Loading...
HomeMy WebLinkAboutS-1538-G ApplicationCIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME —Gateway Office Park Phase II INSPECTOR REPORT I have made a final inspection of the improvements and find that: All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. Certain Improvements remain uncompleted and a punch list has been prepared and sent. Engineering Specialist ADDRESSING SPECIALIST'S REPORT Date: I have revie d the plat and find that the street names and street configuration are acceptable. Addressing Specialist Date: TRAFFIC ENGINEER R' RT I have reviewed the plat and find that: All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. Traffic Engineer CIVIL ENGINEER REPORT Date: I have reviewed the file for this matter and find that: The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. Civil Engineer I/II Date: i SURVEYOR'S REPORT I have reviewed the plat and find that: All requirements for final plat approval have been satisfied. l Surveyor Late: I =s MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. .�.+�. Date: Design Review Engineer/Civil Engineering Manager January 15, 2014 "vuN A` �`AxF ��^PA fix=�4 $�F�e v=��s p4cS�X '94€m '�F g4m m��ex !N - r � 3a e `l7 o a z a vN§j a ;n g � R �b B C y � b h �q mad 6 O LV aka. Pr r w � s P. a 1 /28/2014 Pri nt Subject: RE: final plat gateway town centdr phase 2 From: CEARLEY, MICHAEL D (MCEARLE@entergy.com) To: mcgetrick2@sbcglobal.net; jim.boyd@Irwu.com; Cc: daniel.tull@carkw.com; Joni.bates@centerpointenergy.com; an0142@att.com; Date: Thursday, January 16, 2014 7:26 AM For Entergy, we will need additional space for the switchgear pad when the lot owners begin construction. It would be easier to secure now than working with them individually. We would require an area of 14'xl4' for the pad and whatever conduit distance from the existing easement. Also, we need 12 to 15 feet in the front and back of the switchgear to operate hotsticks. Thanks .... Milce From: MCGETRTCK MCGURICK Finailto:rncg_ ctricl<2nsbcg_ lobal.nctl Sent: Monday, January 13, 2014 7:19 AM To: Jim Boyd Cc: daniel till]; Joni Bates; an014_7natt.r_.oM CFART FY MIC11AEL D Subject: final plat gateway town center phase 2 We are trying to file the final plat for phase 2 of Gateway Town Center. No utilities are in place for this area yet. The utilities will be constructed this spring, in the easements shown. Please review the plat and let us know if it is ok. If you have any questions please contact us. Thanks, Pat aho thank Vj 1/23/2014 Print Subject: RE: final plat gateway town center phase 2 From: Daniel Tull (Daniel.Tull@carkw.com) To: mcgetrick2@sbcglobal.net; Date: Monday, January 13, 2014 9:14 AM CAW approved with no comment Thank You Central Arkansas Water Daniel Tull, Engineering Technician danee tulUcarkw.com 501-377-1245 From: MCGETRICKMCGETRICK [mailto:mcgetrick2@sbcglobal.net] Sent: Monday, January 13, 2014 7:19 AM To: Jim Boyd Cc: Daniel Tull; Joni Bates; an0142@att.com; mcearle@entergy.com Subject: final plat gateway town center phase 2 We are trying to file the final plat for phase 2 of Gateway Town Center. No utilities are in place for this area yet. The utilities will be constructed this spring, in the easements shown. Please review the plat and let us know if it is ok. If you have any questions please contact us. Thanks, Pat about:blank 1/1 1123/2014 Print Subject: FW: final plat gateway town center phase 2 From: Zinser, Brandon M (Brandon.Zinser@centerpointenergy.com) To: mcgetrick2@sbcglobal.net; Cc: joni.bates@centerpointenergy.com; Date: Monday, January 13, 2014 10:53 AM Pat, CenterPoint Energy has no objection to the final plat for Phase 2 of Gateway Town Center in Little Rock, AR as shown on the attachment. Thanks, Brandon M. Zinser, P.E. Engineer III Southern Gas Operations I ArkansastOldahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock AR 72201 Direct:501-377-4930 1 Fax:501-377-4733 1 Mobile:501-425-2289 centerFoint Energy From: Bates, Joni B. Sent: Monday, January 13, 2014 10:30 AM To: Zinser, Brandon M Subject: FW: final plat gateway town center phase 2 Please review about:blank 1/2 1/23/2014 Print From: MCGETRICK MCGETRICK [mailto: mcoetrick2@a sbcglobal.net] Sent: Monday, January 13, 2014 7:19 AM To: Jim Boyd Cc: daniel tull; Bates, Joni B.; an0142(@att.com; rncearFeC'7entergy.com Subject: final plat gateway town center phase 2 We are trying to file the final plat for phase 2 of Gateway Town Center. No utilities are in place for this area yet. The utilities will be constructed this spring, in the easements shown. Please review the plat and let us know if it is ok. 9 you have any questions please contact us. Thanks, Pat about:blank 2/2 a. 041 a N >;a a` y, alp ggl �N4� p� gjl� s 7Sgi+io VIM 2g.z i�— X Q E 4 Atsb R ?� MQ r sF g ngl S .+xl Ak e R 19 x g: F n• ~ 8 g? s� r� 01) i n •l a m E ! a =jam i D H� N O~ yz C') m Z H �R111>l. e� tM _ OW 1 s C] 0 9 CO a -If 0 ?, :::e m la C� -3 v +� �- 9 �3 1 /23/2014 ' Print Subject: FW: final plat gateway town center phase 2 From: NAJI, ALLISON V (an0142@att.com) To: mcgetrick2@sbcglobal.net; Date: Thursday, January 23, 2014 9:01 AM AT&T approves of this plat for the Gateway Phase II as of 1/23/14. Thanks, Allison Naji AT&T -Arkansas Mgr. OSP Planning & Engineering Design 1111 W. Capitol, Room 465 Little Rock, AR 72201 (501)373-1168 From: MCGETRICK MCGETRICK[mailto:mcgetrick2@sbcglobal.net] Sent: Thursday, January 23, 2014 9:00 AM To: NAJI, ALLISON V Subject: Fw: final plat gateway town center phase 2 ----- Forwarded Message ----- From: MCGETRICKMCGETRICK<nrgetrick2 s bc g lobal.net> To: Jim Boyd <iimboydgh-wu.com> Cc: daniel tull <daniei; tullacarkw.cotn>; Joni Bates <ioni.bates(ebcenterpointen a y.cotn>; "an0142(q7att.com" <an0142(&att.com>; "mcearle r@,entetgy.com" <mcearie@.entergy.conv Sent: Monday, January 13, 2014 7:19 AM Subject: final plat gateway town center phase 2 about:blank 1/2 1/23/2014 ' Pri nt We are trying to file the final plat for phase 2 of Gateway Town Center. No utilities are in place for this area yet. The utIties will be constructed this spring, in the easements shown. Please review the plat and let us know if it is ok. If you have any questions please contact us. Thanks, Pat aboutblank 212 • z ID a / ♦ ����°b Q 0 C� Rod _i kn FY oe \ I I I � 1 / w Z f w p U d Z— Q3w '+� ~ 0� j 1 u 8 a WY s€ a b � a r aig ! � � ie ��L• iYln� ��� �� i le go Rp ffi N R i N- b�? b Ile �� tib b Ib I I[[ rig v i 7�6y�j }py `� ■x 35 \lo -w IN� A � F �� C���a I• r 1 Sewer is available to this property and no WE. THE EITITY NAT OWHBS Or THE REAL additional easements are required bby ESTATE, MOWN AND DEN`RIBE NEADN. DO HEART CAND THAT wE HAVE 1.N0 HERBY PurTEO, AND susOmDEo, AND DO HfltFAr LR W. LR W has no objection to filing EST DE ,PLAT, AND 5uBDAWDE 5A0 RG ESTATE IN ACCOIDAN[E WTM THIS PLAT. this plat. James Boyd, P.E. °D D vATc IS, rAEwmN Developer Funded Engineer Scale 1" = 30 ft n700 N. eRIDo� f,,d ,aalLcs uc 1LIe N. SN AR 7221 UIUe Rock, PR 72212 Little Rock Wastewater ,' Lv{1�1, I IRS2'T 20B12B1 January 30, 2014 ® d01 201A002424 ,( ♦ a, COLONEL 0.Exx BONDAN ROAD DEVELOPUNr `` S ..ycoc.� I, PAUL N NHI1E, HEREBY CERTIFY TIAT THIS PUILRT CORRECTLY REPRESENTS A BwNCARr rLhuMAl ALL INTx /EMC / I NOA MENTS REWi EI ACTIALLYFOO BYEEN T AND COORDINATES (NORTH ZONE) HON—AT ARE CORRECTLY SHOWN HEREON AND THAT ALL �. SURNEWNG RE. RENONIS OF THE UTRE R00t AIBON90H RULES AND REOULAnDS iRAR1M [; h y yY`Rry,rN r1 Ms+ i H K BEEN CDHPUED NIT, Y -IRtM / Ar - w i'i •� •• N •• I— / f 1 WE BY E>RWinl NNRE RE. SIDEERNEYOR xa E R.ARE AS / R320,00' n MR "W2V E I1.TIMOTHY E DATERx HERBY CERTIFY 1!7 r CORRECnY REPRESENTS A PNLc MADE By ENGINEERING AND THAT THE I I EEROUIRDD NOT H E Ui11E ROD( EUBDINAOR RULES AND REaunaxs NAME BED CUE MM 3 I I 1 eA C B" 14WON An 4 ", t� I 1 "EOSEUE] MIA fL—A 1 EhW�. M }1Lt W1N Ws0. DDI ST I I L O T 3R ' RURSUANi TO THE U E ROD 9 BDIWDON A RULES AND REGULATIONS. AND ALL OF TIE 3.50 acres crnwxaxs Cr APPRovu HAHNc — f I 4� ONPLEIEO. DO—MEN,IN HERBY TITSISER V ACCEPIEO CTHCAIE IS HERBY ELECUTE UNDER TIE AUIHCRTY CF SAD RUBES AND BEWUTOHS 3 / / DATE OF ENEwnox Cw RON SOON PLANNING 1 /' �� IRTFIE'ATE Of RFCOR wOOf RFCpR wO HE s� uY�s [.,v . t/1'(I�RDH�pLPINS PINS WERE SET AT ALL LOT CORNEAS F- °WAGE AND/OR Dz6 ARE TO BE USED LOTS RED TOIA PONTF INS ARE EAsO LINES TO A POT P NTS ON A WELT UxES AND HOT POINTS ON A ' A .I—.IND ALONG CURNEE ARE NBfF22'35•W • 1 ! fDEq. eR R9slTc l�m06 D�g4eq f� 01CN[L OEw B M WOAD Ee1!S8'YYt PLAT OF LEGAL DESCRIPTION LOT 3. THE NI EAT TRIODE DEEM, .w ADOmPV TO TIE CRY OP LITRE LOT 3R ROot, PUUSa --. ATUNE-. AND THE VILLAGE AT ERODIE CREEK PART Or THE SWI/A OF SECTION le, i-I-X, R-IJ-W, I1NB ROCK. PUVSNI cwNrr, ARNANSAs. MORE PARRCUNRY DESCBSED AS ELLONS: BECFNxWOIIA G AT THE HDREST CORNER OF LOT 3, THE NIUAGE AT BRODIE CREEK, AN ADDITION TO THE CITY OF hems". Ta Aroro• ryTL.[ B.�UNE OFSMO M GIENN LITTLE ROCK, ARKANSAS PLAZA DRNf; 111ENCE SOUTNEIiY ALONG SUD WEST PoCHT-OG-WAY UHE BEING [A[ AN p A SIRBO fGt. MOVE N! EO TxE fd9..Lp(DA1Pgtle BDAA p AND IAI NiTTSf 3Zr6HlxEW�4 4C Ipr'.RTSITY Ld 1L�111 R. TO THE PONT OF BEDNNING, CO —NO 21,1551 SO. FT. OR GM ACRES MORE OR LESS BEING A REPLAT OF LOT 3, THE VILLAGE AT BRODIE CREEK AND PART OF THE SW1/4 OF SECTION 16, T-1-N, R-13-W, NO PORTION OF THIS PROPERTY IS LOCATED WITHIN THE 100 YEAR FLOOD BOUNDARY AS SHOWN ON THE FLOODWAY, FLOOD BOUNDARY AND ROOD LITTLE ROCK, PULASKI COUNTY, ARKANSAS INSURANCE WORK ADP ER UTTLE ROCN, ARHANEAS JANUARY, 2014 ,ae 11A-025P 1W A1(4 Er {C V><e Nr ..R nwnlrDaw YT,nn2n. a � zz S' W � aCvz¢ y aiR E• 0 $RQ wa wa F QE a a�0 8 Iyk $h 3 ga big Z 3 Ig R a>6� �q€� Rol id a Yg jd12 g w o d W 60 ` f 3 lb did b b Lalj 1 u' i Sing ijC a i i 'bq �b FzIf Nrib;u C iW ' b ��< �b b� 4 N� _� � u u \ o � "o ti8 T A-, THOMPSON ARCHITECTURAL GROUP, INC. Perry Thompson, III Architect, RPLS, ID P.O. BOX 8113 / TYLER, TX 75711 Phone (903) 871-0200 / (903) 539-4067 thom3287@yahoo.com VASQUEZ ENGINEERING, L.L.C. Consulting, Design & Management JUAN J. VASQUEZ, P.E. PRESIDENT 705 W. Ave. B Suite 216 Garland, TX 75040 Office 972-272-4610 Fax 972-272-4620 Cell 469-951-3526 jvasquez@vasquezengineering.com