HomeMy WebLinkAboutS-1538-D-1 Map 1B PLAN AT DRIVE-THRU
SCALE: 1" = 20'-0"
ASI NOb - ADD NEW
PROPANE TANK
(9 OF WINDC
PROJECT
NORTH
SET BACK REQUIREMENTS:
SLAB MINIMUM OF 25' FROM MINOR
ELECTRICAL (LIG IT POLE, OUTLET,
AIR/ WATER STATION)
SLAB MINIMUM OF 50' FROM
MAJOR ELECTRICAL OR
STRUCTURE (POWER POLE, FUEL
TANKS, DRAINAGE STRUCTURE)
6",0 STEEL BOLLARDS FILLED
WITH CONCRETE, PAINT
RE: D/SP1
CONCRETE SLAB: 14'-0" X 28'-0"
Xb" THICK WITH 04 BARS AT 24"
0,C.E.W.
C PLAN AT PROPANE TANK
SCALE: 1/8" = 1'-0"
DOME CONC. CAP
C " DIA. STEEL PIPE
FILL W/ 3000 PSI
CONCRETE
PAINT YELLOW
SLOPED TOP
a.. d
6" CONC. SLAB
EDGE OR SLAB
IS" DIA. 3000 PSI
CONCRETE
PROJECT
NORTH
ASI NO.& - ADD BOLLARD
DETAIL
D BOLLARD DETAIL
SCALE: 3/4" = 1'-0"
ASI NO.12-RELOCA
TIRE STORAGE TO
BUILDING
ATE PLAN
SCALE: 1" = 40'-0"
PROJECT
NORTH
Y
I==4 U
1P��O1� Lo
F� u')
00
N
00
Y V Lo
O
V
O
R
o
z
UDw
O
H
m
O
d
O
MO
N
N
UJ
Y
W
>
O
H
Z
-
W
U
O
w
J
w
F-
z
Q
co
I
J
H
0
(*\\-/v e)
d
n
V
a
0
U