HomeMy WebLinkAboutS-1648 Staff AnalysisNO.: 2. S-1648 NAME: Hankins Subdivision Site Plan Review LOCATION: located at 5920 West 65th Street Planning Staff Comments: 1. Notification was received on December 16, 2009. 2. Provide the total square footage of the existing structure and the new building in the general notes section of the site plan. See Site Plai. 3. Provide the building coverage of both the principal and accessory structures in square feet in the general notes section of the site plan. See Site Plan 4. Provide the parcel size in the general notes section of the site plan. qee Site Plan 5. Provide the total number of existing and proposed parking spaces in the general notes section of the site plan. See Site Plan Variance/Waivers: None requested. Public Works Conditions: 1. Geyer Springs Road is classified on the Master Street Plan as a minor arterial. A dedication of right of way 45-feet from centerline will be required. this has nreviously been done 2. Repair or replace any curb, gutter or sidewalks that is damaged in the public right of way prior to occupancy. 3. Stormwater detention ordinance applies to this property. Show the proposed location for stromwater detention facilities on the plan. Hccoraing to in, Environmental Complianc, _ngineer, wiiri reuut:t:u run-off, no detention facility is needed. 4. If disturbed area is more than one (1) acre, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the star of construction. Will Comply 5. Plans for all work in the right of way shall be submitted for approval prior to the start of work. Obtain barricade permit prior to doing any work in the right of way from Traffic Engineering at (501) 379-1805. Will comply 6. Remove directional median show in driveway off 65th Street. The driveway can function as a full service driveway. ;ee bite clan Utilities and Fire DepartmentlCounty Planning: Wastewater: Sewer available to this project. Enter : Approved as submitted. Center -Point Ener : No comment received. Item 4 2. AT & T: No comment received. Central Arkansas Water: No objection. All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: The site is located near CATA Bus Route #17A — The Mabelvale-UALR Route. Planning Division: No comment. Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. A screening fence is required along the perimeters abutting residentially zoned or used property. The site plan indicates the placement of a six (6) foot wood fence along the eastern and northern perimeters. 3. The new construction will require a small amount of building landscaping. 4. Street buffers are required at six (6%) of the average depth of the lot. The site plan indicates the placement of a 15-foot landscape buffer along the abutting streets. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, December 30, 2009. Item # 2. ITEM NO.: 2. S-1 NAME: Hankins Subdivision Site Plan Review LOCATION: located at 5920 West 65th Street Plannina Staff Comments: 1. Notification was received on December 16, 2009. 2. Provide the total square footage of the existing structure and the new building in the general notes section of the site plan. 3. Provide the building coverage of both the principal and accessory structures in square feet in the general notes section of the site plan. 4. Provide the parcel size in the general notes section of the site plan. 5. Provide the total number of existing and proposed parking spaces in the general notes section of the site plan. Variance/Waivers: None requested. Public Works Conditions: 1. Geyer Springs Road is classified on the Master Street Plan as a minor arterial. A dedication of right of way 45-feet from centerline will be required. 2. Repair or replace any curb, gutter or sidewalks that is damaged in the public right of way prior to occupancy. 3. Stormwater detention ordinance applies to this property. Show the proposed location for stromwater detention facilities on the plan. 4. If disturbed area is more than one (1) acre, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the star of construction. 5. Plans for all work in the right of way shall be submitted for approval prior to the start of work. Obtain barricade permit prior to doing any work in the right of way from Traffic Engineering at (501) 379-1805. 6. Remove directional median show in driveway off 65th Street. The driveway can function as a full service driveway. Utilities and Fire Department/County Planning: Wastewater: Sewer available to this project. Enter : Approved as submitted. Center -Point Ener : No comment received. AT & T: No comment received. Central Arkansas Water: No objection. All Central Arkansas Water requirements in Item # 2. effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Planning: No comment. CATA: The site is located near CATA Bus Route #17A — The Mabelvale-UALR Route. Planninq Division: No comment. Landscape: 1. Site plan must comply with the City's minimal landscape and buffer ordinance requirements. 2. A screening fence is required along the perimeters abutting residentially zoned or used property. The site plan indicates the placement of a six (6) foot wood fence along the eastern and northern perimeters. 3. The new construction will require a small amount of building landscaping. 4. Street buffers are required at six (6%) of the average depth of the lot. The site plan indicates the placement of a 15-foot landscape buffer along the abutting streets. Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the additional information as noted above) to staff on Wednesday, December 30, 2009. Item # 2. January 14, 2010 ITEM NO.: 2 _ FILE NO.: S-1648 NAME: Hankins Subdivision Site Plan Review LOCATION: Located at 5920 West 65th Street DEVELOPER: Bruce Hankins c/o Kenny Roberts 63 Belmont Drive Little Rock, AR 72204 SURVEYOR: West Land Surveying 420A HWY 287 Vilonia, AR A Dr'uITGr'T- Pumphrey Architecture Mr. Kenny Roberts 912 West 6th Street P.O. Box 1662 Little Rock, AR 72203 AREA: 1.03 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF CURRENT ZONING: C-3, General Commercial District PLANNING DISTRICT: 13 — 65th Street East CENSUS TRACT: 20.01 VARIANCES/WAIVERS REQUESTED: None requested. A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT: The request is a Subdivision Site Plan Review application request to allow the property located at 5920 West 65tt' Street to house two (2) structures. The site contains two buildings with a third building proposed for construction on the site. As of now the Beverage House is located in the smaller triangle shaped building, January 14, 2010 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: S-1648 and the larger building on the corner is used for storage. The initial thought of the developer was to build a new building behind the two existing buildings, relocate the Beverage House and upon completion of the new construction then the developer would remove the two (2) existing structures. The developer now wishes to build the new building and only remove the smaller triangle shaped building and keep the corner building. He has indicated upon completion of the new building the corner building will be renovated and leased to a business as allowed within the current zoning district. The project is proposed as a phased project. The existing business will remain open during the construction process of the new building. Upon completion of the new structure and parking area the triangular building will be removed and parking and landscaping placed within this area to serve the corner building. B. EXISTING CONDITIONS: There are two structures located on the site, a former convenience store and a liquor store. The property located to the east is a manufactured home park and the property to the south is a thrift store. West and southwest of the site are commercial uses including an auto parts store and a tire store. 65th Street and Geyer Springs Road appear to be constructed to arterial street standard. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has not receives{ any comment from area residents. All property owners located within 200 feet of the site, Southwest Little Rock United for Progress, the Geyer Springs and the Wakefield Neighborhood Associations were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Geyer Springs Road is classified on the Master Street Plan as a minor arterial. A dedication of right of way 45-feet from centerline will be required. 2. Repair or replace any curb, gutter or sidewalks that is damaged in the public right of way prior to occupancy. 3. Stormwater detention ordinance applies to this property. Show the proposed location for stromwater detention facilities on the plan. 4. If disturbed area is more than one (1) acre, obtain a NPDES stormwater permit from the Arkansas Department of Environmental Quality prior to the star of construction. 2 January 14, 2010 SUBDIVISION ITEM NO.: 2 (Cont. FILE NO.: 5-1548 5. Plans for all work in the right of way shall be submitted for approval prior to the start of work. Obtain barricade permit prior to doing any work in the right of way from Traffic Engineering at (501) 379-1805. 6. Remove directional median show in driveway off 65th Street. The driveway can function as a full service driveway. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer available to this project. Entergy: Approved as submitted. Center -Point Enemy: No comment received. AT & T: No comment received. Central Arkansas Water: No objection. All Central Arkansas Water requirements in effect at the time of request for water service must be met. The Little Rock Fire Department needs to evaluate this site to determine whether additional public and/or private fire hydrant(s) will be required. If additional fire hydrant(s) are required, they will be installed at the Developer's expense. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. Contact Central Arkansas Water regarding the size and location of the water meter. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department for additional information. County Plannin : No comment. CATA: The site is located near CATA Bus Route #17A — The Mabelvale-UALR Route. F. ISSUES/TECHNICAL/DESIGN: Planninq Division: No comment. 3 January 14, 2010 SUBDIVISION ITEM NO.: 2 (Cont. Landscape- FILE NO.: S-1648 1 Site plan must comply with the City's landscape and buffer ordinance requirements. 2. A screening fence is required along the perimeters abutting residentially zoned or used property. The site plan indicates the placement of a six (6) foot wood fence along the eastern and northern perimeters. 3. The new construction will require a small amount of building landscaping. 4. Street buffers are required at six (6%) of the average depth of the lot. The site plan indicates the placement of a 15-foot landscape buffer along the abutting streets. G. SUBDIVISION COMMITTEE COMMENT; (December 22, 2009) Mr. Kenneth Roberts of Visual by Design was present representing the owner. Staff presented the item stating there were few outstanding technical issues in need of addressing related to the site plan. Staff requested Mr. Roberts provide the total square footages of the buildings, the percent building coverage and provide the parcel size in the general notes section of the site plan. Public Works comments were addressed. Staff stated the Stormwater Detention Ordinance would apply to the development of the site. Staff requested Mr. Roberts provide the location of the proposed stormwater detention facilities on the site plan. Staff also stated a dedication of right of way 45-feet from centerline would be required on Geyer Springs Road. Mr. Roberts stated he had questioned public works staff previously to determine if stormwater detention would apply to the development. He stated staff had indicated since he was reducing the amount of paved area of the site no detention would be required. Landscaping comments were addressed. Staff stated screening would be required along the eastern perimeter of the site where abutting residentially used property. Staff also stated building landscaping would be required for the newly constructed building to be located on the site. Staff noted comments from the other reporting departments and agencies suggesting the applicant contact them individually for additional clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. 0 January 14, 2010 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: S-1648 H. ANALYSIS: Mr. Roberts submitted a revised site plan to staff addressing the issues raised at the December 22, 2009, Subdivision Committee meeting. The revised site plan includes the total square footages of the buildings, the percent building coverage and the parcel size in the general notes section of the site plan. The revised site plan has eliminated the median within the drive located off 65th Street. Mr. Roberts has contacted Public Works staff and they have determined stormwater detention will not be required due to the reduction in paved areas on the site. The site is proposed to contain two (2) buildings one (1) existing building and one (1) building proposed for new construction. The existing building contains 1,511 square feet and the new construction is proposed containing 3,942 square feet. The maximum building height will not exceed the allowable thirty-five (35) feet per the zoning district. The buildings are proposed as single story buildings. There will be twenty-one (21) parking spaces on the site at the completion of the new construction. For commercial development a total of eighteen (18) parking spaces would typically be required. The site plan does not include signage. Both ground signage and building signage will be limited to signage allowed in commercial zones. Ground signage is to be limited to a maximum height of thirty-six (36) feet and a maximum sign area of one hundred sixty (160) square feet. Building signage is to be limited to a maximum of ten (10) percent of the facade area on the facades with public street frontage. The site plan indicates the placement of a six foot (6) screening fence along the eastern and northern perimeters. Screening is only required along the eastern perimeter where abutting residentially used property. The site plan indicates a fifteen (15) foot street buffer along Geyer Springs Road and 65th Street. The ordinance typically requires the placement of street buffers at a minimum of six (6) percent of the depth of the property. The buffer as indicated is sufficient to meet the typical ordinance standards. To staff's knowledge there are no outstanding technical issues in need of addressing associated with the request. The proposed site plan appears to fully comply with the development criteria of the various City ordinances. 5 January 14, 2010 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.- S-1648 STAFF RECOMMENDATION: Staff recommends approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff recommends the final certificate of occupancy be tied to the removal of the existing triangular building and construction of the parking and landscaping within the area of this existing building. PLANNING COMMISSION ACTION: (JANUARY 14, 2010) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. Staff also presented a recommendation the final certificate of occupancy be tied to the removal of the existing triangular building and construction of the parking and landscaping within the area of this existing building. There was no further discussion of the item. The chair entertained a motion of approval of the item as presented by staff. The motion carried by a vote of 11 ayes, 0 noes and 0 absent. C: