HomeMy WebLinkAboutHDC2024-016 COC signedDEPARTMENT OF PLANNING AND DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790
CERTIFICATE OF COMPLIANCE
Property Owner/Agent:
Address of Property
Maceo LLC/Donna Thomas
524 E 6th Street
Fax:(501) 399-3435
www.littLerock.gov
HDC2024-016
Project Description with Conditions listed:
1) Brick and Mortar Repair
a) Replace missing bricks as needed to match existing pattern.
b) Brick will be repointed, with match mortar in composition, color, strength, and joint style
where mortar is missing or cracked.
2) Wood Siding and Trim Board Repair
a) Trim Boards and Siding Repair
i) Repair damaged trim boards and siding where possible by patching deteriorated wood
with wood putty, repair larger areas using wood epoxies, and repair significantly
deteriorated areas by removing damage and fitting with anew piece of wood, i.e. a
dutchman repair.
b) Trim Boards and Siding Replacement
i) Remove irreparably damaged trim boards and siding pieces and replace with boards of
same dimension, shape and profile.
ii) High grade cedar or cypress is recommended as replacement material for rot
resistance.
iii) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the
reverse side and edges.
c) Trim Boards around Windows
i) Repair damaged trim boards and siding where possible by patching deteriorated wood
with wood putty, repair larger areas using wood epoxies, and repair significantly
deteriorated areas by removing damage and fitting with a new piece of wood, i.e. a
dutchman repair.
ii) Remove damaged trim boards and replace with boards of same dimension, shape and
profile. Match details of existing windows.
iii) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the
reverse side and edges.
4) Wood Soffit and Fascia Repair
a) Repair damaged pieces where possible by patching deteriorated wood with wood putty,
repair larger areas using wood epoxies, and repair significantly deteriorated areas by
removing damage and fitting with a new piece of wood, i.e. a dutchman repair.
b) Remove damaged soffit and fascia pieces and replace with wood boards of same
dimension, shape and profile.
c) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the reverse
side and edges.
5) Painting
a) Scrape areas as needed.
b) Apply one coat of primer, and two coats of paint.
c) Back prime new boards by applying a coat of primer to the reverse side and edges.
d) Avoid non -breathable coatings which trap moisture.
e) Do not paint previously unpainted materials or architectural elements.
6) Cleaning of Building
a) Clean exterior of building using mild soap and low pressure to remove mildew and dirt from
exterior of building.
7) Wood Windows
a) Repair wood windows to an operating state.
i) Replace sashes only when more than one member of the sash is rotten.
ii) Clean, repair, reglaze and repaint sashes and jambs.
iii) Replace cord and weights where needed.
b) The applicant shall provide detailed drawings of the rear doors of the structure when
design is complete.
Staff 49nature Issue Date
Ds avas
Expiration 13ate (Ord. No. 22,338)
The original is printed on pale orange paper.
POSTING OF COC ON PROPERTY DURING PROJECT: Pursuant to Little Rock, Ark. Ordinance No. 22,338, a Certificate
of Compliance, or copy, shall be posted, available for inspection, and prominently displayed on the site of the work at
the front of the property to be seen from the street until the completion of the project.
COC EXPIRATIONS AND EXTENSIONS: Pursuant to Little Rock, Ark. Ordinance No. 22,338, a Certificate of
Compliance shall expire and be considered null and void on the expiration date noted above. If an extension is needed
to complete work, please review terms of extension and expiration in Ord. No. 22,338 and contact Planning &
Development staff at least one month prior to the expiration date.