HomeMy WebLinkAboutS-1653-A Staff AnalysisApril 21, 2011
M NO.: 2
FILE NO.: S-1653-A
NAME: Forest Valley Subdivision Preliminary Plat
LOCATION: Located on the Southside of Forest Lane at the end of Forest Valley Lane
DEVELOPER:
CJ Pace, LLC
100 Buckland Place
Little Rock, AR 72223
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 5.14 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 20
R-2, Single-family
19 - Chenal
42.11
VARIANCES/WAIVERS REQUESTED:
FT. NEW STREET: 0 LF
1. A variance from Section 31-256 to allow a front building line on a residential lot of
fifteen (15) feet.
2. A variance from Section 36-254(2) to allow side yard setback on each side of the lot
at five (5) feet.
3. A variance from the City's Land Alteration Ordinance to allow grading of future
phases with the development of Phase I.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting preliminary plat approval to allow the development of
five (5) plus acres with twenty (20) single-family residential lots. The lots are
proposed with an average lot size of 60-feet by 140-feet with an average lot area
of 7,200 square feet. The request includes a variance to allow the front building
line to be reduced to fifteen (15) feet and the side yard setbacks to be reduced to
five (5) feet.
April 21, 2011
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1653-A
The applicant is also requesting a variance from the Land Alteration Ordinance to
allow grading of the entire subdivision with the installation of the basic
infrastructure.
The applicant has indicated an emergency access located through a 17.5 foot
Tract (Tract C) located adjacent to Lot 44 extending to the west to an access
easement located on adjacent property to South Katillus Road.
B. EXISTING CONDITIONS:
C
The property is undeveloped with a scattering of trees. Forest Lane has been
constructed to the northern boundary of this property. Forest Lane was
constructed as a residential street with curb and gutter but no sidewalk was
required. Along the eastern boundary of this site is a church, an ambulance post
and a developing single-family subdivision. West of the site are single-family
homes located on acreage. To the north is the first phase of the Forest Valley
Subdivision and further north is a single-family subdivision and an elementary
school.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area property owners.
All abutting property owners of the site and the Montagne Court were notified of
the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. A variance is
being requested to advance grade the lots with construction of the street.
2. Plans of all work in right-of-way shall be submitted for approval prior to start
of work. Obtain barricade permit prior to doing any work in the right-of-way
from Traffic Engineering at (501) 379-1805 (Travis Herbner).
3. A Sketch Grading and Drainage Plan will be required per Section
29-186 (e).
4. Per Section 29-102 an evaluation should be conducted on the basis of
existing downstream development and any analysis of stormwater runoff
with and without the proposed development. If the proposed development
oil
April 21, 2011
SUBDIVISION
ITEM NO.: 2 (Cont,) FILE NO.: S-1653-A
will cause or increase downstream flooding conditions, provisions to
minimize such flooding conditions should be included in the design of the
storm management improvements. Such provisions may include
downstream improvements and/or detention of stormwater runoff and its
regulated discharge to the downstream storm drainage system.
5. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
7. Street Improvement plans shall include signage and striping. Traffic
Engineering must approve completed plans prior to construction.
8. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering 379-1813
(Steve Philpott) for more information.
9. Since the street is proposed to be 24-feet in width, show on the preliminary
and final plats the area of street where parking will be restricted to one side.
10. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements for this project.
Contact Little Rock Wastewater for additional information.
Enter : Approved as submitted -
Center -Point Energy: Approved as submitted.
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements
in effect at the time of request for water service must be met. A water main
extension will be required to provide water service to this property. Submit plans
for water facilities to Central Arkansas Water for review. Plan revision may be
required after additional review. Contact Central Arkansas Water regarding
installation procedures of water facilities. Approval of plans by Central Arkansas
Water, the Arkansas Department of Health Engineering Division and the Little
3
April 21, 2011
SUBDIVISION
ITEM NO.: 2 Gant. FILE NO.: S-1653-A
Rock Fire Department is required. This development will have minor impact on
the existing water distribution system. Proposed water facilities will be sized to
provide adequate pressure and fire protection. Additional fire hydrant(s) will be
required. Contact the Little Rock Fire Department to obtain information regarding
the required placement of the hydrant(s) and contact Central Arkansas Water
regarding procedures for installation of the hydrant(s). A Capital Investment
Charge based on the size of the meter connection(s) will apply to this
development in addition to normal charges.
Fire De artment: Place a fire hydrant 300-feet from the end of the cul-de-sac.
Contact the Little Rock Fire Department for additional information.
Count P1annin : No comment.
CATA: Approved as submitted. The site is not located near a dedicated CATA
Bus Route.
Parks and Recreation: No comment.
F. ISSUESFFECHN ICALIDES I G N:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (March 31, 2011)
Mr. Joe White of White-Daters and Associates was present representing the
request. Staff presented an overview of the request stating there were few
outstanding technical issues in need of addressing related to the proposed
preliminary plat. Staff requested Mr. White provide the name and address of the
owner and the source of title in the genE:ral notes section of the preliminary plat.
Public Works comments were addressed. Staff stated a grading permit was
required prior to any grading activities on the site. Staff stated a sketch grading
and drainage plan was required prior to construction. Staff stated the stormwater
detention ordinance would apply to the development of the site. Staff also stated
streetlights were required prior to the execution of the final plat.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
S
April 21, 2011
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1653-A
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing the issues
raised at the March 31, 2011, Subdivision Committee meeting. The revised plat
indicates the name and address of the owner and the source of title in the
general notes section of the proposed preliminary plat. The revised plat indicates
a note that stormwater management will be provided with the proposed
development and that streetlights will be installed prior to final platting.
The request is for approval of a preliminary plat to allow the development of five
(5) plus acres with twenty (20) single-family residential lots. The lots are
proposed with an average lot size of 60-feet by 140-feet with an average lot area
of 7,200 square feet. The request includes a variance from the Subdivision
Ordinance Section 31-256 to allow the front building line to be reduced to fifteen
(15) feet. There is also a request for a variance from the City Ordinance Section
36-254(2) to allow the side yard setbacks to be reduced to five (5) feet. The
requested variances are similar to variances approved for the Phase I portion of
the subdivision.
The applicant is also requesting a variance from the Land Alteration Ordinance to
allow grading of the entire subdivision with the installation of the basic
infrastructure. The previous approval also allowed for a variance from the Land
Alteration Ordinance to allow advanced grading of the lots. The previous
variance request does not appear to have impacted the development or the area.
Staff supports the current variance request from the Land Alteration Ordinance to
allow grading of the lots with the installation of the street and the basic
infrastructure for the subdivision.
The 2006 International Fire Code requires single-family residential developments
where the number of dwelling units exceeds 30 lots or units to provide a separate
and approved fire access road. The plat indicates an emergency access located
through a 17.5 foot Tract (Tract C) located adjacent to Lot 44 extending to the
west to an identified access easement located on the adjacent property
extending to South Katillus Road. The applicant has provided an agreement
from the adjacent property owner indicating the access easement will be
provided to the developer upon completion of the proposed subdivision. Staff is
supportive of the access as indicated.
Staff is supportive of the request. To staff's knowledge there are no remaining
outstanding technical issues associated with the request. Staff feels the
development of the site as proposed will not significantly impact the area.
'67
April 21, 2011
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-1653-A
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the following variance requests:
1. A variance from Section 31-256 to allow a front building line on a residential
lot of fifteen (15) feet.
2. A variance from Section 36-254(2) to allow side yard setback on each side of
the lot at five (5) feet.
3. A variance from the City's Land Alteration Ordinance to allow grading of
future phases with the development of Phase I.
PLANNING COMMISSION ACTION: (APRIL 21, 2011)
Mr. Joe White of White-Daters and Associates was present representing the request.
Staff presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the following
variance requests:
1. The variance request from Section 31-256 to allow a front building line on a
residential lot of fifteen (15) feet.
2. The variance request from Section 36-254(2) to allow side yard setback on each
side of the lot at five (5) feet.
3. The variance request from the City's Land Alteration Ordinance to allow grading of
future phases with the development of Phase I.
on