HomeMy WebLinkAboutS-1538-M Staff AnalysisITEM NO.: 2.
NAME: Gateway Town Center Lot 4 Replat
LOCATION: located on Bass Pro Parkway and Bass Pro Drive
Planning Staff Comments:
S-1538-M
1. Provide notification of the abutting property owners including the certified abstract list,
notice form with affidavit executed and proof of mailing. The notice must be mailed no
later than November 30, 2016. The Office of Planning and Development must receive the
proof of notice no later than December 9, 2016.
2. Provide the proposed phasing plan. Will the lots be developed and final platted in a single
phase or as market demands?
3. Provide a letter of agreement from the adjacent property owner indicating the ability to
take access to the private drive located on the Outlets of Little Rock property.
4. Indicate the building lines for all the lots.
5. The plat indicates Lot 4R-6 as a lot without public street frontage. (Section 31-231)
Variance/Waivers:
Advanced grading
Lot without public street frontage
Public Works Conditions:
1. With site development, provide the design of street conforming to the Master Street Plan.
Construct commercial street improvement to the streets including 5-foot sidewalks with
the planned development. The commercial street should be 36 feet in width with
sidewalks on both sides.
2. All driveways shall be concrete aprons per City Ordinance. Show the proposed driveway
locations for each lot. Driveway spacing on commercial streets is 250 feet between
driveways and from street intersections and 125 feet from side property lines.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-of-
way prior to occupancy.
4. A grading permit in accordance with Section 29-186 (c) & (d) will be required prior to any
land clearing or grading activities at the site. Other than residential subdivisions, site
grading and drainage plans must be submitted and approved prior to the start of
construction. Is an advance grading variance being requested to clear and grade the lots
with construction of the street?
5. Stormwater detention ordinance applies to this property. A regional detention facility is
provided west of the subject property.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
7. Street improvement plans shall include signage and striping. Public Works must approve
completed plans prior to construction.
8. A concrete apron is required to be provided at the intersection of the proposed private
street and Bass Pro Parkway.
9. Streetlights are required by Section 31-403 of the Little Rock code. Provide plans for
approval to Traffic Engineering. Streetlights must be installed prior to platting/certificate of
occupancy. Contact Traffic Engineering 501.379.1813, Greg Simmons,
gsimmons@littlerock.gov for more information.
10. Hauling of fill material on or off site over municipal streets and roads requires approval
prior to a grading permit being issued. Contact Travis Hebner, Public Works Traffic
Engineering, 621 South Broadway, 501.379.1805, therbner[cr3_littlerock.gov for more
information.
11. Provide the proposed street name(s). Street names and street naming conventions must
be approved by Glenn Haley, Public Works, ghaley(a7Iittlerock.gov or 501.371.4537.
12. Damage to public and private property due to hauling operations or operation of
construction related equipment from a nearby construction site shall be repaired by the
responsible party prior to issuance of a certificate of occupancy.
13.Accessible pedestrian access should be provided within, to, and from the proposed
subdivision from existing adjacent developments.
Utilities and Fire Department/County Planning:
Little Rock Wastewater: Sewer main extension required, with easements, if new sewer
service is required for this project. Contact Little Rock Wastewater Utility for additional
information.
Entergy: Entergy does not object to this proposal. A three phase, underground electrical
line runs along the western edge of this property. There do not appear to be any existing
conflicts with Entergy facilities on this property. Service to any of the proposed lots contained
in the replat of Lot 4 will require quite a bit of prework and discussion. Contact Entergy in
advance to discuss future service requirements, new facilities locations/extensions and
adjustments to existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements in effect at
the time of request for water service must be met.
Fire Department:
1. Maintain Access.
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access road,
the minimum road width shall be 26 feet, exclusive of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas
Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall not
exceed 10 percent in grade except as approved by the fire chief.
4. Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an asphalt,
concrete or other approved driving surface capable of supporting the imposed load of fire
apparatus weighing at least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain fire apparatus
access roads as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
i. Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
building are equipped throughout with approved automatic sprinkler
systems.
c. D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of
the maximum overall diagonal dimension of the lot or area to be served,
measured in a straight line between accesses.
6. 30-foot Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix D of
the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4.
a. D105.1 Where Required. Where the vertical distance between the grade plane
and the highest roof surface exceed 30', approved aerial fire apparatus access
roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls,
whichever is greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
c. D105.3 Proximity to building. At least one of the required access routes meeting
this condition shall be located within a minimum of 15 feet and a maximum of
30 feet from the building, and shall be positioned parallel to one entire side of
the building. The side of the building on which the aerial fire apparatus access
road is positioned shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be located over
the aerial fire apparatus access road or between the aerial fire apparatus road
and the building. Other obstructions shall be permitted to be places with the
approval of the fire code official.
7. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Capt. Tony
Rhodes 501,918.3757 or Capt. John Hogue 501.918.3754). Number and Distribution of
Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received_
County Planning: No comment.
Rock Region Metro: Location is currently served by METRO on route 23. Provide
sidewalks along Bass Pro Parkway for access to the transit route in accordance to current
development requirements.
Building Code: No comment.
Planninq Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, November 30, 2016.
December 15, 2016
Iti ZITLAML[61Wa
NAME: Gateway Town Center Lot 4 Replat
LOCATION: Located on Bass Pro Parkway and Bass Pro Drive
DEVELOPER:
Bass Pro Outdoor World LLC
2500 E. Kearney
Springfield, MO 65898
ENGINEER:
McGetrick Engineers
11601 Bass Pro Parkway - 72210
P.O. Box 30441
Little Rock, AR 72260
AREA: 22.36 acres NUMBER OF LOTS: 7
WARD: 7 PLANNING DISTRICT- 16 — Otter Creek
CURRENT ZONING: C-4, Open Display District
FILE NO.: S-1538-M
FT. NEW STREET: 0 LF
CENSUS TRACT: 42.13
VARIANCE/WAIVERS: A variance from the City's Land Alteration Ordinance to allow
grading of future phases with the placement of the basic infrastructure.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting to replat Lot 4 Gateway Town Center into seven
(7) lots ranging in size from 2-acres to 14-acres. The lots will be served via a
private street with access to Bass Pro Parkway and an adjacent service drive
serving the Outlets of Little Rock Shopping Center. Three (3) of the lots will have
frontage on Bass Pro Parkway. Proposed Lots 4R-2, 4R-6 and 4R-7 will have
access from the private access easement. The easement is indicated with
a 60-foot width to provide access and utilities. Lot 4R-1 is indicated with
12.07-acres and contains the existing Bass Pro Store.
B. EXISTING CONDITIONS:
A portion of the area is paved and is currently being used by Bass Pro for boat
storage. The remainder of the area has been used as a materials storage area
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
for the development of Bass Pro and the development area as a whole. There
are a few trees located along Bass Pro Parkway. Bass Pro Parkway has been
constructed to Master Street Plan standards including curb, gutter and sidewalk.
The drive for the Outlet Mall has also been completed. There are no sidewalks in
place along the property frontage.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners, the Bentley Court Property Owners Association, the
Chateaus on Stagecoach Property Owners Association, the Otter Creek
Homeowners Association and Southwest Little Rock United for Progress were
notified of the public hearing.
D. ENGINEERING COMMENTS -
PUBLIC WORKS CONDITIONS-
1. With site development, provide the design of street conforming to the
Master Street Plan. Construct commercial street improvement to the streets
including 5-foot sidewalks with the planned development. The commercial
street should be 36 feet in width with sidewalks on both sides.
2. All driveways shall be concrete aprons per City Ordinance. Show the
proposed driveway locations for each lot. Driveway spacing on commercial
streets is 250 feet between driveways and from street intersections and
125 feet from side property lines.
3. Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
4. A grading permit in accordance with Section 29-186 (c) & (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. Is an advance
grading variance being requested to clear and grade the lots with
construction of the street?
5. Stormwater detention ordinance applies to this property. A regional
detention facility is provided west of the subject property.
6. If disturbed area is one (1) or more acres, obtain a NPDES stormwater
permit from the Arkansas Department of Environmental Quality prior to the
start of construction.
7. Street improvement plans shall include signage and striping. Public Works
must approve completed plans prior to construction.
N,
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
8. A concrete apron is required to be provided at the intersection of the
proposed private street and Bass Pro Parkway.
9. Streetlights are required by Section 31-403 of the Little Rock code. Provide
plans for approval to Traffic Engineering. Streetlights must be installed prior
to platting/certificate of occupancy. Contact Traffic Engineering
501.379.1813, Greg Simmons, simmons littlerock. ov for more
information.
10. Hauling of fill material on or off site over municipal streets and roads
requires approval prior to a grading permit being issued. Contact Travis
Hebner, Public Works Traffic Engineering, 621 South Broadway,
501.379.1805, therbner@littlerock.goy for more information.
11. Provide the proposed street name(s). Street names and street naming
conventions must be approved by Glenn Haley, Public Works,
ahaley(c)littlerock.gov or 501.371.4537.
12. Damage to public and private property due to hauling operations or
operation of construction related equipment from a nearby construction site
shall be repaired by the responsible party prior to issuance of a certificate of
occupancy.
13. Accessible pedestrian access should be provided within, to, and from the
proposed subdivision from existing adjacent developments.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Little Rock Wastewater: Sewer main extension required, with easements, if new
sewer service is required for this project. Contact Little Rock Wastewater Utility
for additional information.
Entergy: Entergy does not object to this proposal. A three phase, underground
electrical line runs along the western edge of this property. There do not appear
to be any existing conflicts with Entergy facilities on this property. Service to any
of the proposed lots contained in the replat of Lot 4 will require quite a bit of
prework and discussion. Contact Entergy in advance to discuss future service
requirements, new facilities Iocations/extensions and adjustments to existing
facilities (if any) as this project proceeds.
Centerpoint Enemy. No comment received.
AT & T: No comment received.
Central Arkansas Water: No objection. All Central Arkansas Water requirements
in effect at the time of request for water service must be met.
151
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: 5-1538-M
Fire Department,
1. Maintain Access.
2. Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations
as per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet,
exclusive of shoulders.
3. Grade. Maintain fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
4. Loading. Maintain fire apparatus access road design as per Appendix D of
the 2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed
shall be accessible to fire department 'apparatus by way of an approved fire
apparatus access road with an asphalt, concrete or other approved driving
surface capable of supporting the imposed load of fire apparatus weighing at
least 75,000 pounds.
5. Commercial and Industrial Developments — 2 means of access. - Maintain
fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1
a. Section D104.1 Buildings exceeding three stories or 30 feet in
height. Building or facilities exceeding 30 feet or three stories in
height shall have at least two means of fire apparatus access for
each structure.
b. Section D104.2 Building exceeding 62,000 square feet in area.
Buildings or facilities having a gross building area of more than
62,000 square feet shall be provide with two separate and
approved fire apparatus access roads.
i. Exception: Projects having a gross building area of up to
124,000 square feet that have a single approved fire
apparatus access road when all building are equipped
throughout with approved automatic sprinkler systems.
c. D104.3 Remoteness. Where two fire apparatus access roads are
required, they shall be placed a distance apart equal to not less
than one half of the length of the maximum overall diagonal
dimension of the lot or area to be served, measured in a straight
line between accesses.
0
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
6. 30-foot Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D 105.1 — D 105.4.
a. D105.1 Where Required. Where the vertical distance between the
grade plane and the highest roof surface exceed 30', approved
aerial fire apparatus access roads shall be provided. For the
purposes of this section the highest roof surfaces shall be
determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet
walls, whichever is greater.
b. D105.2 Width. Aerial fire apparatus access roads shall have a
minimum unobstructed with of 26', exclusive of shoulders, in the
immediate vicinity of the building or portion thereof.
c. D105.3 Proximity to building. At least one of the required access
routes meeting this condition shall be located within a minimum of
15 feet and a maximum of 30 feet from the building, and shall be
positioned parallel to one entire side of the building. The side of the
building on which the aerial fire apparatus access road is positioned
shall be approved by the fire code official.
d. D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the
aerial fire apparatus road and the building. Other obstructions shall
be permitted to be places with the approval of the fire code official.
7. Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas
Fire Prevention Code. Section C101 — C105, in conjunction with Central
Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock Fire
Marshal's Office (Capt. Tony Rhodes 501.918.3757 or Capt. John Hogue
501.918.3754). Number and Distribution of Fire Hydrants as per Table
C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: Location is currently served by METRO on route 23.
Provide sidewalks along Bass Pro Parkway for access to the transit route in
accordance to current development requirements.
F. ISSU ESITECH N ICALIDES IGN:
Building Code: No comment.
5
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (November 22, 2016)
Mr. Pat McGetrick of McGetrick Engineering was present representing the
request. Staff presented an overview of the item stating there were few
outstanding technical issues in need of addressing related to the proposed plat.
Staff requested Mr. McGetrick provide the proposed phasing plan, the building
lines and the agreement with the adjacent property owner concerning access.
Public Works comments were addressed. Staff requested Mr. McGetrick provide
the locations of the proposed driveways. Staff also stated a grading permit was
required prior to any land clearing or grading activities on the site. Staff
questioned if the request included a variance from the City's Land Alteration
Ordinance to allow grading of the entire plat area with the installation of the
streets and basic infrastructure. Staff stated the City's Stormwater Detention
Ordinance would apply to the development of the lots. Staff stated if the
driveway/private street was to include a name the name should be approved by
Public Works staff. Staff stated a concrete apron was required for the private
street at the intersection with Bass Pro Parkway.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion.
The Committee then forwarded the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to staff addressing the
technical issues associated with the request raised at the November 22, 2016,
Subdivision Committee meeting. The applicant has provided the proposed
phasing plan and the proposed building lines. The applicant has indicated they
are working to secure a written agreement from the adjacent property owner
concerning access to the drive serving the property to the east. Staff
recommends prior to the issuance of a grading permit the applicant provide a
written agreement between the two (2) property owners indicating the access as
proposed is acceptable. The applicant has provided the proposed driveway
locations on the preliminary plat as requested by staff.
The request is to allow the replatting of Lot 4 Gateway Town Center into seven
(7) lots ranging in size from 2-acres to 12-acres. The lots will be served via a
private street with access to Bass Pro Parkway and an adjacent service drive
0
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
serving the Outlets of Little Rock Shopping Center to the east. Three (3) of the
lots will have public street frontage on Bass Pro Parkway. Proposed Lots 4R-2,
4R-6 and 4R-7 will be served via a private street/access and utility easement.
The easement is indicated with a 60-foot width adequate to meet the typical
minimum requirements for a commercial street. Lot 4R-1 is indicated with
12.07-acres and contains the existing Bass Pro Store.
The applicant is requesting a variance from the City's Land Alteration Ordinance
to allow grading of the site with the installation of the basic infrastructure of the
development. The lots will be final platted based on market demand.
Staff is supportive of the applicant's request. The property is zoned C-4, Open
Display District. The lots as indicated are more than adequate to meet the typical
development criteria of the zoning district. To staff's knowledge there are no
outstanding technical issues associated with the proposed replat request.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends prior to the issuance of a grading permit for the new lots the
applicant provide a written agreement between this property owner and the
property owner to the east allowing access to the drive serving the development
to the east.
Staff recommends approval of the variance request from the City's Land
Alteration Ordinance to allow grading of future phases with the installation of the
basic infrastructure for the subdivision.
PLANNING COMMISSION ACTION:
(DECEMBER 15, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation that prior to the issuance of
a grading permit for the new lots the applicant provide a written agreement between this
property owner and the property owner to the east allowing access to the drive serving
the development to the east. Staff presented a recommendation of approval of the
variance request from the City's Land Alteration Ordinance to allow grading of future
7
December 15, 2016
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-1538-M
phases with the installation of the basic infrastructure for the subdivision. There was no
further discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 9 ayes, 0 noes, 1 absent and 1 open position.