ITEM N 4 FILE NO.: -10 5
NAME: CHENONCEAU COMMERCIAL PARK -- PRELIMINARY PLAT
LOCATION: At the southeast corner of Cantrell Rd. and Chenonceau
Blvd.
DEVELOPER
ENGINEER:
Jack McCray Joe White
DELTIC FARM & TIMBER CO., INC. WHITE-DATERS & ASSOCIATES, INC.
#7 Chenal Club Circle 401 S. Victory St.
Little Rock, AR 72211 Little Rock, AR 72201
821-5555 374-1666
AREA: 16.66 ACRES NUMBER OF LOTS: 11 FT_ NEW STREET: 500
ZONING• 0-3 & C-3
PLANNING DISTRICT: 19
CENSUS TRACT: 42.06
VARIANCES REOUESTED: None
STATEMENT OF PROPOSAL:
PROPOSED USES: Office & Commercial
The applicant proposes a commercial and office subdivision on a
16.66 acre tract. The site is located with frontages on both
Cantrell Rd. and Chenonceau Blvd., so no boundary street
improvements are needed or to be provided. One interior cul-de-
sac street, approximately 500 feet in length, is proposed. Lots
range in size of from 0.8 acre to 2.14 acres, with the average
lot size being 1.44 acres. No variances are proposed.
A. PROPOSAL RE ❑EST:
Review and approval by the Planning Commission is requested
for a preliminary plat.
B. EXISTING CONDITIONS:
The site is undeveloped and is heavily wooded.
The northern two-thirds of the site is zoned C-3; the
southern one-third is zoned 0-2. The land to the east,
south, and southwest is all zoned R-2. Across Chenonceau
Blvd. to the west is an MF-18 zoned tract.
May 16, 1995
SUBDIVISION
ITEM NG • 4 (Cont.) FILE NO.; S-1065
C. ENGINEERING/UTILITY COMMENT
The Public Works staff comments that: 1) the preliminary
plat has some technical deficiencies which need to be
addressed; 2) access to Lot 5 should be taken from
Chenonceau Court, and common drives should be provided for
Lots 1-2, 3-4, 5-6, with access to Lot 10 being provided at
the southeast corner of the lot; 3) street plans must be
provided and sidewalks will be required on both sides; 4) a
stormwater detention analysis and easement for the outfall
drainage onto adjacent property must be provided; and, 5)
provide erosion control plan and get City and State permits
prior to any site work.
Water Works comments that a water main extension will be
required -in order -,to -provide service to some lots.
Wastewater comments that sewer main extensions, with
easements, will be required.
Arkansas Power and Light Co. will require an easement along
the north and west property lines, including along all sides
of the cul-de-sac.
Southwestern Bell Telephone Co. approved the submittal
without comment.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
The Fire Department approved the submittal without comment.
The Parks and Recreation Department comments that the use of
a bikeway along Chenonceau Blvd. to link Chenal development
to the future bikeway along the Little Maumelle and Arkansas
Rivers is encouraged.
D. ISSUES/LEGAL/TECHNICAL/DESIGN:
The Neighborhoods and Planning staff comments that:
1) Sec. 31-87 requires that the name and address of
the owner of record, with the source of title,
giving deed record book and page number or
instrument number, be shown. These are not
indicated.
2) Sec. 31-87 requires that the average and minimum
lot sizes be reported; they are not.
0►
May 16, 1995
f :.
ITEM No.: 4 (Cont.) FILE NO.: 5-1065
3) Sec. 31-87 requires that any existing and the
proposed covenants and resurrections be indicated.
This is not available.
4) Sec. 31-87 requires that the source of water
supply and the means of wastewater be indicated.
This is not shown.
5) Sec. 31-89 requires that contours be shown, and be
at 2' intervals. Contours are shown, but there is
no indication of their interval or what elevation
they represent.
6) Sec. 31-89 requires that "natural features"
(drainage channels, bodies of water, wooded areas,
etc.) and "cultural features" (existing and plated
streets, bridges,_ culverts, utility lines, _
pipelines, power transmission lines, easements,
park areas, structures, section lines, etc.)
within and immediately surrounding the proposed
subdivision be shown. This section also requires
that on all watercourses entering the tract, the
drainage area above the point of entry shall be
noted. These requirements have not met.
7) Sec. 31-89 requires a preliminary storm drainage
plan be provided. This has not been submitted.
8) Sec. 31-89 requires the names of recorded
subdivisions abutting the proposed subdivision,
with plat book and page number or instrument umber
be shown, and for commercial subdivision the
owners of all land contiguous to the proposed
subdivision be indicated. "Abutting" and
"contiguous" include property across streets.
Ownerships of platted lots to the south need to be
shown. ownership and/or plat information to the
north needs to be shown.
9) Sec. 31-89 requires that adequate physical
descriptions of all monuments is to be shown,
indicating the size, type of materials, and
construction of monuments. Monuments are not
designated.
10) Sec. 31-89 requires that the zoning
classifications within the plat and of abutting
areas are to be show. This has not been shown.
11) Sec. 31-89 requires that the certification be
executed indicating that the survey has been filed
3
May 16, 1995
SUBDIVISION
ITEM NO. • 4 (CQnt ) FILE NO.: s-1.0.6_5
with the office of the State Surveyor. This has
not been done.
12) Sec. 31-89 requires that a phasing plan, if
development is to be phased, be indicated. Is the
entire development to be accomplished in one
phase?
13) Sec. 31-91 requires the certificates of
preliminary engineering and surveying accuracy be
executed.
14) Sec. 31-93 requires a preliminary Bill of
Assurance be submitted. This has not been done.
15) Sec. 31-89 requires that the proposed design for
streets, and showing sidewalks are to be
indicated. Sec. 31-209 and 31-282 require
sidewalks on both sides of commercial streets.
Sidewalks will be required along Chenonceau Blvd.
and Chenonceau Ct.
E. ANALYSIS:
The deficiencies noted above are easily provided by the
project engineer, and can be added prior to staff approving
the file copy of the preliminary plat.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the preliminary plat, subject
to the applicant's engineer completing the submittal
requirements.
SUBDIVISION COMMITTEE COMMENT: (APRIL 27, 1995)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Staff presented the proposed
preliminary plat to the Committee, and the Committee reviewed
with staff and Mr. White the comments contained in the discussion
outline. The Public works staff discussed with Mr. White its
comments regarding stormwater detention and the requirement that
an easement be provided for the outfall from stormwater from the
site. Mr. White responded that the matter would be investigated,
and that further consultation would be needed. Mr. White related
that the remaining issues raised by staff would be addressed.
The Committee forwarded the proposed plat to the full Commission
for the public hearing.
4
May 16, 1995
SVBLIVIs1
ITEM NO.: 4 KCont. FILE NO.: S-1065
PLANNING COMMISSION A Tom:
(MAY 16, 1995)
Staff reported that all issues had been resolved. Staff
recommended approval of the preliminary plat, and the item was
included on the Consent Agenda for approval. The preliminary plat
was approved with the approval of the Consent Agenda with the
vote of 11 ayes, 0 nays, 0 abstentions, and 0 absent.
5