HomeMy WebLinkAboutS-1076-C Staff AnalysisITEM NO.: 3. S-1076-C
NAME: Moon Distribution Subdivision Site Plan Review
LOCATION: located at 2800 Vance Street
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract
list, notice form with affidavit executed and proof of mailing. The notice must be
mailed no later than March 19, 2014. The Office of Planning and Development must
receive the proof of notice no later than March 28, 2014.
2. Provide the building coverage, both the principal and accessory, in square feet.
3. Provide the floor area, principal and accessory of the proposed structures.
4. Provide the proposed number of parking spaces, employee and visitor existing and
proposed.
5. Provide a note on the site plan indicating the maximum building height. The
maximum height allowed in the 1-2 zoning district is 45-feet.
Variance/Waivers: None requested.
Public Works Conditions:
1. A grading permit in accordance with Section 29-186 (c) and) will be required prior to
any land clearing or grading activities at the site. Other than residential subdivisions,
site grading and drainage plans must be submitted and approved prior to the start of
construction.
2. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
3. Easements are required for all stormwater drainage areas.
4. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
5. The new addition is located within the 100 year floodplain. The addition to the
structure is required to be constructed to a minimum finish floor elevation of 257.75
feet or higher is required and shown on grading plans.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main relocation required prior to construction of proposed
warehouse. Contact Little Rock Wastewater Utility for additional information.
Item # I
Entergy: There do not appear to be any Entergy facilities in conflict with this project.
The developer/builder should contact Entergy well in advance if a service upgrade is
required.
Center -Point Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer
3. Contact Central Arkansas Water if additional fire protection or metered water service
is required.
4. Contact Central Arkansas Water regarding the size and location of the water meter.
5. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
6. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 377-1226 if you would
like to discuss backflow prevention requirements for this project.
8. The facilities on -site will be private. When meters are planned off private lines.
Private facilities shall be installed to Central Arkansas Water's material and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of Customer Owned Line agreement
is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the Little
Rock Fire Department for additional information.
County Planning: No comment.
Item # I
CAT& Site served by the #6 Granite Mountain and #19 Hensley Express.
Parks and Recreation: No comment received.
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. Interior landscape areas shall comprise a minimum of eight (8) percent of any
vehicular use area containing twelve (12) or more parking spaces.
3. An automatic irrigation system to water landscaped areas will be required.
4. Prior to the issuance of a building permit, it will be necessary to provide an approved
landscape plan stamped with the seal of a registered landscape architect.
5. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan; Submit four (4) copies of a revised preliminary plat/plan (to include
the additional information as noted above) to staff on Wednesday, February 5, 2014.
Item # I
April 3, 2014
ITFM NO - 3
NAME: Moon Distribution Subdivision Site Plan Review
LOCATION: Located at 2800 Vance Street
DEVELOPER:
FNGINFFR:
Thomas Engineering Company
3810 Lookout Road
North Little Rock, AR 72116
AREA: 71 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT
VARIANCEMAIVERS
BACKGROUND:
NUMBER OF LOTS: 1
1-2, Light Industrial
7 — 1-30
5
None requested.
FILE NO.: S-1076-C
FT. NEW STREET: 0 LF
On March 20, 2003, the Little Rock Planning Commission approved a request to allow
the placement of a second building on this site. The site contained a warehouse
structure with a parking lot and paved surface area which provided vehicular truck
movements associated with the warehouse operation.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The current request is to allow a building addition to an existing warehouse
building. The site currently contains two (2) buildings with 189,514 square feet of
gross floor area. The new addition contains 118,000 square feet of gross floor
area. The lot coverage of the existing building is 6.08 percent. There are
190 existing parking spaces on the site. There are an additional 54 parking
spaces proposed with the new construction. The maximum building height
proposed is 45-feet.
April 3, 2014
SUBDIVISION
ITEM NO.: 3 (Cont.) _ FILE NO.: S-1076-C
The request is for approval of a site plan per Section 31-13 of the Little Rock
Code to allow the construction of multiple buildings on a single site.
B. EXISTING CONDITIONS:
The site contains two (2) warehouse buildings, an office and associated parking.
There is a "guard shack" located on the site with a six (6) foot chain link fence in
place around the perimeter. The proposed building addition is located along the
southern portion of the largest warehouse building. The new paved area will be
located south of the existing paved area located between the two (2) warehouse
buildings.
Only a portion of East 28th Street, a private street, has been constructed adjacent
to the site. The street has been constructed with curb and gutter. South Vance
Street is also a private street. The street has been constructed with a center
median and curb and gutter. No sidewalks are in place on either street.
Other uses in the area include a large distribution company to the east of the site
and large tracts of vacant land. The sites along East Roosevelt Road are
developed with non-residential uses including Horace Mann Elementary School.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
residents. All property owners located within 200-feet of the site along with the
Community Outreach Neighborhood Association were notified of the public
hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and will be required
prior to any land clearing or grading activities at the site. Other than
residential subdivisions, site grading and drainage plans must be submitted
and approved prior to the start of construction.
2. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
3. Easements are required for all stormwater drainage areas.
4. A special Grading Permit for Flood Hazard Areas will be required per Section
8-283 prior to construction.
5. The new addition is located within the 100 year floodplain. The addition to the
structure is required to be constructed to a minimum finish floor elevation of
257.75 feet or higher is required and shown on grading plans.
14
April 3, 2014
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-1076-C
6. Since the survey has been provided to staff, Roosevelt Road is classified on
the Master Street Plan as a minor arterial. A dedication of right-of-way
45 feet from centerline will be required.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main relocation required prior to construction of proposed
warehouse. Contact Little Rock Wastewater Utility for additional information.
Entergy: There do not appear to be any Entergy facilities in conflict with this
project. The developer/builder should contact Entergy well in advance if a
service upgrade is required.
Center -Point Ener : No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
3. Contact Central Arkansas Water if additional fire protection or metered water
service is required.
4. Contact Central Arkansas Water regarding the size and location of the water
meter.
5. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
6. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's
expense.
7. Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use.
Central Arkansas Water requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
3
April 3, 2014
SUBDIVISION
ITEM NO.: 3(Cont.)FILE NO.: S-1076-C
Tester licensed by the State of Arkansas and approved by Central Arkansas
Water. The test results must be sent to Central Arkansas Water's Cross
Connection Section within ten days of installation and annually thereafter.
Contact the Cross Connection Section at 377-1226 if you would like to
discuss backflow prevention requirements for this project.
8. The facilities on -site will be private. When meters are planned off private
lines. Private facilities shall be installed to Central Arkansas Water's material
and construction specifications and installation will be inspected by an
engineer, licensed to practice in the State of Arkansas. Execution of
Customer Owned Line agreement is required.
Fire Department: Place fire hydrant(s) per code. Maintain access. Contact the
Little Rock Fire Department for additional information.
County Planning: No comment.
CATA: Site served by the #6 Granite Mountain and #19 Hensley Express.
Parks and Recreation: No comment received.
F. ISSUESITECHNICAUDESIGN:
Planning Division: No comment.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. Interior landscape areas shall comprise a minimum of eight (8) percent of any
vehicular use area containing twelve (12) or more parking spaces.
3. An automatic irrigation system to water landscaped areas will be required.
4. Prior to the issuance of a building permit, it will be necessary to provide an
approved landscape plan stamped with the seal of a registered landscape
architect.
5. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
2
April 3, 2014
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: S-1076-C
G. SUBDIVISION COMMITTEE COMMENT: (March 12, 2014)
Mr. Thomas Pownall was present representing the owner. Staff stated there
were few outstanding technical issues associated with the request. Staff
requested Mr. Pownall provide the building coverage of the existing and
proposed addition, the floor area of the principal and accessory structures and
the number of existing and proposed parking spaces.
Public Works comments were addressed. Staff stated the City's stormwater
detention ordinance would apply to the development of the site. Staff stated
easements would be required for all stormwater drainage areas. Staff stated the
new addition was located within the 100 year floodplain. The applicant is
proposing to place the finished floor elevation below the minimum floor elevation
of 257.75-feet. Staff noted an application to the Zoning Board of Adjustment was
required to allow the variance.
Staff noted the comments from the various other agencies. There were no more
issues for discussion. The Committee then forwarded the item to the full
Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing a number of the
issues raised at the March 12, 2014, Subdivision Committee meeting. The
applicant has indicated the building coverage of the existing and proposed
addition, the floor area of the principal and accessory structures and the number
of existing and proposed parking spaces. The applicant is proposing a payment
in -lieu of construction of the stormwater detention. Staff is supportive of the
payment in -lieu of construction of the stormwater detention.
The property is currently zoned 1-2, Light Industrial District. The request is for
approval of a site plan per Section 31-13 of the Little Rock Code to allow the
construction of multiple buildings on a single site. There are two (2) existing
buildings on the site containing 189,514 square feet of gross floor area. The new
addition is proposed containing 118,000 square feet of gross floor area. The lot
coverage of the existing building is 6.08 percent. The new addition will not
significantly increase the percentage of lot coverage for the site.
There are 190 existing parking spaces on the site and an additional 54 parking
spaces are proposed with the new construction. Parking for a warehouse and
storage facility is based on five (5) spaces plus one (1) space per two thousand
5
April 3, 2014
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: S-1076-
square feet of gross floor area up to fifty thousand square feet; thence, in
addition to the above requirement, one space per ten thousand square feet of
floor area above fifty thousand square feet or potion thereof. 55 parking spaces
would typically be required.
The maximum building height proposed is 45-feet. The applicant has indicated
no new signage is proposed with the proposed addition. According to the
applicant, all signage will comply with the typical standards for industrially zoned
property or a maximum of 30-feet in height and 72 square feet in area.
The proposed site plan appears to fully comply with the typical development
standards established by the Subdivision Ordinance. The only outstanding issue
is the applicant is proposing to place the finished floor elevation below the
minimum floor elevation of 257.75-feet. Per Chapter 13 of City Code, the
proposed top of the finished floor should elevated to one (1) foot or more above
the base flood elevation of 256.75-feet. A variance must be obtained from City
Code for the proposed floor elevation. The applicant must seek a variance from
the Zoning Board of Adjustment to allow the finished floor to be placed at this
elevation.
STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of a fee in -lieu of construction of the on -site
stormwater detention.
The applicant must seek approval from the Zoning Board of Adjustment to allow
the finished floor as proposed.
PLANNING COMMISSION ACTION: (APRIL 3, 2014)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of a fee in -lieu
of construction of the on -site stormwater detention. Staff stated the applicant was to
seek approval from the Little Rock Board of Directors and not the Little Rock Zoning
Board of Adjustment to allow the finished floor as proposed.
0
April 3, 2014
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-1076-C
There was no further discussion of the item. The Chair entertained a motion for
approval of the item as presented by staff. The motion carried by a vote of 11 ayes,
0 noes and 0 absent.
7