Loading...
HomeMy WebLinkAboutS-1054 Staff AnalysisApril 4, 1995 SVBDIVIOIQr� ITEM NO.: 11 (Cont;.) FILE NO.: S-1054 E. ANALYSIS: Other than the applicant needing to furnish a site plan which is fully dimensioned, there,Are no issues to be resolved. The site is a large tract, and the buildings have more than adequate separation from each other and from property lines. F. STAFF RECOMMENDATIONS: Staff recommends approval of the site plan. SUBDIVISION COMMITTEE COMMENT: (MARCH 16, 1995) Mr. Joe Stout was present to represent the applicant. Staff presented the proposal and reviewed with Mr. Stout the various comments contained in the discussion outline. The Committee members discussed the site plan with the applicant, and confirmed .with the applicant that all staff comments would be addressed. The Committee forwarded the site plan to the full Commission for the public hearing. PLANNING COMMISSION ACTION: (APRIL 4, 1995) The item was included on the Consent Agenda for approval, and was approved with the vote of 9 ayes, 0 nays, 0 abstentions, and 2 absent. 3 April 4, 1995 ITEM NQ.= 11 FILE NO.: S-1054 NAME: HANDLING SYSTEMS & CONVEYORS, INC. -- SITE PLAN REVIEW LOCATION: On the East Side of Otter Creek East Blvd., at 10909 Otter Creek East Blvd. DEVELOPER: Mark Akers HANDLING SYSTEMS AND CONVEYORS, INC. 10909 Otter Creek East Blvd. Mabelvale, AR 72103 455-5898 AREA: 2.29 ACRES NUMBER OF LOTS: 1 FT. NEW STREET: 0 ZQUIN I-2 PROPOSED USES: Industrial PLANNING DISTRICT: 16 CENSUS TRACT: 41.03 VARIANCES REQUESTED: None The applicant proposes the addition of a second building to its current office site. The proposed building is to have 12,000 square feet "under roof". Half the building is to be enclosed; the remainder of the roof is to form a canopy over a concrete slab area. The new building is to be constructed approximately 27 feet behind the existing office building. The internal .drive and parking area is to be extended to serve the new building, with new parking to be added to provide a total of 16 parking space, including handicap parking. Landscaping will be upgraded to meet the City requirements. No new drive access points from Otter Creek East Blvd. will be added; the existing access points will continued to be used. A. PRQPQ AL RE BEST : Planning Commission approval of a multi -building site plan is requested. B. EXISTING CONDITIONS: There is an existing one and one-half story residential structure on the property which contains approximately 2,330 square feet on its first floor level. ApYil 4, 1995 SUBDIVISION ITEM NO : 11 _ (Cont.) - FILE-,NQ_T.�; 5-1054 The property is zoned I-2, with I-2 zoned property on all abutting properties. C. ENGINEERING/UTILITY COMMENTS: Public Works Comments: 1) A grading permit will be required. 2) A stormwater detention analysis will be required. Water Works has no comments on this item. Wastewater comments that sewer is available, and that there will be no adverse effect if project is for a single owner. If two owners are involved, a sewer main extension, with easements, will be required. Arkansas Power and Light Co. comments that a 15 foot wide easement will be required along the north property line, and a 20 foot easement will be required along the east property line. Arkansas Louisiana Gas Co. approved the submittal without comment. Southwestern Bell Telephone Co. approved the submittal without comment. The Fire Department approved the submittal without comment. D. ISSUES LEGAL TECHNICAL DESIGN: The "Site Plan Review Criteria" sheet provided with the application requires the following information be furnished, which has not been shown on the site plan: dimensions of all existing and proposed buildings; dimensions of buildings from property lines and from each other; the radii of all drive lanes, curves, or turns; and, dimensions of all drives. All drives and streets intersecting all boundary streets across from the site are to be indicated and dimensioned. The required information is incomplete and needs to be furnished. Landscape review has no comments on this item. Sec. 31-13 requires site plan review for projects involving construction of 2 or more buildings on a site. 2