HomeMy WebLinkAboutS-1065-C Staff AnalysisMarch 11, 2004
ITEM NO.: 14 FILE NO.: S-1065-C
NAME: Chenonceau Commercial Lots 1 and 2 Subdivision Site Plan Review
LOCATION: On the Southeast corner of Cantrell Road and Chenonceau Boulevard
DEVELOPER:
Flake Family Partnership
225 West Capitol Avenue
Little Rock, AR 72201
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.22 acres
CURRENT ZONING:
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 2 FT. NEW STREET: 0
C-3, General Commercial District
19 - Chenal
42.11
VARIAN C ESNVAIVE RS REQUESTED: None requested.
BACKGROUND:
A two lot preliminary plat was approved by the Little Rock Planning Commission at their
May 16, 1995 Public Hearing. The proposal included a commercial and office
subdivision on a 16.66-acre tract. The site has frontages on both Cantrell Road and
Chenonceau Boulevard. One interior cul-de-sac street, approximately 500 feet in length
was proposed within the subdivision. Lots ranged in size from 0.8 acres to 2.14 acres,
with the average lot size being 1.44 acres. The Final Plat for Lot 1 was executed on
January 29, 1996. The Final Plat for Lot 2 was executed on December 19, 2003.
A. PROPOSAUREQUEST:
The applicant is proposing the construction of two buildings on this site which
was previously final platted as two lots. The applicant is proposing the
construction of a 2,700 square foot bank building located on the corner of
Cantrell Road and Chenonceau Boulevard and the construction of a retail
building containing 12,000 square feet. The retail building is situated where it
March 11, 2004
SUBDIVISION
ITEM NO. - 14 Cont.)_ FILE NO.: S-1065-C
cross the lot line requiring the applicant to seek a multiple building site plan
review.
The proposed site plan indicates two sign locations, one on Chenonceau
Boulevard, the second is proposed at the intersection of Cantrell Road and
Chenonceau Boulevard. The applicant has indicated building setbacks along
Cantrell Road conforming to required setback of the Highway 10 Design Overlay
District requirements.
The applicant has indicated 120 parking spaces for the proposed development.
B. EXISTING CONDITIONS:
The site is undeveloped and is heavily wooded and contained in a large area
currently zoned for non-residential uses. The northern two-thirds of the overall
area is zoned C-3; the southern one-third of the area is zoned 0-2. The land to
the east, south and southwest is all zoned R-2. Across Chenonceau Boulevard
to the west is a MF-18 zoned tract currently under development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
residents who could be identified located within 300-feet of the site, the Aberdeen
Court Property Owners Association, the Bayonne Place Property Owners
Association, the Margeaux Property Owners Association, the Maywood Manor
Neighborhood Association and the DuQuesne Place Property Owners
Association and all owners of property located within 200-feet of the site were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Chenonceau is classified on the Master Street Plan as a minor arterial. A
minimum dedication of right-of-way 45 feet from centerline plus 10 foot
additional for a right turn lane will be required.
2. Highway 10 at Chenonceau has been approved for a traffic signal when
warrants are met. The proposed development located at a signalized
intersection will require an additional left turn and right turn lane on
Cenonceau. Provide a plan showing additional lanes, right-of-way and 5-foot
sidewalk.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
grading, and drainage plans will need to be submitted and approved prior to
P%
March 11, 2004
SUBDIVISION
ITEM NO.: 14 (Cont.
the start of construction.
FILE NO.: S-1065-C
4. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: Approved as submitted.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. The Little Rock Fire Department
needs to evaluate this site to determine whether additional public and/or private fire
hydrant(s) will be required. If additional fire hydrant(s) are required, they will be
installed at the Developer's expense. Due to the nature of this facility, installation of
an approved reduced pressure zone backflow preventer assembly (RPZA) is
required on the domestic water service. This assembly must be installed prior to the
first point of use. Central Arkansas Water (CAW) requires that upon installation of
the RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by CAW. The test
results must be sent to CAW's Cross Connection Section within ten days of
installation and annually thereafter. Contact Carroll Keatts at 992-2431 if you would
like to discuss backflow prevention requirements for this project. This development
will have minor impact on the existing water distribution system. Proposed water
facilities will be sized to provide adequate pressure and fire protection. If there are
facilities that need to be adjusted and/or relocated, contact Central Arkansas Water.
That work would be done at the expense of the developer. Contact Central
Arkansas Water at 992-2438 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: Areas set aside for buffer and landscaping appear to meet with the
landscape ordinance and the Highway 10 Design Overlay District standards.
3
March 11, 2004
SUBDIVISION
ITEM NO.: 14 (Cont.) FILE NO.: S-1065-C
Screening is required due to the residential use along the eastern perimeter of
the site. This screening to be a six (6) foot high opaque screen, either a wooden
fence with its face side directed outward, a wall, or dense evergreen plantings.
An automatic irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
The City Beautiful Commission recommends preserving as many existing trees
as feasible on this tree -covered site. Credit toward fulfilling Landscape
Ordinance requirements can be given when properly preserving trees of six (6)
inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT:
(February 19, 2004)
Mr. Joe White was present representing the applicant. Staff stated the request
was a multiple building site plan review since one of the buildings was proposed
to cross an existing lot line. Staff requested the applicant provide additional
information concerning the proposed development. Staff requested the applicant
indicate dumpster screening, the proposed days and hours of operation and
details of any proposed signage. Staff also stated the proposed side yard
landscaping strip along the eastern property line did not meet the required
Highway - 10 Design Overlay District Standards. Staff stated the required
landscaping strip along the eastern property line should be an average of twenty-
five feet. Staff suggested the applicant reduced the area set aside along the
western perimeter (adjacent to Chenonceau Boulevard) to increase the area
along the eastern perimeter. Staff stated the platted utility easement would have
to be abandoned through Board of Directors action.
Public Works comments were addressed. Staff stated Chenonceau was
scheduled for signalization, which would require an additional turn lane. Staff
requested the applicant provide right-of-way for the additional lanes. Mr. White
questioned if the right-of-way could come from the existing median. Staff stated
narrowing the median was an option. Staff stated the proposed driveway
location along Cantrell Road was acceptable.
Landscaping comments were addressed. Staff noted the areas set aside for
buffer and landscaping appeared to meet the minimum landscape ordinance and
the Highway 10 Design Overlay District requirements. Staff stated screening
would be required along the eastern property line.
►11
March 11, 2004
SUBDIVISION
ITEM NO.: 14 Cont. FILE NO.: S-1065-C
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the February 19, 2004 Subdivision Committee meeting. The applicant
has indicated an increased side yard buffer adjacent to the residentially zoned
property to the east. The applicant has indicated a twenty-five average buffer,
consistent with the Highway 10 Design Overlay District requirements. The
applicant has indicated screening along the eastern property line sufficient to
provide year around screening to the residentially zoned properties located to the
east. Staff is supportive of the proposed landscaping and buffering.
The applicant has indicated a single -ground mounted monument sign adjacent to
Cantrell Road, consistent with signage allowed by the Highway 10 Design
Overlay District or a maximum of ten feet height and seventy-two square feet in
area. The applicant has indicated a second sign located on Chenonceau
Boulevard also a maximum of ten feet in height and seventy-two square feet in
area. Staff is supportive of the proposed signage.
The applicant has indicted two dumpster locations on the proposed site plan.
The first is located near the northern end of the retail building. The applicant has
indicated the days and hours of operation to be from 7:00 am to 9:00 pm seven
days per week. Staff is supportive of the proposed dumpster locations and the
days and hours of operation. Staff would however, recommend the dumpsters
be serviced during daylight hours to minimize the impact on the single-family
homes located to the east.
A 25-foot utility and access easement was final platted as a part Lots 1 and 2 of
the Chenonceau Commercial Subdivision. The applicant is requested the
easement be abandoned as a part of the site plan review process. The
applicant will follow through with abandonment to the Board of Directors if
recommended for approval by the Commission. Staff is supportive of the
request. The applicant has indicated cross access will be provided for both
access and parking.
The applicant has not indicated if the additional turn lane will be added to
Chenonceau Boulevard. Public Works has indicated the Chenonceau Boulevard
and Cantrell Road intersection is scheduled for signalization when warrants are
met. Staff feels the addition of a left and right turn lane at the intersection is
critical to facilitate traffic movement in the area. Staff recommends the additional
turn lanes be added to Chenonceau Boulevard.
5
41
March 11, 2004
SUBDIVISION
ITEM NO.: 14
FILE NO.: S-1055-C
To Staffs knowledge there are no outstanding issues associated with the
proposed request. Staff feels the development should have minimal to no
adverse impact on adjoining properties if the required infrastructure is put in
place to facilitate traffic and buffers are put as proposed to protect the adjoining
properties.
STAFF RECOMMENDATION -
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
Staff recommends the right and left turn lanes be added to Chenonceau
Boulevard to enhance traffic movement in the area.
Staff recommends the dumpsters service be limited to daylight hours.
Staff recommends approval of the requested abandonment of the access and
utility easement located within the proposed site.
PLANNING COMMISSION ACTION: (MARCH 11, 2004)
Mr. Joe White was present representing the request. There were no registered
objectors present. Staff stated the applicant had submitted a letter dated March 8, 2004
requesting the item be deferred to the April 22, 2004 Planning Commission Public
Hearing. Staff stated the deferral request would require a waiver of the By-laws related
to the late deferral request. Staff stated the applicant requested additional time to work
with an adjoining property owner. Staff stated an application would be filed on
March 15, 2004 related to the adjoining site and would be heard by the Commission at
their April 22, 2004 Public Hearing. Staff stated they were supportive of the By -Law
Waiver and the deferral request.
There was no further discussion of the item. The item was placed on the Consent
Agenda and approved as presented by staff by a vote of 9 ayes, 0 noes and 2 absent.
C
April 22, 2004
ITEM NO.: C FILE NO.: S-1065-C
NAME: Chenonceau Commercial Lots 1 and 2 Subdivision Site Plan Review
LOCATION: On the Southeast corner of Cantrell Road and Chenonceau Boulevard
DEVELOPER:
Flake Family Partnership
225 West Capitol Avenue
Little Rock, AR 72201
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 3.22 acres
CURRENT ZONING
PLANNING DISTRICT:
CENSUS TRACT:
NUMBER OF LOTS: 2 FT. NEW STREET: 0
C-3, General Commercial District
19 - Chenal
42.11
VARIANCESMAIVERS REQUESTED: None requested.
BACKGROUND:
A two lot preliminary plat was approved by the Little Rock Planning Commission at their
May 16, 1995 Public Hearing. The proposal included a commercial and office
subdivision on a 16.66-acre tract. The site has frontages on both Cantrell Road and
Chenonceau Boulevard. One interior cul-de-sac street, approximately 500 feet in length
was proposed within the subdivision. Lots ranged in size from 0.8 acres to 2.14 acres,
with the average lot size being 1.44 acres. The Final Plat for Lot 1 was executed on
January 29, 1996. The Final Plat for Lot 2 was executed on December 19, 2003.
A. PROPOSAUREQUEST:
The applicant is proposing the construction of two buildings on this site which
was previously final platted as two lots. The applicant is proposing the
construction of a 2,700 square foot bank building located on the corner of
Cantrell Road and Chenonceau Boulevard and the construction of a retail
April 22, 2004
SUBDIVISION
ITEM NO.: C
FILE NO.: S-1065-C
building containing 12,000 square feet. The retail building is situated where it
cross the lot line requiring the applicant to seek a multiple building site plan
review.
The proposed site plan indicates two sign locations, one on Chenonceau
Boulevard, the second is proposed at the intersection of Cantrell Road and
Chenonceau Boulevard. The applicant has indicated building setbacks along
Cantrell Road conforming to required setback of the Highway 10 Design Overlay
District requirements.
The applicant has indicated 120 parking spaces for the proposed development.
B. EXISTING CONDITIONS:
The site is undeveloped and is heavily wooded and contained in a large area
currently zoned for non-residential uses. The northern two-thirds of the overall
area is zoned C-3; the southern one-third of the area is zoned 0-2. The land to
the east, south and southwest is all zoned R-2. Across Chenonceau Boulevard
to the west is a MF-18 zoned tract currently under development.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comment from area residents. All
residents who could be identified located within 300-feet of the site, the Aberdeen
Court Property Owners Association, the Bayonne Place Property Owners
Association, the Margeaux Property Owners Association, the Maywood Manor
Neighborhood Association and the DuQuesne Place Property Owners
Association and all owners of property located within 200-feet of the site were
notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Chenonceau is classified on the Master Street Plan as a minor arterial. A
minimum dedication of right-of-way 45 feet from centerline plus 10 foot
additional for a right turn lane will be required.
2. Highway 10 at Chenonceau has been approved for a traffic signal when
warrants are met. The proposed development located at a signalized
intersection will require an additional left turn and right turn lane on
Cenonceau. Provide a plan showing additional lanes, right-of-way and 5-foot
sidewalk.
3. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Site
2
April 22, 2004
SUBDIVISION
ITEM NO.: C (Cont.
FILE NO.: S-1
grading, and drainage plans will need to be submitted and approved prior to
the start of construction.
4. Storm water detention ordinance applies to this property. Show the proposed
location for storm water detention facilities on the plan.
E. UTILITIES AND FIRE DEPARTMENTICOUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Enter : Approved as submitted.
Center -Point Energy: Approved as submitted.
SBC: Approved as submitted.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the
time of request for water service must be met. The Little Rock Fire Department
needs to evaluate this site to determine whether additional public and/or private fire
hydrant(s) will be required. If additional fire hydrant(s) are required, they will be
installed at the Developer's expense. Due to the nature of this facility, installation of
an approved reduced pressure zone backflow preventer assembly (RPZA) is
required on the domestic water service. This assembly must be installed prior to the
first point of use. Central Arkansas Water (CAW) requires that upon installation of
the RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by CAW. The test
results must be sent to CAW's Cross Connection Section within ten days of
installation and annually thereafter. Contact Carroll Keatts at 992-2431 if you would
like to discuss backflow prevention requirements for this project. This development
will have minor impact on the existing water distribution system. Proposed water
facilities will be sized to provide adequate pressure and fire protection. If there are
facilities that need to be adjusted and/or relocated, contact Central Arkansas Water.
That work would be done at the expense of the developer. Contact Central
Arkansas Water at 992-2438 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
F. ISSUESlTECHNICAUDESIGN:
Planning Division: No comment.
K
April 22, 2004
SUBDIVISION
ITEM NO.: C(Cont.)_FILE NO.: S-1065-C
Landscape: Areas set aside for buffer and landscaping appear to meet with the
landscape ordinance and the Highway 10 Design Overlay District standards.
Screening is required due to the residential use along the eastern perimeter of
the site. This screening to be a six (6) foot high opaque screen, either a wooden
fence with its face side directed outward, a wall, or dense evergreen plantings.
An automatic irrigation system to water landscaped areas will be required.
Prior to a building permit being issued, it will be necessary to provide an
approved landscape plan stamped with the seal of a Registered Landscape
Architect.
The City Beautiful Commission recommends preserving as many existing trees
as feasible on this tree -covered site. Credit toward fulfilling Landscape
Ordinance requirements can be given when properly preserving trees of six (6)
inch caliper or larger.
G. SUBDIVISION COMMITTEE COMMENT: (February 19, 2004)
Mr. Joe White was present representing the applicant. Staff stated the request
was a multiple building site plan review since one of the buildings was proposed
to cross an existing lot line. Staff requested the applicant provide additional
information concerning the proposed development. Staff requested the applicant
indicate dumpster screening, the proposed days and hours of operation and
details of any proposed signage. Staff also stated the proposed side yard
landscaping strip along the eastern property line did not meet the required
Highway 10 Design Overlay District Standards. Staff stated the required
landscaping strip along the eastern property line should be an average of twenty-
five feet. Staff suggested the applicant reduced the area set aside along the
western perimeter (adjacent to Chenonceau Boulevard) to increase the area
along the eastern perimeter. Staff stated the platted utility easement would have
to be abandoned through Board of Directors action.
Public Works comments were addressed. Staff stated Chenonceau was
scheduled for signalization, which would require an additional turn lane. Staff
requested the applicant provide right-of-way for the additional lanes. Mr. White
questioned if the right-of-way could come from the existing median. Staff stated
narrowing the median was an option. Staff stated the proposed driveway
location along Cantrell Road was acceptable.
CI
April 22, 2004
SUBDIVISION
ITEM NO.: C (Cont.)_ FILE NO.: S-1065-C
Landscaping comments were addressed. Staff noted the areas set aside for
buffer and landscaping appeared to meet the minimum landscape ordinance and
the Highway 10 Design Overlay District requirements. Staff stated screening
would be required along the eastern property line.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing most of the issues
raised at the February 19, 2004 Subdivision Committee meeting. The applicant
has indicated an increased side yard buffer adjacent to the residentially zoned
property to the east. The applicant has indicated a twenty-five average buffer,
consistent with the Highway 10 Design Overlay District requirements. The
applicant has indicated screening along the eastern property line sufficient to
provide year around screening to the residentially zoned properties located to the
east. Staff is supportive of the proposed landscaping and buffering.
The applicant has indicated a single -ground mounted monument sign adjacent to
Cantrell Road, consistent with signage allowed by the Highway 10 Design
Overlay District or a maximum of ten feet height and seventy-two square feet in
area. The applicant has indicated a second sign located on Chenonceau
Boulevard also a maximum of ten feet in height and seventy-two square feet in
area. Staff is supportive of the proposed signage.
The applicant has indicted two dumpster locations on the proposed site plan.
The first is located near the northern end of the retail building. The applicant has
indicated the days and hours of operation to be from 7:00 am to 9:00 pm seven
days per week. Staff is supportive of the proposed dumpster locations and the
days and hours of operation. Staff would however, recommend the dumpsters
be serviced during daylight hours to minimize the impact on the single-family
homes located to the east.
A 25-foot utility and access easement was final platted as a part Lots 1 and 2 of
the Chenonceau Commercial Subdivision. The applicant is requested the
easement be abandoned as a part of the site plan review process. The
applicant will follow through with abandonment to the Board of Directors if
recommended for approval by the Commission. Staff is supportive of the
request. The applicant has indicated cross access will be provided for both
access and parking.
The applicant has not indicated if the additional turn lane will be added to
Chenonceau Boulevard. Public Works has indicated the Chenonceau Boulevard
5
April 22, 2004
SUBDIVISION
ITEM NO.. C (Cont.) FILE NO.: S-1065-C
and Cantrell Road intersection is scheduled for signalization when warrants are
met. Staff feels the addition of a left and right turn lane at the intersection is
critical to facilitate traffic movement in the area. Staff recommends the additional
turn lanes be added to Chenonceau Boulevard.
To Staffs knowledge there are no outstanding issues associated with the
proposed request. Staff feels the development should have minimal to no
adverse impact on adjoining properties if the required infrastructure is put in
place to facilitate traffic and buffers are put as proposed to protect the adjoining
properties.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
Staff recommends the right and left turn lanes be added to Chenonceau
Boulevard to enhance traffic movement in the area.
Staff recommends the dumpsters service be limited to daylight hours.
Staff recommends approval of the requested abandonment of the access and
utility easement located within the proposed site.
PLANNING COMMISSION ACTION: (MARCH 11, 2004)
Mr. Joe White was present representing the request. There were no registered
objectors present. Staff stated the applicant had submitted a letter dated March 8, 2004
requesting the item be deferred to the April 22, 2004 Planning Commission Public
Hearing. Staff stated the deferral request would require a waiver of the By-laws related
to the late deferral request. Staff stated the applicant requested additional time to work
with an adjoining property owner. Staff stated an application would be filed on
March 15, 2004 related to the adjoining site and would be heard by the Commission at
their April 22, 2004 Public Hearing. Staff stated they were supportive of the By -Law
Waiver and the deferral request.
There was no further discussion of the item. The item was placed on the Consent
Agenda and approved as presented by staff by a vote of 9 ayes, 0 noes and 2 absent.
STAFF UPDATE:
The applicant has revised the site plan for driveway placement along the shared
property lines of the existing site and the site being considered for a planned office
April 22, 2004
SUBDIVISION
ITEM NO.: C (Cont.) FILE NO.: 5-1065-C
development (Item #21.1 — File No. Z-7605). Staff is supportive of this request. As with
the previous application the applicant is requesting a waiver of street improvements to
Chennonceau Boulevard. All previous comments and recommendation from the
March 11, 2004, Public Hearing continue to apply to this request.
PLANNING COMMISSION ACTION:
(APRIL 22, 2004)
Mr. Joe White was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs, D, E and F of
the above report.
There was no further discussion of the item. The Chair placed the item on the consent
agenda for approval. The motion was approved by a vote of 10 ayes, 0 noes and
1 absent.
7
ITEM NO.: 14
FILE NO.: S-1065-C
NAME: Chenonceau Commercial Lots 1 and 2 Subdivision Site Plan Review
LOCATION: On the southeast corner of Cantrell Road and Chenonceau Boulevard
Planninq Staff Comments:
1. Provide notification of property owners located within 200-feet of the site, complete with the
certified abstract list, notice form with affidavit executed and proof of mailing.
2. Provide details of any proposed signage (height/area/location).
3. Provide details of any proposed fencing (height/material/location).
4. Provide the proposed days and hours of operation in the general notes section of the
proposed site plan.
5. Provide the dimensions of all building setbacks from property lines.
6. The development will require a replat of the lots into a single lot.
7. Provide details of the dumpster screening.
8. The proposed side yard setbacks do not comply with the Highway 10 Design Overlay
District. Redesign to meet the 25-foot side yard setback or resubmit as a Planned
Commercial Development.
9. The access and utility easement must be abandoned through the proper petition and Board
of Directors action.
Variance/Waivers: A variance from the minimum driveway spacing requirement for the
driveway on Cantrell Road.
Public Works: &A ,
1. Chenonceauis classified on the Master Street Plan as a minor arterial. A minimum
dedication of right-of-way 45 feet from centerline plus 10 foot additional for a right turn lane
will be required.
2. Highway 10 at Chenonceau has been approved for a traffic signal when warrants are met.
The proposed development located at a signalized intersection will require an additional left
turn and right turn lane on Cenonceau. Provide a plan showing additional lanes, right-of-
way and 5-foot sidewalk.
3. A grading permit in accordance with section 29-186 (c) & (d) will be required prior to any
land clearing or grading activities at the site. Site grading, and drainage plans will need to
be submitted and approved prior to the start of construction.
4. Storm water detention ordinance applies to this property. Show the proposed location for
storm water detention facilities on the plan.
Utilities and Fire Department/County Planning: k
Wastewater; Sewer available, not adversely affected
Enter9Y: Approved roved as submitted.
NNW
Center -Pain# Energy: Approved as submitted.
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time of
request for water service must be met. The Little Rock Fire Department needs to evaluate this
site to determine whether additional public and/or private fire hydrant(s) will be required. If
additional fire hydrant(s) are required, they will be installed at the Developer's expense. Due to
the nature of this facility, installation of an approved reduced pressure zone backflow preventer
assembly (RPZA) is required on the domestic water service. This assembly must be installed
prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of
the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester
licensed by the State of Arkansas and approved by CAW. The test results must be sent to
CAW s Cross Connection Section within ten days of installation and annually thereafter. Contact
Carroll Keatts at 992-2431 if you would like to discuss backflow prevention requirements for this
project. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire protection. If there
are facilities that need to be adjusted and/or relocated, contact Central Arkansas Water. That
work would be done at the expense of the developer. Contact Central Arkansas Water at 992-
2438 for additional information.
Fire Department: Approved as submitted.
County Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
Landscape: Areas set aside for buffer and landscaping appear to meet with the
landscape ordinance and the Highway 10 district standards.
Screening is required due to the residential use along the eastern perimeter of the site. This
screening to be a six (6) foot high opaque screen, either a wooden fence with its face side
directed outward, a wall, or dense evergreen plantings.
An automatic irrigation system to water landscaped areas will be required
Prior to a building permit being issued, it will be necessary to provide an approved landscape
plan stamped with the seal of a Registered Landscape Architect.
The City Beautiful Commission recommends preserving as many existing trees as feasible on
this tree -covered site. Credit toward fulfilling Landscape Ordinance requirements can be given
when properly preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, February 25, 2004.