Loading...
HomeMy WebLinkAboutS-1567-A ApplicationPage 1 of 1 C��.� MAIL ' y�Ha Classic FW: PONDS EDGE PLAT From: "Jim Boyd" <jim.boyd@lrwu.com> To: "'James, Donna"' <DJames@littlerock.org> Cc: "'MCGETRICK MCGETRICK"' <mcgetrick2@sbcglobal.net> 1 File (1333KB) POND'S E... Thursday, May 6, 2010 2:42 PM Sewer is available to this property. No additional easements are required. LRWU has no objection to the filing of this plat. James Boyd, P.E. Engineering Supervisor Little Rock Wastewater 41 1 Clearwater Drive Little Rock, AR 72204 Office 501-688-1414 Mobile 501-352-0390 email jim.boydEylrwu.coni From: MCGETRICK MCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Wednesday, May 05, 2010 4:38 PM To: Jim Boyd Subject: PONDS EDGE PLAT Jim Here is the final plat on Ponds Edge. I just need a note for approval for the plat. Pat CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME — PONDS EDGE SUBDIVISION INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist Date: 3 l /6/ c7 ADDRESSING SPECIALIST'S REPORT 1 ave revi tt e d fi that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in / conformance with City requirements/standards. 1/ Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. J w _ Traffic Engineer Date: �t w S )67kJ 19R20-7T - CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: ►f/ The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. L Civil Engineer I/II Date: f d Q SURVEYOR'S REPORT I have reviewed the plat and find that: All requireme or final plat approval have been satisfied. C-- )—J": — D Surveyor Date: MANAGER APPROVAL r All Civil Engineering requirements for filing this final plat have been satisfied. February 2007 3 I I j0