Loading...
HomeMy WebLinkAboutS-1665-F Application� M, Thomas R. Pownall From: Jonathan Long <Jonathan.Long @carkw,com> Sent: Wednesday, August 31, 2016 8:34 AM To: Thomas R Pownall; Vincent Hotho; Joni Bates; Chris Green; THEODIS THOMPSON Subject: RE: Wildwood Ridge Phase 3 Plat CAW is ok with this From: Thomas R. Pownall Wsto:thomaseth!)masengin ri pvo.comJ Sent: Tuesday, August 30, 2016 4:44 PM To: Vincent Hotho; Joni Bates; Chris Green; Jonathan Long; THEODIS THOMPSON Subject: Wildwood Ridge Phase 3 Plat All: Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for filing. Please let me know if you have comments or if you approve. An email is fine. Thank you Thomas R. Pownall, P.E. Thomas Engineering Company 501,753.4463 501.753,6814 Fax 501.351.6695 Cell Thomas R. Pownall From: THOMPSON, THEODIS <TTHOMP1@entergy,com> Sent: Wednesday, August 31, 2016 8:48 AM To: Thomas R. Pownall Subject: RE: Wildwood Ridge Phase 3 Plat Entergy is ok with this, Theodis Thompson From: Thomas R. Pownall rmailtaahomas@thamaseng ring2000.mmj Sent: Tuesday, August 30, 2016 4:44 PM To: Vincent Hotho; Joni Bates; Chris Green; Jonathan Long; THOMPSON, THEODIS Subject: Wildwood Ridge Phase 3 Plat EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide your user ID or password. All: Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for filing. Please let me know if you have comments or if you approve. An email is fine. Thank you Thomas R. Pownall, P.E. Thomas Engineering Company 501,753.4463 501.753.6814 Fax 501,351.6695 Cell LAwwU Thomas R. Pownall From: Vincent Hotho <Steven.Hotho@Inau.com> Sent: Wednesday, August 31, 2016 8:49 AM To: Thomas R. Pownall; Joni Bates; Chris Green; Jonathan Long; THEODIS THOMPSON Subject: RE: Wildwood Ridge Phase 3 Plat Thomas, I see the 10' easement Ilne along the streets, and I see the General Note No. 7, but I believe it would be a good idea to actually label the easement line(s) on the drawing. Other than that, LRW is OK with the plat. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 M bl: 501-44 2.6042 From: Thomas R. Pownall[Mal Ito: thOmas6Dthomasengine erinA2000.comJ Sent; Tuesday, August 30, 2016 4:44 PM To: Vincent Hotho <Steven.Hot ho@lrwu.gp >; Joni Bates a' ni.hates center intene r m>; Chris Green <Chris- reen6Dcarkw.mm>; Jonathan Long <Jgnathan.LonA@rarkw.com>; THEODIS THOMPSON <TTHOMP10entetnv.cor�r > Subject: Wildwood Ridge Phase 3 Plat All: Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for filing. Please let me know if you have comments or if you approve. An email is fine. Thank you Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753,6814 Fax 501.351,6695 Cell (E j-Kxpot.IT Thomas R. Pownall From: Bates, Joni B. <joni.bates@centerpointenergy.com> Sent: Wednesday, August 31, 2016 9:17 AM To: thomas@thomasengineering2000.com Subject: FW: Wildwood Ridge Phase 3 Plat See comments From: Fuentes, Kenneth W Sent: Wednesday, August 31, 2016 7:22 AM To: Bates, Joni B. Subject: RE: Wildwood Ridge Phase 3 Plat Joni, I see no conflict with the proposed plat Thanks, Kenneth W. Fuentes Engineer I _&w mCla&Opprnlianc 1 Region 401 w Vcpa01 AVO. 50e 000 1 Lnpe RvakJ AR 12201 <)Vco: 5013774600 I F?x. 501 V7-s730 I Mottle501-516-9565 IN n n1 nn1 rr, ,•,� CeRterPoint 6Jeryy From: Bates, Joni B. Sent: Tuesday, August 30, 2016 5:41 PM To: Fuentes, Kenneth W Subject: FW: Wildwood Ridge Phase 3 Plat They are requesting a review and approval please. Thanks, Joni From: Thomas R. Pownall [Mai Ito:thamas h ma gi rin ] Sent: Tuesday, August 30, 2016 4:44 PM To: Vincent Hotho; Bates, Joni B.; Chris Green; Jonathan Long; THEODIS THOMPSON Subject: Wildwood Rldge Phase 3 Plat All: Attached is the review plat for Wildwood Ridge Phase 3. The City of Little Rock requires your review and approval for filing. Please let me know if you have comments or if you approve. An email is fine. Thank you Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351,6695 Cell ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources. ***** James, Donna From: Floriani, Vince Sent: Wednesday, October 5, 2016 11:46 AM To: James, Donna;-thomas@thomasengineering2000.com Subject: Wildwood Ridge III Final Plat Attachments: CCE10052016.pdf Public Works is OK to sign off on final plat. Vince CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: WILDWOOD RIDGE PHASE 3 INSPECTOR REPORT !t.'h� YG► C.1f�A�'x~ Y PFwrJ.ya7c+? 1 have made a final inspection of the improvements and find that: r ���f'� S 1rh[.� - 7 �� pig +/ All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list hex been prepared and sent. Engineering Specialist ADDRESSING SPECIALIST REPORT I have reviewed the plat aad find that the street names and street configuration are acceptable. AddressingSpacialist 0aic:_-7 A TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in c n1 tmancc with City requirementsandards. strtaet signs should be ardctrd and billed to developer. Work orders have been prepared for signage, Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. ��-- Traffic Engineer 17n[e ql2•��]� CIVIL ENGINEER REPORT I have revjewed the file for this matter and rind that: t// The maintenance bond has been submitted and it is the proper type and % -iount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic fornt have been submitted. All other requirements for final plat approval have been satisfied. 1 Civil Engineer 1/II SURVEYOR REPORT I have reviewed the plat and find that: All "1111emants for final plat approval have been satisfied. Surveyor Date: 9;29 "f HAYALFR APPROVAL All Civil =ngin ng requlrent n[s for filing this final plat have been satisfied. Design _view Enbineer.Civil Eal;bWring Manager Eneclivc: Sept 29, 2016 �. V •w i r i I� ?3 I� I 1 _ �. GaRDpry ROAtl _ Yrl. _•il i.+ 'I 'i i z 'i i I L 'G .. I' f� liij ei o N f l �..��5pxanEtaG S ��1� i� ... a 1! -•n L—___— --_--- 3N� — — (ifis ! � a � °' ° p d r I il'� '1'1• !�� p �a �•L.,,.� eGpo °° o I I Ei;f� 01 0 - n rE N yX eQ O ;• Y� I! is 3 S z 'e $ 1 � l = James, Donna From: Floriani, Vince Sent: Monday, September 26, 2016 11:04 AM To: James, Donna; Harper, Vance Subject: FW: Wildwood Ridge Plat and Record Drawings Attachments: WILDWOOD RIDGE 3-GORDON RD RECORD.pdf, WILDWOOD RIDGE 3-GORDON CR RECORD.pdf; PLAT FOR REVIEW.pdf; WildwoodRidge3CityForm.pdf; WildwoodRidgeReviewForm.pdf Please review the proposed plat. Thanks, Vince Floriani, P.E. Little Rock Public Works -Civil Engineering 701 W. Markham St. Little Rock, Arkansas 72201 501-371-4817 From: Thomas R. Pownall[mailto:thomas@thomasengineering2000.com] Sent: Tuesday, September 20, 2016 3:18 PM To: Floriani, Vince Cc: Charles, Nathan Subject: Wildwood Ridge Plat and Record Drawings Vince and Nathan, Attached is the plat for your review. Also attached are the record drawings and wall certification. If the record drawings are what you want, I can bring hard copies to your office. I will also bring the maintenance bond. Let me know if all of this meets approval. Thank you, gentlemen. Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351.6695 Cell City of Little Rock Planning and Development Filing Fees Date , 201L Annexation Board of Adjustment Cond Use Permit/T UP Final Plat Planned Unit Dev Preliminai y Plat Special Use Permit Rezoning Site Plans Street Name Change Street Na e Signs N umberw:? a Public Hearing Signs. Number -at -ea File No $ ' S $ OCT Q 6 Z016 $ ILE ROCK SUiLQING CODE Total $ - Location Applicant h _