Loading...
HomeMy WebLinkAboutS-1563-A ApplicationJames, Donna From: Thomas R. Pownall<thomas@thomasengineering2000.com> Sent: Thursday, April 28, 2016 8:47 AM To: Floriani, Vince; James, Donna Subject: Kanis Creek Plat (PVK) Attachments: KANIS CREEK BLOCK 2-PLAT.pdf Vince and Donna, Attached is the plat for Kanis Creek Subdivision (PVK Development). Please have Vance review it and let me know what else is needed to get this completed. We are being heard for the annexation on Monday. Thanks! I Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351.6695 Cell en GRAPHIC 3CALB _ _ r THIS PLAT_ , 1DCIIAIIII NAP T FINAL PLAT KANIS CREEK SUBDIVISION LUM THROUGH 1 AND DEDICATION DF A POKTION OF PRIDE VALLEY R CITY OF LITTLE ROCK S IN SE} NWj SECTION S, TOWNSHIP 1 NORTH, RANGE 13 WEST PULASKI COUNTY,ARKANSAS James, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Thursday, April 28, 2016 11:17 AM To: Thomas R. Pownall Cc: James, Donna Subject: RE: Kanis Creek Plat LRW has no objection to this plat. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.442.6042 From: Thomas R. Pownall[mailto:thomas@thomasengineering2000.com] Sent: Thursday, April 28, 2016 8:44 AM To: Vincent Hotho <Steven.Hotho@lrwu.com> Subject: Kanis Creek Plat Vince, Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your approval. Can I have a response by Monday? We are being heard by the LR board on Monday about the annexation and I don't expect a problem with that hearing. Thanks! Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351.6695 Cell 1 CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS FINAL PLAT NAME: KANIS CREEK LOTS 1-15 BLOCK 2 INSPECTOR REPORT I have made a final inspection of the improvements and find that: f All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. L Engineering Specialist Date: e5_-'3 ADD )EBBING SPECIALIST REPORT I leave reviewed the plat and find that the street names and street configuration are acceptable. G Addressing Specialist Nate:4121f� TRAFFTC ENGINEER REPOR I have reviewed the plat and find that: All streetlight installation, striping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. �] street signs should be ordered and billed to developer. Work orders have been prepared for signage. Certain improvements remain uncompleted and a punch list has been prepared and sent. Approved engineering drawings for streetlight system have been received and approved. Applicant is responsible to furnish as -built drawings once streetlights have been installed. r, G a Traffic Engineer Date: CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. As -built drainage plans in electronic form have been submitted. _ All other requirements for final plat approval have been satisfied. a �J Civil Engineer I/II Tate: S SURVEYOR REPORT I have reviewed the plat and find that: C All requirements for final plat approval have been satisfied. ti2La=:Q Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. IV2�- � Date: f I Design Review Engineer/Civil Engineering Manager Date: �__ Z 1%'7'41.0 Effective: April 28, 2016 James, Donna From: Thomas R. Pownall<thomas@thomasengineering2000.com> Sent: Wednesday, May 18, 2016 11:18 AM To: James, Donna Cc: Floriani, Vince Subject: PVK/ Kanis Creek Plat Attachments: PLAT UTILITY APPROVALS.pdf Donna, Attached are the utility approvals for the Kanis Creek/PVK Residential lots. I am delivering the maintenance bond to Vince today which will satisfy all of his requirements. Thanks Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351.6695 Cell Thomas R. Pownall From: Henderson, Jeremy <jhende9@entergy.com> Sent: Thursday, April 28, 2016 8:46 AM To: Thomas R. Pownall Subject: RE: Kanis Creek Plat Entergy approved. Thanks! Jeremy Henderson Engineering Associate Entergy Corporation 9 Entergy Ct. Little Rock, AR 722.11 501-223-6125 From: Thomas R. Pownall [mailto:thornas a thomaseri ineer!n 2fl00.com] Sent: Thursday, April 28, 2016 8:44 AM To: Henderson, Jeremy Subject: Kanis Creek Plat EXTERNAL SENDER. DO NOT click links if sender is unknown. DO NOT provide your user ID or password. Jeremy, Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your approval. Can I have a response by Monday? I believe all of the electric has been pulled and energized for this project. Thanks! Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501.351,6695 Cell 1 Thomas R. Pownall From: Vincent Hotho <Steven.Hotho@Irwu.corn> Sent: Thursday, April 28, 2016 11:17 AM To: Thomas R. Pownall Cc: James, Donna Subject: RE: Kanis Creek Plat LRW has no objection to this plat. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 M b I : 501.442.6042 From: Thomas R. Pownall [mailto:thomas thomasen ineerin 2O00.comj Sent: Thursday, April 28, 2016 8:44 AM To: Vincent Hotho <Steven.Hotho@Irwu.Com> Subject: Kanis Creek Plat Vince, Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road, The City of Little Rock requires your approval. Can I have a response by Monday? We are being heard by the LR board on Monday about the annexation and I don't expect a problem with that hearing. Thanks! Thomas R. Pownall, P,E. Thomas Engineering Company 501,753.4463 501.753.6814 Fax 501,351.6695 Cell 1 Thomas R. Pownall From: Jonathan Long <Jonathan.Long@carkw.com> Sent: Tuesday, May 03, 2016 9:03 AM To: Thomas R. Pownall Subject: RE: Kanis Creek Plat Approved by CAW. From: Thomas R. Pownall [malIto: thomas thomasen in erin 2000.com] Sent: Tuesday, May 03, 2016 8:15 AM To: Jonathan Long Subject: FW: Kanis Creek Plat Jonathan, Any word on this plat? Thomas R. Pownall, P.E. Thomas Engineering Company 501.753,4463 501.753.6814 Fax 501.351,6695 Cell From: Thomas R. Pownall [ma iIto: thomas thomasen ineer n 2000.Cam] Sent: Thursday, April 28, 2016 8:45 AM To: Jonathan Long Subject: Kanis Creek Plat Jonathan, Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your approval. Can I have a response by Monday? There was no new water mains installed given there was an existing main on the south side of Pride Valley Road. Thanks! Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753.6814 Fax 501,351.6695 Cell 1 Thomas R. Pownall From: Edwards, Micah B<micah.edwards@CenterpointEnergy.com> Sent: Wednesday, May 04, 2016 9:20 AM To: thoi-nas@tholrlasengineel-ing2000.com Cc: Bates, Joni B. Subject: RE: Kanis Creek Plat Attachments: KANIS CREEK BLOCK 2-PLAT.PDF Thomas, Sorry for the late reply; CenterPoint has no conflict with the proposed plat. Thanks, Micah Edwards, PE Engineer III Southern Gas operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Direct:501.377-4849 1 Fax:501-377-4733 1 Mobile:501-258-4373 >Cel wioint E11ergy From: Bates, Joni B. Sent: Tuesday, May 03, 2016 2.36 PM To: Edwards, Micah B Subject: FW: Kanis Creek Plat Did you send to someone to review yet? From: Thomas R. Pownall [maiito:thomas thomasen ineerin 2000.cam] Sent: Tuesday, May 03, 2016 8:14 AM To: Bates, Joni B. Subject: FW: Kanis Creek Plat Joni, Any word on this plat? Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501,753.6814 Fax 501.351.6695 Cell From: Thomas R. Pownall [mailto:thomas thomasen ineerin 2 O.ComI Sent: Thursday, April 28, 2016 8:44 AM To: Joni Bates (joni.bates@Centerp_ inteneM.com) Subject: Kanis Creek Plat Joni, Attached for your review is the plat of Kanis Creek Subdivision on Pride Valley Road. The City of Little Rock requires your approval. Can I have a response by Monday? Thanks! Thomas R. Pownall, P.E. Thomas Engineering Company 501.753.4463 501.753,6814 Fax 501.351.6695 Cell ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources, *****