Loading...
HomeMy WebLinkAboutS-1676 ApplicationPLANNING COMMISSION REVIEW CENTRAL ARKANSAS WATER 15 September 2011 NAME TYPE ISSUE COMMENTS 5700 WEST MARKHAM, POD POD Z-8699 All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. 2601 WEST 13TH ST., PD-R PDR Z-8697 All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. NAM E TYPE ISSUE COMMENTS 7621 WEST 40TH ST.; DELTA POD Z-8696 PRESENTS OUTREACH All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. NAME TYPE ISSUE COMMENTS GULLEY PD-R, 11511 GARRISON PDR Z-8695 RD CAW DOESN'T HAVE A WATER MAIN IN GARRISION ROAD; WATER COULD POSSIBLE BE OBTAINED FROM MAUMELLE WATER CORP. A water main extension will be needed to provide water service to this property FROM HWY 10. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. NAME TYPE ISSUE COMMENTS JAMES MORGAN SUBD, REV. PDR S-1607-A CAW DOESN'T HAVE A WATER MAIN IN PRELIM. PLAT; 9723 BARRETT BARRETT ROAD; WATER COULD RD POSSIBLE BE OBTAINED FROM MAUMELLE WATER CORP. A water main extension will be needed to provide water service to this property FROM HWY 10. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire pro,tection. All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. 4 NAME TYPEISSUE LR BLACK POLICE OFFICERS POD Z-8698 ASSC; 2521 S. ARCH ST. COMMENTS All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. NAME TYPE ISSUE COMMENTS FIDELITY INFORMATION SITE PLAN Z-2959-1 All Central Arkansas Water requirements in SERVES ZONING / 4001 N effect at the time of request for water service RODNEY PARHAM must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. 0 NAME WILDWOOD SUB SEC A LOT 1 / SE 16723 CANTRELL RD TYPE ISSUE COMMENTS POD Z-7325-A All Central Arkansas Water requirements in effect at the time of request for water service must be met. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. NAME TYPE ISSUE COMMENTS DENNIS PROPERTIES / 11421 PCD Z-7786-B All Central Arkansas Water requirements in STAGECOACH RD effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. .F_1�114 LOT 9, GLENN RIDGE CROSSING; SWC OF COL. GELNN PLAZA DR (INT. AREA OF COL GLENN PLAZA LOOP) TYPE ISSUE COMMENTS PCD Z-3371-JJ All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. NAME TYPE ISSUE COMMENTS LOT 15, THE SHOPPES AT COL. PCD Z-3371-KK All Central Arkansas Water requirements in GLENN RIDGE CROSSING; NEC effect at the time of request for water service OF COL. GELNN PLAZA DR must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. - Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 10 NAME TYPE ISSUE COMMENTS PEDIATRICS PLUS PD-O; WEST POD Z-8701 All Central Arkansas Water requirements in SIDE OF ALDERSGATE BTW effect at the time of request for water service 18TH & 20TH must be met. A water main extension will be needed to provide water service to this property. This development will have minor impact on the existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. The facilities on -site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation 11 NAME TYPEISSUE COMMENTS of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 12 NAME TYPE ISSUE COMMENTS ST. VINCENT'S HEALTH SYSTEMS POD; 5508 - 5520 WEST MARKHAM ST POD Z-8700 All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 13 NAME TYPE ISSUE COMMENTS MAGNOLIA TERRACE ADD; REV POD Z-5817-D All Central Arkansas Water requirements in POD; 15104 CANTRELL RD effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 14 NAME TYPE ISSUE EASTER SEALS ADULT PCD Z-5139-F TRAINING AND WELLNESS CENTER; 14901 CANTRELL RD COMMENTS All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 15 NAME TYPE ISSUE COMMENTS DRIVE THRU, PCD Z-4745-A SHACKLEFORD/KANIS PCD; SEC KANIS & SHACKLEFORD All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. i[y NAME TYPE ISSUE COMMENTS JIMMY JOHN'S SHORT FORM PCD Z-8501-A All Central Arkansas Water requirements in PCD; 112 S. UNIVERSITY AVE effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service, This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. 17 NAME TYPEISSUE DOBBINS ADDTN PRELIM/FINAL PRE -PLAT S-1676 PLAT; 12203 HILARO SPRINGS RD COMMENTS All Central Arkansas Water requirements in effect at the time of request for water service must be met. LOT 2 WILL NO LONGER HAVE FRONTAGE ON A PUBLIC WATER MAIN, THEREFORE, A SHORT WATER MAIN EXTENSTION WILL BE REQUIRED TO PROVIDE WATER SERVICE TO LOT 2. CONTACT CAW FOR MAIN EXTENSION REQUIRMENTS. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. If there are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That work would be done at the expense of the developer. FE. oo , R2 Ea $ d 0 n 4 _ u o�o c 3 o L� NSO o=1 Q ao 0 a � ❑ o -T, 9 0 � o 0 ❑ o e {1� •❑ 0 0 El o 1=3 ( �❑ v `Fk�MGS £3 `' ❑o° Not Zoning a 0 o p 0 a o r� o� 00 �o 0 0 0 GRANT Cl Area Zoning Case: S-1676 N Location: 12203 Hilaro Springs Road Ward: na PD: 14 CT: 40.06 TRS: T1S R12W17 IA 0 200400 800 Feet � -r-2 '41 'k. -4 �scl 0 :1 i sa ar p $,6. Ri IR N ! 2 4F 411-7.; sp. i" t i q6�7 i I III R fit 54� S-1676 40 12203 HILARO SPRINGS ROAD PRELIM/FINAL PLAT DOBBINS ADDITION Et City of Little Rock Department of Planning and Development . 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 October 7, 2011 Veronica L. Dockery 12203 Hilaro Springs Road Little Rock, AR 72206 Planning Zoning and Subdivision Re: Dockery Addition Combination Preliminary/Final Plat, located at 12203 Hilaro Springs Road (S-1676) Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on October 6, 2011: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. X Deferred to the _November 17, 2011 Meeting. Other: If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator stewart title To Whom It May Concern: Re: Dockery, 12203 Hilaro Springs Rd. subdividing issue Arkansas Division 11300 N. Rodney Parnham Rd., Suite 10 Little Rock, AR 72212 (501) 228-0493 (501) 228-4081 fax www.stewartarkansas.co m Eric and Veronica Dockery did not create a subdivision using their property at 12203 Hilaro Springs Rd. I.tt:ie Rock, AR 72206. The action was to create separa-e parcel numbers for a piece of their land which has not been subdivided. T.h:.i_s was so that the Dockery's could refinance their zrortgage on their hoTM:e. Sincerely, I i.coie Bailey`' City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 November 18, 2011 Veronica L. Dockery 12203 Hilaro Springs Road Little Rock, AR 72206 Re: Dockery Addition Combination Preliminary/Final Plat, located at 12203 Hilaro Springs Road (S-1676) Dear Sirs: This is to advise you that in connection with your request concerning the above referenced file number the following action was taken by the Planning Commission at its meeting on November 17, 2011: Approved with conditions. Recommended approval with conditions. Recommended approval as submitted. Denied your request as submitted. Deferred to the Meeting. X Other: withdrew your request If you have any questions concerning any other matter please do not hesitate to contact me at 371-6821. Respectfully, Donna James, AICP Subdivision Administrator City of Little Rock Department of Planning and Develapment- 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 DATE: August 29, 2011 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning Little Rock Fire Department Public Works: En ineering Traffic (2) Planning Zoning and Subdivision NAME: Dobbins Addition Combination Preliminary/Final Plat TYPE OF ISSUE: Subdivision — Single-family lot w/o public street frontage FILE NUMBER: S-1676 LOCATION: 12203 Hilaro Springs Road • g , Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On October 6, 2011 the Little Rock Planning Commission will consider the above referen�be'd'issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on September 9. 2011. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on September 1515, 2011. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Don awes, AICP Subdivision Administrator (Please res and below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY September 12, 201112, 2011. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. r& By: Mot L'o hnL.w51 �--P(&L H ►%._- Enclosure _ _ E E O 0 u � _ _ •� � L L a Q. a R R V v H H H _ _ C a 3 3 a=.+ O O m m � rw t00 0 0 0 0 . H H _ > R � R H vs sa ea E E E E E a_ d a a a E_ E= c =_ E_ O d �; o d o 0 o 0 0 0 o 0 R R v E v E v E O E O E v E v E +� _ = a a N V a a 1% m c. v a z c. a s d sa d 0 al d o m 0 d o d o m o d 0 •L ,L ,L _ .0 c d = .0 c m m a a� = d c m c d R O R O R 0 R O R O R O R 0 d d a N a 0 N a s d a a 0 d a d a d a m C 0 y H C O C 0 0 O V N '_ C 0 'N .> H = 0 w R Im 'a_ Q R a a �, a - "a d R_ i1 C '°a E H 0 'a H 'C i 0 c.0 = C- H C Z 0 0 Q O w+ w C C = Q. ++ O 0 R v .0 L s O ,y y R (Ad v 0 N 0 C 0 C d N 0 C {a C ,O 0 m 0 O IL N >' Q) d> 'C d 0 y = Y u d ++ ,_ d ++ Cc = w r 3 '= E J W J� '7 V) 0 V Y. N u F- C9 N H t� � a a '� QJ Y ti d ti O �0 P 0 1n r n n u� Iq CD m r u> N fD co r 0 W W O) M M f- r 00 M P� Ln i r r V) N M M in Ln N n ti N 0 N �.� y N IV N N IV fV City of Little Rock Department of Planning and Development Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Subdivision DATE: August 29, 2011 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning Little Rock Fire Department Public Works: En ineering Traffic (2) NAME: Dobbins Addition Combination Preliminary/Final Plat TYPE OF ISSUE: Subdivision — Single-family lot w/o public street frontage FILE NUMBER: S-1676 LOCATION: 12203 Hilaro Springs Road g Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On October 6, 2011 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on September9_. 2011. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on September 15, 2011. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerel y' Donlae ames, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY September 12 2011. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. 1 By: Enclosure City of Little Rock Department of Planning and DevAlapm'&ant Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 101, 'e(e DATE: August 29, 2011 �i �py�J• :Dobbins Addition Combination Preliminary/Final Plat Entergy (2) X I� El Center Point - ARKL j �O ISSUE: Subdivision — Single-family lot w/o public street outage ❑ AT & T (2) ❑ Central Arkansas W ter j E NUMBER: S-1676 ❑ Little Rock Wastewat ❑ Pulaski County Planning LOCATION: 12203 Hilaro Springs Road ❑ Little Rock Fire Department ❑ Public Works: Engineering, Traffic (2) ❑ Parks and Recreation Department ❑ Planning and Development — Site Plan Review ❑ Planning and Development Graphics ❑ CATA TO WHO IT MAY CONCERN: On October 6, 2011 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on September 9 2011. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on September 15, 2011. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Dorin-wJames, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY September 12, 2011. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. Comments: By: Enclosure ts City of Little Rock Department of Planning and Developnient- 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 DATE: August 29, 2011 Entergy (2) Center Point - ARKLA AT & T (2) Central Arkansas Water Little Rock Wastewater Pulaski County Planning Little Rock Fire Department Public Works• En ineerin Traffic (2) Planning Zoning and Subdivision NAME: Dobbins Addition Combination Preliminary/Final Plat TYPE OF ISSUE: Subdivision — Single-family lot w/o public street frontage FILE NUMBER: S-1676 LOCATION: 12203 Hilaro Springs Road g g, Parks and Recreation Department Planning and Development — Site Plan Review Planning and Development Graphics CATA TO WHO IT MAY CONCERN: On October 6, 2011 the Little Rock Planning Commission will consider the above referenced issue. NOTE: The Interdepartmental Meeting at which this issue will be discussed will be held on September 9 2011. NOTE: The Subdivision Committee Meeting at which this issue will be discussed will be held on September 15, 2011. A copy of the plan for the referenced issue is enclosed for your consideration, and your comments and/or recommendations will be appreciated. Sincerely, Don ames, AICP Subdivision Administrator (Please respond below and return this letter with your comments for our records.) Approved as Submitted. PLEASE RETURN COMMENTS BY September 12, 2011. Easement (s) required (See attached plat or description.) *To all utilities: If an easement is requested which is in excess of 10 feet in width, provide justification for the easement or the request will not be included in the Planning Commission agenda. Comments: By: Enclosure City of Little Rock 13 Departmento ann:ng an Development Planning Zoning and 723 West Markham Subdivision Little Rock, Arkansas 72201-1334 (501) 371-4790 FAX COVER SHEET DATE: ")—4� — /! TO: COMPANY: FAX NUMBER: PHONE NUMBER: FROM: DIVISION: '5te5y LA-- 7 FAX NUMBER: (501) 399-3435 PHONE NUMBER: (501)� TOTAL NUMBER OF PAGES INCLUDING COVER SHEET: COMMENTS: I w-M 1 j � /7 n r � City of Little Rock Department of Planning and Development. 723 West Markham Street Little Rock, Arkansas 72201-1334 Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 Planning Zoning and Subdivision NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: August 30, 2011 TO: Ms. Pat Gee Southwest Little Rock United for Pro ess ADDRESS: 8409 Dowan Drive Little Rock, AR 72209 REQUEST: Dockery Addition Combination Prelimin /Final Plat S-1676 a request to allow the creation of a second lot from this exisfiRg parcel. The lot is being created as a lot without public street frontage. GENERAL LOCATION OR ADDRESS: located at 12203 Hilaro Springs Road__ OWNED BY/APPLICANT: Veronica L. Dockery NOTICE IS HEREBY GIVEN THAT an application for a Preliming (Final Plat of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.R. Planning Commission in the Little Rock Board of Directors Chambers, second floor, City Hall, 500 West Markham Street, on October 6, 2011 at 4:00 P.M. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development City of Little Rock Department of Planning and Development`' Planning 723 West Markham Street Zoning and Little Rock, Arkansas 72201-1334 Subdivision Phone: (501) 371-4790 Fax: (501) 399-3435 or 371-6863 NOTICE OF PUBLIC HEARING BEFORE THE LITTLE ROCK PLANNING COMMISSION ON A REQUEST FOR A USE CHANGE OR DEVELOPMENT OF LAND DATE: October 11, 2011 TO: Ms. Pat Gee Southwest Little Rock United for Projuess ADDRESS- 8409 Dowan Drive Little Rock AR 72209 REQUEST: Docke Addition Combination Prelimina (Final Plat S-1576 a re uest to allow the creation of a second lot from this existing arcel. The lot is being created as a lot without public street frontage. GENERAL LOCATION OR ADDRESS: located at 12203 Hilaro Springs Road OWNED BY/APPLICANT: Veronica L. Docker NOTICE IS HEREBY GIVEN THAT an application for a Planned Zoning Development of the above property has been filed with the Department of Planning and Development. A public hearing will be held by the L.A. Planning Commission in the Little Rock Board of Directors Chambers, second floor, City Hall, 500 West Markham Street, on November 17, 2011 at 4:00 P.M. You were previously notified of this application request. This item was deferred from the October 6, 2011, public hearing to this new hearing date. This notice is provided in order to assure that neighborhood associations are aware of issues that may affect their neighborhood. Information requests should be directed to the Planning staff at 371-4790. Tony Bozynski Director of Planning and Development DOCKERY ADDITION) To: The Public ) BILL OF ASSURANCE Whereas Veronica L. Dockery is the sole owner of the following described property: PART OF THE NORTHWEST CORNER OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 17, TOWNSHIP 01 SOUTH, RANGE 12 WEST, PULASKI COUNTY, ARKANSAS, BEGINNING AT THE NORTHWEST CORNER OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER; THENCE NORTH 86 DEGREES 51 MINUTES 01 SECONDS EAST 858.39 FEET TO A POINT; THENCE SOUTH 04 DEGREES 24 MINUTES 24 SECONDS EAST 149.83 FEET TO A POINT; THENCE SOUTH 86 DEGREES 51 MINUTES 04 SECONDS WEST 869.76 FEET TO A POINT ON THE WEST LINE OF THE SAID NORTHWEST QUARTER OF THE NORTHWEST QUARTER; THENCE NORTH 00 DEGREES 03 MINUTES 48 SECONDS WEST 150.00 FEET ALONG THE SAID WEST LINE TO THE POINT OF BEGINNING, CONTAINING 2.97 ACRES MORE OR LESS. NOW, THEREFORE, WITNESSETH: That Uwe, the said owner(s), hereinafter termed grantor(s) have caused said tract of land to be surveyed by Marion Scott Foster Professional Surveyor, and a plat thereof made which is identified by the title Dockery Addition and the date July 27, 2011 and by the signature of the said surveyor and the said grantors(s) and bears a Certificate of Approval executed by the City of Little Rock Planning Commission, and is on record in the Office of the Circuit Clerk and ex- officio Recorder of Pulaski County, Arkansas, in Plat Book Page and the grantor(s) do hereby make this Bill of Assurance. The grantor(s) do hereby certify that they have platted said real estate in accordance with said plat. The lands embraced in said plat shall be forever known as designed on said plat; and every deed of conveyance for said property shall use this designation. The filing of this Bill of Assurance and plat for record in the office of the Circuit Clerk and ex- officio Recorder of Pulaski County shall be a valid and complete delivery and dedication of the streets and easements shown on the said plat. All buildings constructed on said lots shall be constructed no nearer to the street than the building line shown on the plat, and all buildings shall be constructed in conformance with the Building Code and Zoning Ordinances of the City of Little Rock, Pulaski County, Arkansas. WITNESS, our hands this ACKNOWLEDGEMENT STATE OF ARKANSAS ) COUNTY OF PULASKI ) k I Clay of 20 BE IT REMEMBERED that on this day came before me a Notary Public within and for the County and State aforesaid, the undersigned stated that he/she/they had executed the foregoing Bill of Assurance. Notary Public My Commission Expires: Prepared by: Name: Address: and and