master Street Plan as a principal arterial.
Dedication of right-of-way to 55 feet from centerline will be required.
4. Sidewalks with appropriate handicap ramps are required to be installed along
Stagecoach Road in accordance with Section 31-175 of the Little Rock Code and
the Master Street Plan.
5. The code requires with site development, construction of one-half street
improvement to Baseline Road including a right turn lane and 5-foot sidewalks
with the planned development. Due to Baseline Road being a State Highway
and controlled by the Arkansas Highway and Transportation Department; the
length of the required improvements, its relationship with the bridge and the
intersection, staff believes the improvements will not be permitted by the
Arkansas Highway and Transportation Department and therefore the
improvements cannot be constructed.
6. Repair or replace any curb and gutter or sidewalk that is damaged in the public
Item # 7.
right-of-way prior to occupancy.
7. Plans of all work in right-of-way shall be submitted for approval prior to start of
work. Obtain barricade permit prior to doing any work in the right-of-way from
Traffic Engineering at (501) 379-1805 (Travis Herbner).
8. A grading permit in accordance with Section 29-186 (c) and (d) will be required
prior to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved
prior to the start of construction.
9. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
10. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
11.A special Grading Permit for Flood Hazard Areas will be required per Section 8-
283 prior to construction.
12. The minimum Finish Floor elevation of at least 1 foot above the base flood
elevation is required to be shown on plat and grading plans.
13.In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25 foot wide access
easement is required adjacent to the floodway boundary.
14. Due to possible bridge obstructions, provide a letter prepared by a registered
engineer certifying the sight distance at the proposed driveway on Baseline Road
complies with 2004 AASHTO Green Book standards.
15.Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit
prior to doing any work in the right-of-way. Contact Traffic Engineering at (501)
379-1805 (Travis Herbner) for more information.
16.Obtain a franchise agreement from Public Works (Bennie Nicolo, 371-4818) for
the private improvements located in the right-of-way.
Utilities and Fire Department/County Planning:
Wastewater: Sewer available for this property on the west side of Stagecoach Road.
Contact Little Rock Wastewater Utility for additional information.
Entergy: No comment received.
Center -Point Energ : No comment received.
AT & T: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capitol Investment Charge is applicable to
all connections off the waterlines along Hwy 5. The Little Rock Fire Department needs
to evaluate this site to determine whether additional public and/or private fire hydrant(s)
will be required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Please submit plans for water facilities and/or fire protection
system to Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures for installation
of water facilities and/or fire service. Approval of plans by the Arkansas Department of
Item # 7.
Health Engineering Division and Little Rock Fire Department is required.
Fire Department: Approved as submitted.
County Planning: No comment.
CATA: The site is not located on a dedicated CATA Bus Route.
Plannina Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, November 19, 2009.
Item # 7.