Loading...
HomeMy WebLinkAboutS-1582 Staff AnalysisITEM NO.: 2, S-158 NAME: Kanis/Kirby Preliminary Plat LOCATION: located on the Northwest corner of Kanis and Asbury Roads Planning Staff Comments: 1. Provide notification of abutting property owners of the site, complete with the certified abstract list, notice form with affidavit executed and proof of mailing. The notice must be mailed no later than August 1, 2007. The Office of Planning and Development must receive the proof of notice no later than August 10, 2007. 2. Provide the source of title of the landowner in the general notes section of the proposed preliminary plat. 3. Provide the front building setback for the proposed lots on the preliminary plat. Typical setbacks for the proposed zoning is 25-feet adjacent to the street sides. 4. Provide the total lot area for each of the proposed lots. VarianceMlaivers: A deferral of the Master Street Plan requirements and allow a five year deferral of the required street improvements to Kanis Road (General Note 3)_ Public Works Conditions: 1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. Per the Master Street Plan an additional 10 feet of right-of-way is required to be dedicated for the right turn lane onto Kirby Road. 2. Asbury Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. 3. Kirby Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. 4. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis Road and Kirby Road. 5. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis Road and Asbury Road. 6. With site development, provide the design of street conforming to the Master Street Plan. Construct one-half street improvement to Kanis Road including 5-foot sidewalks with the planned development. The back of curb should be located 33 feet from centerline. A right turn lane should be installed at the Kanis Road -Kirby Road intersection. The right turn lane should be provided with 150 feet of stacking distance and 100 foot taper. 7. With site development, provide the design of the street conforming to the Master Street Plan. Construct one-half street improvements to Kirby Road including 5-foot sidewalks with the planned development. The back of curb should be located 18 feet from the centerline. 8. With site development, provide the design of street conforming to the Master Street Item # 2. Plan. Construct one-half street improvement to Asbury Road including 5-foot sidewalk with the planned development. The back of curb should be located 18 feet from centerline. 9. The future driveway on Kanis Road must align with Woodlands Edge Trail. If future driveways are proposed on Kanis Road they must be right in/right out only and meet the City driveway spacing criteria. 10. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 11. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 12. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 13.Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. 14. Street Improvement plans shall include signage and striping. Traffic Engineering must approve completed plans prior to construction. 15.Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379- 1805 (Travis Herbner) for more information. Utilities and Fire Department/County Planning: Wastewater: Sewer main extension required with easement. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: No comment received. AT & T: No comment received. Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. On -site fire line(s) and additional fire hydrant(s) will be required in order to provide service to this property. A Capital Investment Charge based on the size of connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire systems. This development will have minor impact on existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. Item # 2. Plannincl Division: No comment. Landscape; No comment. Revised plat/plan: Submit four (4) copies of a revised preliminary plat (to include the additional information as noted above) to staff on Wednesday, August 1, 2007. Item # 2. August 16, 2007 ITEM NO.: 2 NAME: Kanis/Kirby Preliminary Plat FILE NO.: S-1582 LOCATION: Located on the Northwest corner of Kanis and Asbury Roads DEVELOPER: LGR Investment, LLC 404 E. Kiehl Avenue North Little Rock, AR 72020 ENGINEER: White Daters and Associates 24 Rahling Circle Little Rock, AR 72223 AREA: 5.6 acres CURRENT ZONING PLANNING DISTRICT: CENSUS TRACT: NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF C-1, Neighborhood Commercial and R-2, Single-family 18 — Ellis Mountain 42.10 VARIANCES/WAIVERS REQUESTED: None requested. BACKGROUND: Ordinance No. 17,442 adopted by the Little Rock Board of Directors on April 1, 1997, rezoned a portion of this site (0.34 acres) from R-2, Single-family to C-1, Neighborhood Commercial. A. PROPOSAL/REQUEST: The applicant is seeking preliminary plat approval for the creation of a two lot plat with Lot 1 utilizing C-3, General Commercial District uses and Lot 2 utilizing 0-3, General Office District uses through a rezoning request as a separate item on this agenda (Z-6245-B). Lot 1 is proposed containing 3.49 acres and Lot 2 containing .97 acres. A front building line of 25-feet has been indicated on the street sides of the proposed plat. Upon development all street improvements will be constructed in accordance with the Master Street Plan. August 16, 2007 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: S-1582 B. EXISTING CONDITIONS: The site contains a number of residences both site built and manufactured homes and a building constructed for a commercial use a number of years ago now being used as a residence. The property to the north on Asbury Road is zoned PD-O and is currently being used as an office for Davis Forestry. To the north on Kirby Road, the property is zoned R-2 with a CUP which allows a manufactured home on the property. To the southeast is a newly developing single-family subdivision with attached and detached residential structures. To the west of the site is a vacant property currently zoned C-1, Neighborhood Commercial District. Northwest of the site is a property zoned PD-R which was approved to allow the construction of attached single-family homes. C. NEIGHBORHOOD COMMENTS: As of this writing, staff has received several informational phone calls from area residents. The Parkway Place and the Gibralter Heights/Point West/Timber Ridge Neighborhood Association, all owners of property located within 200 feet of the site and all residents, who could be identified, located within 300 feet of the proposed development were notified of the public hearing. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. Kanis Road is classified on the Master Street Plan as a minor arterial. A dedication of right-of-way 45 feet from centerline will be required. Per the Master Street Plan an additional 10 feet of right-of-way is required to be dedicated for the right turn lane onto Kirby Road. 2. Asbury Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. 3. Kirby Road is classified on the Master Street Plan as a collector street. A dedication of right-of-way 30 feet from centerline will be required. 4. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis Road and Kirby Road. 5. A 20 foot radial dedication of right-of-way is required at the intersection of Kanis Road and Asbury Road. 6. With site development, provide the design of street conforming to the Master Street Plan. Construct one-half street improvement to Kanis Road including 5-foot sidewalks with the planned development. The back of curb should be located 33 feet from centerline. A right turn lane should be installed at the Kanis Road -Kirby Road intersection. The right turn lane should be provided with 150 feet of stacking distance and 100 foot taper. 2 August •16, 2007 SUBDIVISION TEM NO.: 2 (Cont. FILE NO.: S-1582 7. With site development, provide the design of the street conforming to the Master Street Plan. Construct one-half street improvements to Kirby Road including 5-foot sidewalks with the planned development. The back of curb should be located 18 feet from the centerline. 8. With site development, provide the design of street conforming to the Master Street Plan. Construct one-half street improvement to Asbury Road including 5-foot sidewalk with the planned development. The back of curb should be located 18 feet from centerline. 9. The future driveway on Kanis Road must align with Woodlands Edge Trail. If future driveways are proposed on Kanis Road they must be right in/right out only and meet the City driveway spacing criteria. 10. Plans of all work in right-of-way shall be submitted for approval prior to start of work. Obtain barricade permit prior to doing any work in the right-of-way from Traffic Engineering at (501) 379-1805 (Travis Herbner). 11. Storm water detention ordinance applies to this property. Show the proposed location for storm water detention facilities on the plan. 12. If disturbed area is one (1) or more acres, obtain a NPDES storm water permit from the Arkansas Department of Environmental Quality prior to the start of construction. 13. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of occupancy. Contact Traffic Engineering 379-1813 (Steve Philpott) for more information. 14. Street Improvement plans shall include signage and striping. Traffic Engineering must approve completed plans prior to construction. 15. Obtain permits prior to doing any street cuts or curb cuts. Obtain barricade permit prior to doing any work in the right-of-way. Contact Traffic Engineering at (501) 379-1805 (Travis Herbner) for more information. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING - Wastewater: Sewer main extension required with easement. Contact Little Rock Wastewater Utility at 688-1414 for additional information. Entergy: No comment received. Center -Point Energy: No comment received. AT & T: No comment received. 3 August'16, 2007 SUBDIVISION ITEM NO.: 2 (Cont. F G LE NO.: S-1582 Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of request for water service must be met. On -site fire line(s) and additional fire hydrant(s) will be required in order to provide service to this property. A Capital Investment Charge based on the size of connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire systems. This development will have minor impact on existing water distribution system. Proposed water facilities will be sized to provide adequate pressure and fire protection. Fire Department: Approved as submitted. County Planning: No comment. CATA: The site is not located on a dedicated CATA Bus Route. ISSUES/TECHNICAL/DESIGN: Planning Division: No comment. Landscape: No comment. SUBDIVISION COMMITTEE COMMENT: (July 26, 2007) The applicant was present. Staff presented an overview of the proposed development stating there were few outstanding technical issues associated with the request. Staff requested the applicant provide the source of title of the landowner, the building setback for the proposed lots and the total lot area for each of the proposed lots. Public Works comments were addressed. Staff stated the abutting streets would require construction to Master Street Plan standards at the time of final platting. Staff also stated a right turn lane would be required at the intersection of Kanis and Kirby Roads. Staff stated future drives along Kanis Road would be required to align with Woodlands Edge Trail. Staff noted streetlights would be required prior to final platting. Staff noted comments from the various other reporting departments and agencies suggesting the applicant contact them directly for additional information and clarification. There was no further discussion of the item. The Committee then forwarded the item to the full Commission for final action. 0 August -16, 2007 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: S-1582 H. ANALYSIS: The applicant submitted a revised preliminary plat to staff addressing most of the issues raised at the July 26, 2007, Subdivision Committee meeting. The applicant has provided the source of title of the landowner, the building setback and the total lot area for each of the proposed lots. The site plan indicates a right turn lane will be added at the intersection of Kanis and Kirby Roads and future drives will align with Woodlands Trails. The revised plat indicates the placement of a 25-foot front building line abutting the two streets as typically required by the proposed zoning classifications. A note indicates the remaining setbacks will comply with the proposed zoning classification. The plat is proposed with Lot 1 containing 3.49 acres and Lot 2 containing .97 acres. Lot 1 is proposed for C-3, General Commercial District zoning and Lot 2 with 0-3, General Office District zoning through a rezoning request as a separate item on this agenda (Z-6245-B). Per the proposed zoning classification the minimum lot size allowed is 14,000 square feet or 0.32 acres. The lot sizes proposed are more than adequate to meet the typical minimum lot size for the proposed zoning. Staff is supportive of the proposed preliminary plat application. The plat as proposed follows the proposed zoning lines and fully complies with typical minimum ordinance requirements for the existing and proposed zoning classification. Staffs support of the proposed preliminary plat should not be construed as support for the proposed rezoning or the Future Land Use Plan amendment. STAFF RECOMMENDATIONS: Staff recommends approval of the proposed preliminary plat subject to compliance with the comment and conditions as outlined in paragraphs D, E and F of the agenda staff report. PLANNING COMMISSION ACTION: (AUGUST 16, 2007) The applicant was present. There were no registered objectors present. Staff presented the item with a recommendation of approval of the request subject to compliance with the comments and conditions as outlined in paragraphs D, E and F of the agenda staff report. There was no further discussion of the item. The chair entertained a motion for placement of the item on the consent agenda for approval. The motion carried by a vote of 7 ayes, 0 noes, 3 absent and 1 open position. 5