HomeMy WebLinkAboutS-1563-A ApplicationJames, Donna
From: Thomas R. Pownall<thomas@thomasengineering2000.com>
Sent: Thursday, April 28, 2016 8:47 AM
To: Floriani, Vince; James, Donna
Subject: Kanis Creek Plat (PVK)
Attachments: KANIS CREEK BLOCK 2-PLAT.pdf
Vince and Donna,
Attached is the plat for Kanis Creek Subdivision (PVK Development). Please have Vance review it and let me know what
else is needed to get this completed. We are being heard for the annexation on Monday.
Thanks! I
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351.6695 Cell
en
GRAPHIC 3CALB
_ _ r
THIS PLAT_ ,
1DCIIAIIII NAP
T
FINAL PLAT
KANIS CREEK SUBDIVISION
LUM
THROUGH 1
AND DEDICATION DF A POKTION OF
PRIDE VALLEY R
CITY OF LITTLE ROCK S IN
SE} NWj SECTION S,
TOWNSHIP 1 NORTH, RANGE 13 WEST
PULASKI COUNTY,ARKANSAS
James, Donna
From:
Vincent Hotho <Steven.Hotho@lrwu.com>
Sent:
Thursday, April 28, 2016 11:17 AM
To:
Thomas R. Pownall
Cc:
James, Donna
Subject:
RE: Kanis Creek Plat
LRW has no objection to this plat.
S. Vincent Hotho, P.E.
Program Supervisor
Little Rock Wastewater Utility
Ofc: 501.688.1452
Mbl: 501.442.6042
From: Thomas R. Pownall[mailto:thomas@thomasengineering2000.com]
Sent: Thursday, April 28, 2016 8:44 AM
To: Vincent Hotho <Steven.Hotho@lrwu.com>
Subject: Kanis Creek Plat
Vince,
Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your
approval. Can I have a response by Monday?
We are being heard by the LR board on Monday about the annexation and I don't expect a problem with that hearing.
Thanks!
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351.6695 Cell
1
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: KANIS CREEK LOTS 1-15 BLOCK 2
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
f All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
L Engineering Specialist Date: e5_-'3
ADD )EBBING SPECIALIST REPORT
I leave reviewed the plat and find that the street names and street configuration are acceptable. G
Addressing Specialist Nate:4121f�
TRAFFTC ENGINEER REPOR
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
�] street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been received and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed. r, G
a Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
_ All other requirements for final plat approval have been satisfied.
a
�J Civil Engineer I/II Tate: S
SURVEYOR REPORT
I have reviewed the plat and find that:
C All requirements for final plat approval have been satisfied.
ti2La=:Q
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
IV2�- � Date: f I
Design Review Engineer/Civil Engineering Manager
Date: �__ Z 1%'7'41.0
Effective: April 28, 2016
James, Donna
From: Thomas R. Pownall<thomas@thomasengineering2000.com>
Sent: Wednesday, May 18, 2016 11:18 AM
To: James, Donna
Cc: Floriani, Vince
Subject: PVK/ Kanis Creek Plat
Attachments: PLAT UTILITY APPROVALS.pdf
Donna,
Attached are the utility approvals for the Kanis Creek/PVK Residential lots.
I am delivering the maintenance bond to Vince today which will satisfy all of his requirements.
Thanks
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351.6695 Cell
Thomas R. Pownall
From: Henderson, Jeremy <jhende9@entergy.com>
Sent: Thursday, April 28, 2016 8:46 AM
To: Thomas R. Pownall
Subject: RE: Kanis Creek Plat
Entergy approved.
Thanks!
Jeremy Henderson
Engineering Associate
Entergy Corporation
9 Entergy Ct.
Little Rock, AR 722.11
501-223-6125
From: Thomas R. Pownall [mailto:thornas a thomaseri ineer!n 2fl00.com]
Sent: Thursday, April 28, 2016 8:44 AM
To: Henderson, Jeremy
Subject: Kanis Creek Plat
EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide
your user ID or password.
Jeremy,
Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your
approval. Can I have a response by Monday?
I believe all of the electric has been pulled and energized for this project.
Thanks!
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501.351,6695 Cell
1
Thomas R. Pownall
From: Vincent Hotho <Steven.Hotho@Irwu.corn>
Sent: Thursday, April 28, 2016 11:17 AM
To: Thomas R. Pownall
Cc: James, Donna
Subject: RE: Kanis Creek Plat
LRW has no objection to this plat.
S. Vincent Hotho, P.E.
Program Supervisor
Little Rock Wastewater Utility
Ofc: 501.688.1452
M b I : 501.442.6042
From: Thomas R. Pownall [mailto:thomas thomasen ineerin 2O00.comj
Sent: Thursday, April 28, 2016 8:44 AM
To: Vincent Hotho <Steven.Hotho@Irwu.Com>
Subject: Kanis Creek Plat
Vince,
Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road, The City of Little Rock requires your
approval. Can I have a response by Monday?
We are being heard by the LR board on Monday about the annexation and I don't expect a problem with that hearing.
Thanks!
Thomas R. Pownall, P,E.
Thomas Engineering Company
501,753.4463
501.753.6814 Fax
501,351.6695 Cell
1
Thomas R. Pownall
From: Jonathan Long <Jonathan.Long@carkw.com>
Sent: Tuesday, May 03, 2016 9:03 AM
To: Thomas R. Pownall
Subject: RE: Kanis Creek Plat
Approved by CAW.
From: Thomas R. Pownall [malIto: thomas thomasen in erin 2000.com]
Sent: Tuesday, May 03, 2016 8:15 AM
To: Jonathan Long
Subject: FW: Kanis Creek Plat
Jonathan,
Any word on this plat?
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753,4463
501.753.6814 Fax
501.351,6695 Cell
From: Thomas R. Pownall [ma iIto: thomas thomasen ineer n 2000.Cam]
Sent: Thursday, April 28, 2016 8:45 AM
To: Jonathan Long
Subject: Kanis Creek Plat
Jonathan,
Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your
approval. Can I have a response by Monday?
There was no new water mains installed given there was an existing main on the south side of Pride Valley Road.
Thanks!
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753.6814 Fax
501,351.6695 Cell
1
Thomas R. Pownall
From: Edwards, Micah B<micah.edwards@CenterpointEnergy.com>
Sent: Wednesday, May 04, 2016 9:20 AM
To: thoi-nas@tholrlasengineel-ing2000.com
Cc: Bates, Joni B.
Subject: RE: Kanis Creek Plat
Attachments: KANIS CREEK BLOCK 2-PLAT.PDF
Thomas,
Sorry for the late reply; CenterPoint has no conflict with the proposed plat.
Thanks,
Micah Edwards, PE
Engineer III
Southern Gas operations I Arkansas/Oklahoma Region
401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201
Direct:501.377-4849 1 Fax:501-377-4733 1 Mobile:501-258-4373
>Cel wioint
E11ergy
From: Bates, Joni B.
Sent: Tuesday, May 03, 2016 2.36 PM
To: Edwards, Micah B
Subject: FW: Kanis Creek Plat
Did you send to someone to review yet?
From: Thomas R. Pownall [maiito:thomas thomasen ineerin 2000.cam]
Sent: Tuesday, May 03, 2016 8:14 AM
To: Bates, Joni B.
Subject: FW: Kanis Creek Plat
Joni,
Any word on this plat?
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501,753.6814 Fax
501.351.6695 Cell
From: Thomas R. Pownall [mailto:thomas thomasen ineerin 2 O.ComI
Sent: Thursday, April 28, 2016 8:44 AM
To: Joni Bates (joni.bates@Centerp_ inteneM.com)
Subject: Kanis Creek Plat
Joni,
Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your
approval. Can I have a response by Monday?
Thanks!
Thomas R. Pownall, P.E.
Thomas Engineering Company
501.753.4463
501.753,6814 Fax
501.351.6695 Cell
***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links
or opening attachments from unknown sources, *****