Loading...
HomeMy WebLinkAboutS-1056-A Staff AnalysisMay 16, 1995 ITEM NO,: 2a_ _ FILE NO.: 5-1056-A NAME: CWC SUBDIVISION -- LOT 2 RE -PLAT LOCATION: On the south side of the I-30 frontage road, north of Baseline Road, approximately 750 feet east of the I-30 frontage road and Baseline Road intersection. DEVELOPER: ENGINEER: Mike Coulson Robert Brown COULSON, WHITE, COULSON DEVELOPMENT CONSULTANTS, INC. AN ARKANSAS GENERAL PARTNERSHIP 10809 Executive Center Dr., 1434-38 Pike Ave. Suite 210 North Little Rock, AR 72114 Little Rock, AR 72205 376-4222 221-7880 AREA: 2.83 ACRES ZONING• C-4 PLANNING DISTRICT: 15 CENSUS TRACT: 41.03 NUMBER OF LOTS FT, NEW STREET VARIANCES REQUESTED: None BACKGROUND: PROPOSED USES: Commercial The proposed subdivision is a replat of Lot 2 of a 2-lot plat entitled the "CWC Subdivision". The tract was recently approved for a lot split by staff in order for the McDonalds restaurant to be constructed on Lot 1. STATEMENT OF PROPOSAL: The applicant proposes a four -lot re -plat of the 2.83 acre Lot 2 of the CWC Subdivision. The re -plat is to have frontages on both Baseline Rd. and on the I-30 access road, with two lots having frontage on each of_the streets. A common access easement is proposed to be located along the north -south interior lot lines, and a common drive approach from the public streets is to be provided at this access easement for a shared access to the lots. This access easement is also to provide access to the proposed fire hydrant which is to be located at the interior "four corners" of the subdivision. The applicant states that all required right-of-way was dedicated as part of a re -zoning action approved previously, and that no street improvements are required or proposed. No variances are proposed. May 16, 1995 . gUIDWA � ITEM NO.: 2a (Cont.) FILE NO.: S-1056-A A. PROPOSAL/REQUEST: Approval by the Planning Commission is requested for a re - plat. B . EX_ISTINCz CONDITIONS: The site is being cleared of buildings which formerly occupied the site. The site is zoned C-4, and is part of a recent rezoning to C-4 involving not only the subject site, but the Lot 1 area to the west. Property to the east is zoned I-2. To the south, for approximately the west two-thirds of the frontage along Baseline Rd., is C-3 property. The east one-third of the frontage along Baseline Rd. is R-2 property. An OS strip separates the two zoning districts. C. ENGINEERING/UTILITY COMMENTS: The Public Works staff comments that: 1) the plan must be submitted to AHTD for approval; 2) the required stormwater detention analysis must be provided; 3) common access must be provided to each roadway from adjacent parcels; 4) a grading permit is required before any construction; 5) the floodplain certification must be signed; and, 6) an analysis for the sizing of culverts crossing driveways must be provided. Water Works comments that, in addition to the normal connection fees, an acreage charge of $150/acre applies. The main to be tapped is out in Baseline Rd. Approval of AHTD will be required to tap this main. Access to the fire hydrant from all lots must be provided. Wastewater comments that sewer main extensions, with easements, will be required. Arkansas Power and Light Co. approved the submittal without comment. Southwestern Bell Telephone Co. noted that a 10, easement will be required along the west property line. Arkansas Louisiana Gas Co. approved the submittal without comment. The Fire Department did not furnish comments. 2 May 16, 1995 SUBDIVISION ITEM NO.: 2a (Cont.) FILE NO.: S-1056-A D . 15 SUES / LEGAL / TECHNICAL / DES IG: The Neighborhoods and Planning staff comments that Sec. 31- 287 requires that, where a commercial subdivision has in excess of 300, of frontage on an arterial street or major thoroughfare, provisions for internal circulation are to be required. Show the location of proposed ingress/egress easements at common lot lines. E. ANALYSIS• There are only minor deficiencies noted in the submittal information and preliminary plat. The plat substantially meets the Ordinance requirements. F. STAFF RECOMMENDATIONS: Staff recommends approval of the preliminary plat. SUBDIVISION COMMITTEE COMMENT: (APRIL 27, 1995) Mr. Mike Coulson, the applicant, and Mr. Robert Brown, with DCI, the project engineering firm, were present. Staff presented the proposed preliminary plat. Mr. Brown reviewed the discussion outline, and responded to the comments individually. The Public Works and Water Utilities comment regarding the need for a common access easement along the north -south interior lot lines was discussed, and Mr. Brown responded that this would be provided. The Public Works comment regarding designating a common drive approach to serve each of the lots facing the two public roadways was discussed. Mr. Brown responded that these would be provided. The Committee members reviewed with Mr. Brown the proposed plat and the comments contained in the discussion outline, and Mr. Brown indicated that all items contained in the discussion outline would be addressed. The Committee forwarded the plat to the Commission for the public hearing. PLANNING COMMISSION ACTION: (MAY 16, 1995) Staff reported that all issues had been resolved. Staff recommended approval of the preliminary plat. The item was included on the Consent Agenda for approval, and was approved with the approval of the Consent Agenda with the vote of 11 ayes, 0 nays, 0 abstentions, and 0 absent. K,