HomeMy WebLinkAboutS-1665-F Application� M,
Thomas R. Pownall
From: Jonathan Long <Jonathan.Long @carkw,com>
Sent: Wednesday, August 31, 2016 8:34 AM
To: Thomas R Pownall; Vincent Hotho; Joni Bates; Chris Green; THEODIS THOMPSON
Subject: RE: Wildwood Ridge Phase 3 Plat
CAW is ok with this
From: Thomas R. Pownall Wsto:thomaseth!)masengin ri pvo.comJ
Sent: Tuesday, August 30, 2016 4:44 PM
To: Vincent Hotho; Joni Bates; Chris Green; Jonathan Long; THEODIS THOMPSON
Subject: Wildwood Ridge Phase 3 Plat
All:
Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for
filing. Please let me know if you have comments or if you approve. An email is fine.
Thank you
Thomas R. Pownall, P.E.
Thomas Engineering Company
501,753.4463
501.753,6814 Fax
501.351.6695 Cell
Thomas R. Pownall
From: THOMPSON, THEODIS <TTHOMP1@entergy,com>
Sent: Wednesday, August 31, 2016 8:48 AM
To: Thomas R. Pownall
Subject: RE: Wildwood Ridge Phase 3 Plat
Entergy is ok with this,
Theodis Thompson
From: Thomas R. Pownall rmailtaahomas@thamaseng ring2000.mmj
Sent: Tuesday, August 30, 2016 4:44 PM
To: Vincent Hotho; Joni Bates; Chris Green; Jonathan Long; THOMPSON, THEODIS
Subject: Wildwood Ridge Phase 3 Plat
EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide
your user ID or password.
All:
Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for
filing. Please let me know if you have comments or if you approve. An email is fine.
Thank you
Thomas R. Pownall, P.E.
Thomas Engineering Company
501,753.4463
501.753.6814 Fax
501,351.6695 Cell
LAwwU
Thomas R. Pownall
From: Vincent Hotho <Steven.Hotho@Inau.com>
Sent: Wednesday, August 31, 2016 8:49 AM
To: Thomas R. Pownall; Joni Bates; Chris Green; Jonathan Long; THEODIS THOMPSON
Subject: RE: Wildwood Ridge Phase 3 Plat
Thomas,
I see the 10' easement Ilne along the streets, and I see the General Note No. 7, but I believe it would be a good idea to
actually label the easement line(s) on the drawing. Other than that, LRW is OK with the plat.
S. Vincent Hotho, P.E.
Program Supervisor
Little Rock Wastewater Utility
Ofc: 501.688.1452
M bl: 501-44 2.6042
From: Thomas R. Pownall[Mal Ito: thOmas6Dthomasengine erinA2000.comJ
Sent; Tuesday, August 30, 2016 4:44 PM
To: Vincent Hotho <Steven.Hot ho@lrwu.gp >; Joni Bates a' ni.hates center intene r m>; Chris Green
<Chris- reen6Dcarkw.mm>; Jonathan Long <Jgnathan.LonA@rarkw.com>; THEODIS THOMPSON
<TTHOMP10entetnv.cor�r >
Subject: Wildwood Ridge Phase 3 Plat
All:
Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for
filing. Please let me know if you have comments or if you approve. An email is fine.
Thank you
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753,6814 Fax
501.351,6695 Cell
(E j-Kxpot.IT
Thomas R. Pownall
From: Bates, Joni B. <joni.bates@centerpointenergy.com>
Sent: Wednesday, August 31, 2016 9:17 AM
To: thomas@thomasengineering2000.com
Subject: FW: Wildwood Ridge Phase 3 Plat
See comments
From: Fuentes, Kenneth W
Sent: Wednesday, August 31, 2016 7:22 AM
To: Bates, Joni B.
Subject: RE: Wildwood Ridge Phase 3 Plat
Joni,
I see no conflict with the proposed plat
Thanks,
Kenneth W. Fuentes
Engineer I
_&w mCla&Opprnlianc 1 Region
401 w Vcpa01 AVO. 50e 000 1 Lnpe RvakJ AR 12201
<)Vco: 5013774600 I F?x. 501 V7-s730 I Mottle501-516-9565
IN n n1 nn1 rr,
,•,� CeRterPoint
6Jeryy
From: Bates, Joni B.
Sent: Tuesday, August 30, 2016 5:41 PM
To: Fuentes, Kenneth W
Subject: FW: Wildwood Ridge Phase 3 Plat
They are requesting a review and approval please.
Thanks, Joni
From: Thomas R. Pownall [Mai Ito:thamas h ma gi rin ]
Sent: Tuesday, August 30, 2016 4:44 PM
To: Vincent Hotho; Bates, Joni B.; Chris Green; Jonathan Long; THEODIS THOMPSON
Subject: Wildwood Rldge Phase 3 Plat
All:
Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for
filing. Please let me know if you have comments or if you approve. An email is fine.
Thank you
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351,6695 Cell
***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links
or opening attachments from unknown sources. *****
James, Donna
From: Floriani, Vince
Sent: Wednesday, October 5, 2016 11:46 AM
To: James, Donna;-thomas@thomasengineering2000.com
Subject: Wildwood Ridge III Final Plat
Attachments: CCE10052016.pdf
Public Works is OK to sign off on final plat.
Vince
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: WILDWOOD RIDGE PHASE 3
INSPECTOR REPORT
!t.'h� YG► C.1f�A�'x~ Y PFwrJ.ya7c+?
1 have made a final inspection of the improvements and find that: r ���f'� S 1rh[.� - 7 �� pig
+/ All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list hex been prepared and sent.
Engineering Specialist
ADDRESSING SPECIALIST REPORT
I have reviewed the plat aad find that the street names and street configuration are acceptable.
AddressingSpacialist 0aic:_-7
A
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
c n1 tmancc with City requirementsandards.
strtaet signs should be ardctrd and billed to developer. Work orders have been prepared for signage,
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
��-- Traffic Engineer 17n[e ql2•��]�
CIVIL ENGINEER REPORT
I have revjewed the file for this matter and rind that:
t// The maintenance bond has been submitted and it is the proper type and % -iount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic fornt have been submitted.
All other requirements for final plat approval have been satisfied. 1
Civil Engineer 1/II
SURVEYOR REPORT
I have reviewed the plat and find that:
All "1111emants for final plat approval have been satisfied.
Surveyor Date: 9;29 "f
HAYALFR APPROVAL
All Civil =ngin ng requlrent n[s for filing this final plat have been satisfied.
Design _view Enbineer.Civil Eal;bWring Manager
Eneclivc: Sept 29, 2016
�.
V
•w
i
r i I�
?3
I�
I
1
_ �. GaRDpry ROAtl _
Yrl.
_•il i.+ 'I 'i i z 'i i I L 'G .. I' f� liij
ei o N f l �..��5pxanEtaG S ��1� i� ... a 1! -•n
L—___— --_---
3N� — —
(ifis !
�
a � °'
° p d r I il'� '1'1• !��
p �a �•L.,,.� eGpo °° o I I Ei;f�
01
0
-
n
rE N yX eQ
O ;• Y� I! is
3 S z
'e $
1
�
l
=
James, Donna
From: Floriani, Vince
Sent: Monday, September 26, 2016 11:04 AM
To: James, Donna; Harper, Vance
Subject: FW: Wildwood Ridge Plat and Record Drawings
Attachments: WILDWOOD RIDGE 3-GORDON RD RECORD.pdf, WILDWOOD RIDGE 3-GORDON CR
RECORD.pdf; PLAT FOR REVIEW.pdf; WildwoodRidge3CityForm.pdf;
WildwoodRidgeReviewForm.pdf
Please review the proposed plat.
Thanks,
Vince Floriani, P.E.
Little Rock Public Works -Civil Engineering
701 W. Markham St.
Little Rock, Arkansas 72201
501-371-4817
From: Thomas R. Pownall[mailto:thomas@thomasengineering2000.com]
Sent: Tuesday, September 20, 2016 3:18 PM
To: Floriani, Vince
Cc: Charles, Nathan
Subject: Wildwood Ridge Plat and Record Drawings
Vince and Nathan,
Attached is the plat for your review. Also attached are the record drawings and wall certification.
If the record drawings are what you want, I can bring hard copies to your office. I will also bring the maintenance bond.
Let me know if all of this meets approval.
Thank you, gentlemen.
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351.6695 Cell
City of Little Rock
Planning and Development
Filing Fees
Date , 201L
Annexation
Board of Adjustment
Cond Use Permit/T UP
Final Plat
Planned Unit Dev
Preliminai y Plat
Special Use Permit
Rezoning
Site Plans
Street Name Change
Street Na e Signs
N umberw:? a
Public Hearing Signs.
Number -at -ea
File No
$ '
S
$ OCT Q 6 Z016
$ ILE ROCK
SUiLQING CODE
Total $ -
Location
Applicant h _