200 Casey Drive, Maumelle, AR 72113 | Work: 501.851.3366
November 19, 2024
Mr. Dylan Warner
City of Little Rock
723 W. Markham Street
Little Rock, AR 72201
RE: The Reserve at Brodie Creek
Preliminary Storm Drainage Calculations
Little Rock, Arkansas
Mr. Warner,
Please see the attached preliminary storm drainage basin and detention calculations for the above
referenced project located off West 36th Street, at your earliest convenience. The numbers are based on
site field surveys and mapping reviews. If there are any questions or concerns regarding this project,
please do not hesitate to contact me at 501-851-3366 or Dustin@Holloway-eng.com.
The preliminary storm drainage analysis for this project was created using Hydraflow Hydrographs
Extension and Hydraflow Express for Civil 3D. Per the City of Little Rock Storm Drainage Ordinance, the
Rational Method of calculating runoff was used since the onsite drainage area for this project is less than
200 acres. The existing site is approximately 64.70 acres and will be developed as a single-family
subdivision. Existing offsite drainage conveys to the site via channelized flow coming from 272.2 acres on
the north side of W 36th Street as well as from 63.266 along the south side of W 36th Street but north of the
project site. The stormwater on the north side of W 36th Street is separated into 3 s eparated waterways and
flows through 3 separate pipe systems before draining onto the project site. The offsite contributing areas
along the south side of W 36th Street are separated into two areas which flow naturally onto the project site
and one area which is channelized by an existing pipe system before draining to the project site.
We are proposing to construct a new open channel to ditch to collect the upstream offsite stormwater and
convey it south the existing Brodie Creek waterway. Onsite runoff will be captured by new stormwater pipe
systems which will also capture and convey stormwater to the Brodie Creek waterway.
Thank you for your assistance.
Sincerely,
Dustin Welch, EI, AC
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Nov 19 2024
<Name>
Trapezoidal
Bottom Width (ft) = 20.00
Side Slopes (z:1) = 1.00, 1.00
Total Depth (ft) = 4.00
Invert Elev (ft) = 324.00
Slope (%) = 1.50
N-Value = 0.027
Calculations
Compute by: Known Q
Known Q (cfs) = 1043.00
Highlighted
Depth (ft) = 3.42
Q (cfs) = 1,043
Area (sqft) = 80.10
Velocity (ft/s) = 13.02
Wetted Perim (ft) = 29.67
Crit Depth, Yc (ft) = 4.00
Top Width (ft) = 26.84
EGL (ft) = 6.06
0 5 10 15 20 25 30 35 40
Elev (ft) Depth (ft)Section
323.00 -1.00
324.00 0.00
325.00 1.00
326.00 2.00
327.00 3.00
328.00 4.00
329.00 5.00
Reach (ft)