HomeMy WebLinkAboutS-1549 ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING ,APPROVALS
FINAL PLAT NAME
_miracle acres
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist
Date:
ADDRESSING SPECIALIST'S REPORT
I h 2rehIt d fi that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for
billing to developer:
Certain improvements remain uncompleted and a punch list has been prepared and sent.
o _T JL& 1X;KV0
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
Traffic Engineer Date:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied. l
Civil Engineer I/II Date: 10 1 1 'Y I C(. _
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All requirements f tnal plat a roval have been satisfied.
/�. •�� Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date:
Design Review Engineer/Civil Engineering Manager
July 2005
Date: O O